Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Personal Details :

PADEETAKARA IDIKULA SUSHIL Name Fathers Name Date of Birth Marital Status Present Address : : : P.I.SUSHIL : P.M. Idikula

23 JAN 1964 Divorced MIG 1/134 Hudco Civic Center ( P.O ) , BHILAI , Durg (Distt ) Chattishgarh, INDIA.

Contact Phone No Nationality Religion Languages Basic Qualification : : : :

: Indian Christian

Mobile No: 00919009638007 ,

English, Hindi, Malayalam H.S.C (Higher Secondary Certification) M.P. Board in 1983

Professional Qualification Additional training

: :

Diploma in Mechanical Engg in 1986 Training in Bond strand

Aramco permit test Emergency fist aid Passport No Expiry Expected Salary Declaration : I Here that the above information is given by me is true to best of my knowledge And belief and hence submit my resume for favorable consideration. Thanks. Date :25 /06/ 2011 : : F 7847709 : 02/07 /17 65,000 IRS ( Negotiable )

P.I. SUSHIL
MIG1-134 ,HUDCO ,BHILAI AMDINAGAR, CIVIC CENTER (PO ), DURG (DISTT.) CHATTISHGARH . Email address : sushilidikula@hotmail.com
[ Oil and Gas, Prod

Post Applied
MECHANICAL FO

Apply

SITE FOREMAN
United States 50233420

Equipment, Const

Work Experience : 12yrs in SAUIDI ARABIA , In Petrochemical and refinery Plants.(1997 to 2009 ) My Responsibilities in Sauidi Arabia Study Plans of Erection and Fabrication drawing.
Distribution of Drawings to Foremans and arranging Materials at site. Take of Material as per Drawing plan. Monitoring plan of Daily Progress as per. Ensure That Contractor /subcontractor Execute the work in accordance with the Approved Construction Drawing & approved method statement & procedure , Approved Construction Specification & Companys QHSE Requirements.

Preparation for Hydro test & Punch list of high


pressure gas line as per Plan Drawing or Isometric Drawing as per Sabic standard & Aramco standard

Ensure safety rules and Regulations.

My Responsibilities in Bhilai ( India ) :

10 yrs ( 1986 to 1997)

Study Plans of Erection and Fabrication.

Ensure That Contractor /subcontractor Execute the work in accordance with the Approved Construction Drawing & approved method statement & procedure , Approved Construction Specification & Companys QHSE Requirements of South Eastern railway. Take of Materials as per Drawing plan.

Jobs Found Displayi

You might also like