Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Testing: Unit Testing / User Manual

Module: Quality Management

ENVIRONMENT SYSTEM CLIENT : SAP R/3 ECC 6.0 : 200

UNIT TESTING SCENARIO SCENARIO NUMBER DESCRIPTION : BPML QM03-02 : Inspection

at Suppliers location

PREPARED & TESTED BY NAME SIGNATURE DATE TEAM Approved by : S R Baviskar : : : : Kabir R (PwC)

Page 1 of 6

Testing: Unit Testing / User Manual

Module: Quality Management

1) Change Material mm02:

Click on Insp Setup

Page 2 of 6

Testing: Unit Testing / User Manual

Module: Quality Management

1Click on Inspection Type 2 Select Insp type as 0101 3 Activate the same 4 Save by clicking.

Page 3 of 6

Testing: Unit Testing / User Manual

Module: Quality Management

1 Click QM Proc. Active 2 Select Z400 in QM Control Key 3 Save

2) Create Quality Info Record:


Transaction code QI01

Page 4 of 6

Testing: Unit Testing / User Manual

Module: Quality Management

1 Trans code QI01 2 Enter Vendor 3 Enter Plant

In Insp. control header 1. Enter Source Insp.type 0101 2. Tick source insp - no GR 3. Put Lead Time days 4. Save

Page 5 of 6

Testing: Unit Testing / User Manual

Module: Quality Management

3) Inspection Plan should have Task list Usage as 51

1.Put Usage as: 51 Goods receipt model 2 Save

4) T code: QI07 Work list of Source Inspection


Through the same transaction inspection lot can be triggered selecting the materials.

1 Enter Vendor code 2 Enter Material 3 Plant 4 Execute

Page 6 of 6

You might also like