OPERATING & MAINTENANCE COST OF DM PLANT Client Name: Basis of Calculation: Operating Hours: Power Cost: Operating Days

Chemical Cost: Chemical Name RELIANCE HOUSE Date: 22/07/2011

22 5.5 350

hrs. per Day Rs. Per KWH days per year

Product Flow: Recovery Feed flow Per day outflow

9 M3/Hr. 85.00% 10.59 M3/Hr. 198 Total Cost per day (Rs.)

Dosing (ppm) Req. Per Day (Kg) Unit Cost (Rs.)

Acid (HCl: 30%) NaOH (100%) pH Correction Total Consumables Cost: Qty. Cation resin Anion Resin

80 120 5

18.64 27.95 1.16

12 30 12

223.62 838.59 13.98 1076.19

Life (Year) 3100 3500 0 0 5 5 0 0

Total Power Cost: KW Rating DM Feed Pump DM Water Transfer Pump DG Blower 3 3 2 KW/day 66 66 30

Unit Cost (Rs.) Total Cost per day (Rs.) 52 92.11 136 453.33 0 0.00 0 0.00 545.45

Unit Cost (Rs.) Total Cost per day (Rs.) 5.5 363 5.5 363 5.5 165

Total OVERALL TOTAL Per M3 cost of DM Plant

891 2512.64 12.69