REKOD PEKERJA : LAPORAN NO 2

BIL PEKERJA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

PENGURUS TAPAK PENYELARAS TAPAK PENYELIA OPERATOR MESIN 1 TUKANG KAYU TUKANG KONKRIT TUKANG BESI PEKERJA AM 2 PEKERJA PILING JURUKUR 1 PEKERJA ELEKTRIK TUKANG PAIP PEMASANG LONGKANG PEKERJA ATAP TUKANG BATA

MAY 2011 27 28 29 30 1 2 3 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

3 1

3 1

3 3 3 3 1 1

3 3 2 2 2 2 1 1

3 1

3 1

3 1

3 1

3 1

JUMLAH

6 5 4

4 4 4 5 4 4 5

REKOD LOJI / JENTERA : LAPORAN NO 2

BIL LOJI/JENTERA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Backhoe Excavator Bar Bender Bar Cutter Generator Set Crane Survey Equipment Compressor 1 ton lorry Engine Hand Compactor Handbreaker Concrete Mixer Lorry (6 Wheeler) 1 Lorry ( 10 Wheeler) V.Roller Backpusher Piling Machine 1 Low Roader Water Pump Welding Set JUMLAH 4

MAY 2011 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

4 4 4 4 4 4 4 4 4 4

KELULUSAN BAHAN BINAAN


BIL 1 KETERANGAN BAHAN R.C PILE NAMA PEMBEKAL AZIMAT TEGUH INDUSTRIES PIHAK YANG MELULUSKAN CS AZIMAT TEGUH ENGINEERING STATUS LULUS TARIKH PERMOHONAN 10/6/2011 TARIKH DILULUSKAN 10/6/2011 CATATAN Mesyuarat tapak 2