Professional Documents
Culture Documents
2D instructionsPDF
2D instructionsPDF
2D instructionsPDF
-315 feet of 3 tape all raw -370 feet of 6 tape 6 edges at -2 people for 95% of the work 6 6 home -Ships in 4 x 8 stack Instructions for 8 Hexayurt, using 2D Assembly Strategy. Also information on making a pseudo-semi-folding hexayurt Roof Assembly:
Tape together kites from the outside surface (usually the logo-free side). (gap is 1/2 the thickness of panel) Then, tape kites together from the inside surface (probably the logo-side)
o Lo Lo go
TM
TM
MT
MT
TM
o go L og oL
g
Lo
go
og
oL
*When you cut down the hexayurt, youll cut it into 2 half-roofs!
v Lo
go
TM
MT
g goL Lo
og
MT
vo
Wall Assembly: either make 3 wall-sections of 2 panels each, or get fancy and add more panels (below)
For the best rain protection, tape from the exterior surface leaving a gap between panels that is equal to the thickness of your panel.
Not excellent rain protection but easier: tight hinges from the inside surfaces.
*When you cut down the hexayurt, youll cut it into 2-panel sections.
Lo
Lo
go go Lo Lo go
tight hinge: from interior
Wall Assembly: makes 2 half-walls. Repeat alternating tight-loose hinges to make a 6-panel wall section.
Lo o go Log Lo M Lo go go Lo Lo go Lo Lo go Lo go Lo go
TM
Lo go Lo go
T
o go Log
o go Log
Lo
Lo
Lo
Lo go
TM
TM
TM
go
go
TM
TM
o go Log
o go Log
go
Lo
go Lo
Lo
Lo
Lo
TM
TM
TM
TM
loose hinge gap is equal to the thickness of your panel, tape from the outside surface
TM
go
go
go
Lo
TM
TM
go
*When you cut down the hexayurt, youll cut it into 3-panel sections.