This document provides a daily progress report for steel erection on a construction project. It lists the block, item number, quantity of steel erected that day and its weight in kilograms, the cumulative weight of steel erected to date, and the overall progress percentage of the total steel required for the building. The document is signed off as being prepared by someone.
This document provides a daily progress report for steel erection on a construction project. It lists the block, item number, quantity of steel erected that day and its weight in kilograms, the cumulative weight of steel erected to date, and the overall progress percentage of the total steel required for the building. The document is signed off as being prepared by someone.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
This document provides a daily progress report for steel erection on a construction project. It lists the block, item number, quantity of steel erected that day and its weight in kilograms, the cumulative weight of steel erected to date, and the overall progress percentage of the total steel required for the building. The document is signed off as being prepared by someone.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd