Emp.

Name:
Date Job Name / Lead / PM

Signature:
Job # Phase # Comments Sign Off by Lead or PM

Week Ending:
Shift Travel (1,2,3) Hrs Reg OT Hrs DT Hrs TOTAL Hrs 0

Sunday
sunpower Armando Ramirez Eddy Oviedo 8413

Monday

0 8413

Tuesday
8413

Wednesday
8413

Thursday
8413

Friday
8434

Saturday Week Totals


WIRELESS # 300050
Job Phase Cable Pathway / Support Rough Riser Cooper Riser Termin. Fiber Riser Termination Test and Label Build Out IDF/MDF Wireless Survey

12/30

0 STRUCTURE # 100050
Phase # 14 22 28 32 34 36 38 Job Phase Wireless Testing Install Equipment Project Management Patching/Crosswire Miscellaneous Items T & M Phase Code Travel To/From Job Site Phase # 46 54 56 58 62 10 901 Job Phase Rough-in drops to location Cable Terminations Test and Label Build Out IDF/MDF Miscellaneous Items T & M Phase Code Travel To/From Job Site

0 Travel
Phase # 18 26 34 36 62 10 901

0 Reg

0 OT

0 DT

0.00
1.00
Job # 10060 10060 10065 30060 30060 30065 30070

Miscellaneous
Job Name V PTO SC R Training SC R Non Job SC V PTO WI R Training WI R Non Job WI R Vechicle WI

Antenna Install

44

Warrenty "WIWNTY"

1099

R Sales WI

30080

STRUCTURE # 100050 Job PhaseShort Code Phase Code Job Rough-in drops18 location to 180000 Cable Terminations 26 260000 Test and Label 34 340000 Build Out IDF/MDF 36 360000 Miscellaneous Items 62 620000 T & M Phase Code 10 100000 Travel To/From Job Site901000 901 Non Job Structure 10065

WIRELESS # 300050 Job Phase Short Code Wireless 38 Wireless Antenna Install 44 Wireless Testing 46 Install Equipment 54 Miscellaneous Items 62 T & M Phase Code 10 Travel To/From Job Site 901 Non Job Wireless 30065

Job Phase Code 380000 440000 460000 540000 620000 100000 901000