Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

STRATEGIC INTERVENTION AREAS

PROGRAM/PROJECT

OBJECTIVELY VERIFIABLE INDICATORS (OVI)

MEANS OF VERIFICATION (MOV)

Program A (Brief and Objectives)

Specify the source of information for the Are the direct or indirect measures that will verify to measurements or verification specified in the what extent the objectives have been fulfilled. The indicators column. For example, will statistics from term "objectively" implies that these should be an external source be used for the verification or specified in a way that is independent of possible will project resources be used to gather the bias of the observer. statistics.

Program B (Brief and Objectives)

Program C (Brief and Objectives)

ASSUMPTIONS AND RISKS (EXTERNAL FACTORS)


Are important events, conditions, or decisions which are outside the control of the program but which must remain favorable for the program objectives to be attained. The implication is the design team has an obligation to consider what might derail their efforts and to plan responsibly to mitigate that risk of "derailment".

ACTIVITIES
A1.1 A1.2 A1.X A2 AX B1 B2 BX C1 C2 CX

TASKS
T1 T2 TX

INPUTS LEAD PARTNER/S

INPUTS MATERIALS

FINANCIAL

TIME

You might also like