The document discusses reactivating a block lock on January 9, 2011 for block N/A. The daily dunning processes were used to reactivate the block lock numbered 508. The reactivation of the lock for block N/A was later cancelled.
The document discusses reactivating a block lock on January 9, 2011 for block N/A. The daily dunning processes were used to reactivate the block lock numbered 508. The reactivation of the lock for block N/A was later cancelled.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
The document discusses reactivating a block lock on January 9, 2011 for block N/A. The daily dunning processes were used to reactivate the block lock numbered 508. The reactivation of the lock for block N/A was later cancelled.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Power and Water Utility Company For Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-C-2016 Project Name Date: 08 Mar 2011 Contract Number Page 1 of Revision 1