VENTAS

RETENCIONES PN
RETENCIONES PJ
ICA
IVA
RETENVION OBRA CIVIL

SERVICIOS
3.50%
3.50%
0.97%
16.00%
5.00%

Sem 1
CAJA INICIAL
+ VENTAS
- RETEFTE
- RETEICA
- APORTE ESPECIAL
- IVA
+ APORTES
DISPONIBLE
- COSTO VENTAS
Material y equipos
Importacion
M.O. Obra Civil
M.O. Cableado

$0.00
$38,752,300.00
$4,262,753.00
$374,347.22
$1,937,615.00
$0.00
$12,000,000.00
$44,177,584.78
$38,928,658.24
$38,554,465.44

HONORARIOS
6.00%
10.00%
4.00%
11.00%

617279

Sem 2
$4,145,346.54

Sem 3
$1,830,036.95

$0.00
$0.00
$0.00

$4,145,346.54
$1,954,309.59

$1,830,036.95
$0.00

$374,192.80

M.O. Instalacion equipos


Direccion Tecnica
- GASTOS ADMIN
Constitucion
Preoperativos
Arriendos
Servicios Publicos
Servicios Admin
Gastos financieros
Asesoria Contable
Auditoria contable

$632,580.00
y

$1,954,309.59
$361,000.00

$108,500.00

$68,580.00
$464,000.00
$0.00
$8,500.00
$261,000.00

Reserva vigencia U T
Caja Menor (papeleria,
transportes)
- PRESTAMOS
Capital
Intereses
- IMPUESTOS
SALDO FINAL

$100,000.00

$100,000.00

$100,000.00

$471,000.00
$231,000.00
$240,000.00

$0.00

$0.00

$4,145,346.54

$1,830,036.95

$1,721,536.95

Sem 4
$1,721,536.95

$1,721,536.95
$0.00

Sem 5
$545,036.95

Sem 6
$3,643,039.99

Sem 7
$7,387,155.19

Sem 8
$2,118,575.19

$17,000,000.00
$17,545,036.95
$13,329,996.96
$1,920,496.00
$8,770,500.00

$20,643,039.99
$12,894,884.80
$11,298,882.56

$7,387,155.19
$5,160,080.00
$1,581,080.00

$2,118,575.19
$0.00

$684,000.96

$1,596,002.24
$1,624,000.00

$0.00
$1,176,500.00

$1,955,000.00
$100,000.00

$0.00
$361,000.00

$1,955,000.00
$108,500.00

$0.00
$1,176,500.00

$0.00

$620,000.00
$0.00

$620,000.00

$8,500.00
$261,000.00
$195,500.00

$100,000.00
$0.00

$545,036.95

$261,000.00

$100,000.00
$472,000.00
$236,000.00
$236,000.00
$3,643,039.99

$261,000.00
$195,500.00

$100,000.00

$100,000.00

$100,000.00

$0.00

$0.00

$0.00

$7,387,155.19

$2,118,575.19

$942,075.19

Sem 9
$942,075.19

Sem 10
$360,075.19

Sem 11
($100,924.81)
$73,629,370.00
$6,394,129.50
$561,520.83
$3,681,468.50
$7,750,460.00

Sem 12
$46,149,866.37

Sem 13
$15,992,330.37

$942,075.19
$0.00

$360,075.19
$0.00

$55,140,866.37
$8,451,000.00

$46,149,866.37
$0.00

$15,992,330.37
$0.00

$6,496,000.00
$100,000.00

$0.00
$461,000.00

$1,955,000.00
$540,000.00

$825,000.00

$100,000.00

$464,000.00
$0.00
$440,000.00
$261,000.00
$100,000.00

$261,000.00

$100,000.00

$100,000.00

$100,000.00

$100,000.00

$100,000.00

$482,000.00
$241,000.00
$241,000.00

$0.00

$0.00

$29,332,536.00
$28,292,000.00
$1,040,536.00

$0.00

$360,075.19

($100,924.81)

$46,149,866.37

$15,992,330.37

$15,892,330.37

Sem 14
$15,892,330.37

TOTALES
$112,381,670.00

$15,892,330.37
$0.00

$1,111,000.00

$80,718,929.59

71.83%

$7,161,580.00

8.87%

$0.00
$0.00
$261,000.00
$750,000.00
$100,000.00
$0.00

$14,781,330.37

$30,757,536.00

UNION TEMPORAL SMART SPACES ECONOMIA 310


NIT: 900.394.572-6
CALLE 39 BIS 29 25
Bogot D.C., Colombia - Sur America
Tel/Fax: (57 1) 7428406 / 2680922

CRON
NOMBRE DEL PROYECTO:
CENTRO DE COSTOS:
IDENTIFICACION DEL CONTRATO:
SUPERVISOR DEL CONTRATO:
FECHA DE ELABORACION:
REVISION No.:

ACTIVIDAD
ADAPTACION CAVIDADES DE PISO
INSTALACION HOUSING BALAS DE PISO
INSTALACION CAJAS DE MONTAJE
GESTION FINANCIERA ANTICIPO
COMPRAS MATERIAL NACIONAL
COMPRA Y RECEPCION EQUIPOS IMPORTADOS
GESTION PREVIA DE IMPORTACION Y NACIONALIZACION
NACIONALIZACION DE EQUIPOS
INSTALACION BALASTOS
INSTALACION CONSOLAS DE CONTROL
CABLEADO BUS BALASTOS
CABLEADO DATOS EQUIPOS DE CONTROL
INSTALACION LUMINARIAS PISO
INSTALACION LUMINARIAS MURO
INSTALACION LUMINARIAS CIELORASO
INSTALACION LAMPARAS DE EMERGENCIA
INSTALACION CONTROL DE PARTICION
PROGRAMACION DEL SISTEMA Y CAPACITACION

IA 310

CRONOGRAMA DE PROYECTO TECNI


CONTROL E ILUMINACION AUDITORIO ECONOMIA U.N.
310
ODC 207
ING. JAVIER VELASQUEZ
27 de Dec de 10
0

Sem 1: DIC/29/10 ENE/04/10 Sem 2: ENE/05/11 ENE/11/11 Sem 3: ENE/12/11 ENE/18/11

ELABORO

YECTO TECNICO

Sem 4: ENE/19/11 ENE/25/11 Sem 5:: ENE/26/11 FEB/01/11 Sem 6: FEB/02/11 FEB/08/11

REVISO

Sem 7: FEB/09/11 FEB/15/11 Sem 8: FEB/16/11 FEB/22/11 Sem 9: FEB/23/11 FEB/27/11

APROBO

AUTOMATIZAR COLOMBIA E.U.


NIT: 900.236.673-5
Cra 11 A 93 A 62 Of. 303
Bogot D.C., Colombia - Sur America
Tel/Fax: (57 1) 7428406

CRONOGRAMA DE PROYECTO TECNICO


NOMBRE DEL PROYECTO: ESTUDIO Y ANLISIS DE CONSUMO Y BUENAS PRCTICAS DE USO ENERGA ELCTRICA CCB
CENTRO DE COSTOS: 311
IDENTIFICACION DEL CONTRATO: 60849/2011-1
SUPERVISOR DEL CONTRATO: ING. JAVIER VELASQUEZ
FECHA DE ELABORACION: 5 de Jul de 11
REVISION No.: 1

DESCRIPCION

Sem 1: Jul 25-Jul 29

Sem 2: Ag 1 - Ag 5

Sem 3: Ag 8-Ag 12

Sem 4: Ag 15-Ag 19

Sem 5: Ag 22-Ag 26

Recopilacin de documentos y anlisis de informacin


Determinacin de variables a medir y metodologa
Mediciones en campo
Anlisis de mediciones y resultados
Generacin de informe final y revisiones

ELABORO

REVISO

MA DE PROYECTO TECNICO

Sem 6: Ag 29-Sep 2

Sem 7: Sep 5-Sep 12

APROBO