Professional Documents
Culture Documents
Total Nitrogen Require 1566.75: Botad Spur Line Project
Total Nitrogen Require 1566.75: Botad Spur Line Project
Total Nitrogen Require 1566.75: Botad Spur Line Project
Volume Calculation
Despatch Station
Sl No.
Dia
ID(M) Length(M)
1
2
3
4
5
6
7
8
1"
2"
3"
4"
8"
12"
18"
0.02
0.05
0.07
0.1
0.19
0.29
0.41
Launchar
Total
Sl No.
Dia
1
2
3
4
5
2"
3"
4"
6"
8"
Sl No.
Dia
1
2
3
4
5
6
1"
2"
3"
4"
8"
0.5
40.6
26.6
12.3
60.6
14.8
14
Dia
8" (6.4)
8" (7.9)
Total
Water(L)
0
0.08
0.11
0.09
1.79
0.98
1.85
0.4
5.3
0.23
77.46
114.04
91.41
1792.23
976.4
1849.22
398.3
5299.29
Tap-Off Station
ID(M) Length(M) Volume
0.05
0.07
0.1
0.15
0.19
Total
9.14
0.5
2.04
3.7
19
0.02
0
0.02
0.06
0.56
0.66
0.02
0.05
0.07
0.1
0.19
Receiver
1.5
42.7
45.6
18.43
30.89
0
0.08
0.2
0.14
0.91
0.4
1.73
20451.7
2848.19
Water(L)
0.7
81.47
195.49
136.96
913.68
398.3
1726.6
Mainline Length
ID(M) Length(M) Volume
0.21
0.2
Water(L)
17.44
2.14
15.19
63.05
561.92
659.75
Receiving Station
ID(M) Length(M) Volume
Total
Sl No.
Volume
Water(L)
683.28
92.41
775.69
1566.75
project
on
Volume at
Ambient
Pressure
Volume at 2 bar
0
0.08
0.12
0.09
1.82
0.99
1.87
0.4
5.37
0
0.15
0.23
0.18
3.58
1.95
3.7
0.8
10.6
0.02
0
0.02
0.06
0.57
0.67
0.03
0
0.03
0.13
1.12
1.32
0
0.08
0.2
0.14
0.93
0.4
1.75
0
0.16
0.39
0.27
1.83
0.8
3.45
692.16
93.61
785.77
1366.56
184.82
1551.37
M3
myrifrancis05@gmail.com
Despatch Station
Sl No.
Dia
2
3
5
6
7
2"
3"
8"
12"
18"
ID(M) Length(M)
0.05
0.07
0.19
0.29
0.41
Total
6.00
7.00
8.00
18.00
16.00
Volume
Water(L)
0.01
0.03
0.24
1.19
2.11
3.58
11.45
30.01
236.6
1187.51
2113.4
3578.96
0.01
0.03
0.24
1.2
2.14
3.63
Volume at 2 bar
0.02
0.06
0.47
2.38
4.23
7.16
Despatch Station
Sl No.
Dia
2
4
7
2"
6"
18"
ID(M) Length(M)
0.05
0.15
0.41
Total
3.00
4
5.00
Volume
Water(L)
0.01
0.07
0.66
0.73
5.72
68.13
660.44
734.29
0.01
0.07
0.67
0.74
Volume at 7bar
0.04
0.48
4.62
5.14