NATIONAL HIGHWAYS AUTHORITY OF INDIA


4-Laning and Strengthening of Existing 2-Lane Road from Km 265.000 to 380.000 Dhule to Pimpalgaon Section of NH-3 in the State of Maharastra
Contractor : IRCON - SOMA JV Sub. Contractor : Concessonaire : IRCON - SOMA Tollway Pvt. Ltd. Testing Laboratory : Malegaon

SIEVE ANALYSIS OF FINE AGGREGATE


IS: 383-1973
Package No: A Source Location Activity : Girna River : VNC Batching Plant : Concrete 1750 gms % Cum. weight retained 0.00 7.89 28.69 61.66 75.77 87.14 97.31 % Passing 100 92.11 71.31 38.34 24.23 12.86 2.69
Zone-2

Date of Sampling: 15.07.06 Date of Testing : 17.07.06 Type of material : Sand

Total weight of the Sample : Wt.of Sieve size % Weight material in mm retained retained 10 4.75 2.36 1.18 0.60 0.30 0.15 0 138 364 577 247 199 178 0.00 7.89 20.80 32.97 14.11 11.37 10.17
Zone-1

Specified Limits Zone-1 Zone-2 Zone-3 Lower Upper Lower Upper Lower Upper 100 90 60 30 15 5 0 100 100 95 70 34 20 10 100 90 75 55 35 8 0 100 100 100 90 59 30 10 100 90 85 75 60 12 0
Zone-3

100 100 100 100 79 40 10

100 80
% Passing

100 80 60 40 20
% Passing
% Passing

100 80 60 40 20

60 40 20

1
Sieve Size

10

1
Sieve Size

10

1
Sieve Size

10

Finess Modulus : 3.58 Remarks :

Tested by

Checked by

Sub Contractor

IRCON / SOMA

SPV Representative