APPENDIX A

MMDC offer for Hydrographic Survey at CPA Project (Final Agreed between PMS and MMDC 16 May 2011)
ITEM 1.0 1.1 DESCRIPTION HYDROGRAPHIC SURVEY Allow for Pre-dredge Hydrographic survey works of the dredging Lump Sum areas as per Construction Drawings and Specifications. Note: Rate includes all MMDC equipment and Surveyors necessary for hydro survey and include capturing and processing of data, providing digital data etc. include calculations of quantities and Hydro survey report and MMDC CAT A qualified Surveyor Endorsement. But does not include for Survey Boat Cost and Paper Drawing Cost. 1.2 Allow for one intermediate hydro survey for end of month interim quantity measuring hydro survey and one monthly checking hydro survey. Note: Rate includes all MMDC equipment and Surveyors necessary for hydro survey and include capturing and processing of data, providing digital data etc. include calculations of quantities. But does not include for Survey Boat Cost and Paper Drawing Cost and Qualified Surveyor Endorsement. Allow for intermediate hydro survey for checking of dredging work. Note: Rate includes all MMDC equipment and Surveyors necessary for hydro survey and include capturing and processing of data, providing digital data etc. include calculations of quantities. But does not include for Survey Boat Cost and Paper Drawing Cost and Qualified Surveyor Endorsement. No. 20.00 (Provisional) 3,800.00 76,000.00 1.00 12,000.00 12,000.00 UNIT QTY RATE (USD) AMOUNT (USD)

1.3

No

Rate only

1,125.00

1.4

Allow for Post-dredge Hydrographic survey works of the Lump Sum dredging areas as per Construction Drawings and Specifications. Note: Rate includes all MMDC equipment and Surveyors necessary for hydro survey and include capturing and processing of data, providing digital data etc. include calculations of quantities and Hydro survey report and MMDC CAT A qualified Surveyor Endorsement. But does not include for Survey Boat Cost and Paper Drawing Cost.

1.00

12,000.00

12,000.00

TOTAL United States Dollar: One Hundred Thousand Only

USD 100,000.00

MALAYSIAN MARITIME & DREDGING CORPORATION SDN BHD 23 May 2011