Professional Documents
Culture Documents
JLportfolio
JLportfolio
JLportfolio
03 / 2008 v 1.1
Project Architect
JOHN LE | Architecture Rollins Congressional Pool Clubhouse - Rockville, MD
MV+A Architects, 2006
V O E L Z K
A S S O C I A T
CONSULTANT LOGO
Rockville, Maryland
Rollins Congressional
Clubhouse
451 Martha Terrace
REVISIONS
ISSUE:
PERMIT SET 0
BID SET 0
J O B N O.
Project Architect
JOHN LE | Architecture Rollins Congressional Pool Clubhouse - Rockville, MD 0040.01
MV+A Architects, 2006
DATE
09/03/04
Project Architect
JOHN LE | Architecture Charleston Alexander Jewelers - Bethesda, MD
MV+A Architects, 2005
Design Architect
JOHN LE | Architecture Promenade Tysons Corner - Tysons Corner, VA
MV+A Architects, 2008
Design Architect
JOHN LE | Architecture Promenade Tysons Corner - Tysons Corner, VA
MV+A Architects, 2008
Project Architect
JOHN LE | Architecture Museum for Vietnamese Boat People - Ottawa, ON
Pro-bono, 2005
Ground Floor Second Floor Third Floor
office / storage
W/C W/C
Kitchen /
storage
stair stair stair
W/C
parking W/C
office Exhibits
Multi-Purpose
Room / exhibits
Elev.
M.R. Sprinkler Mech. W/C
Exhibits
Entrance
Vestibule / Retail
exhibits
Reading
Stair Entrance stair room / stair
exhibits
Project Architect
JOHN LE | Architecture Museum for Vietnamese Boat People - Ottawa, ON
Pro-bono, 2005
Project Architect (Design)
JOHN LE | Architecture Safeway Facade Study - Brandywine, MD
MV+A Architects, 2006
Project Architect (Design)
JOHN LE | Architecture Retail Development - Brandywine, MD
MV+A Architects, 2006-2007
Project Architect (CD's)
JOHN LE | Architecture University Town Center - Hyattsville, MD
MV+A, 2006
Project Architect (CD's)
JOHN LE | Architecture The Goddard School - Rockville, MD
MV+A, 2003
C C C C C C
+37'-0"
TOP OF
+36'-1"
TOP OF
+21'-8"
LOFT LE
+12'-0"
MEZZA
0'-0"
GROUN
ON 1
Project Architect
JOHN LE | Architecture VKarting - Chantilly, VA
Envision Design, 2000
CORRIDOR
48
7
5'-0
9"
#211 CHANGING
5'-
8'-
JANITOR ROOM
4"
#209 #202
STORAGE
elev
#214
5'-0"
STORAGE ARCADE
WOMENS'
"
#223 #215 MENS'
'-6
VESTING
22'-0"
ROOM ROOM
10
ROOM
#213 #212
#218
STORAGE ELEC. STOCK ROOM RESTROOM
#217 ROOM #208
8"
#206
#266
3'-
EXECUTIVE
3'-5"
0
5'-0"
5/
SUITE TYP.
10"
71/4"
8"
DN PRO SHOP
#207 #204
CORRIDOR
8 8
71/4"
PRO
8"
9'-
SHOP OFFICE
8"
#203 #205
EXIT STAIR #1
#124
2'-3" 2'-3" 2'-3"
5'-
2'-3" 2'-3" 2'-3" 2'-3" 2'-3" I "
2 @ 4'-6" 4 @ 4'-6" 4 @ 4'-6" 4 @ 4'-6" VARIES 1'-0
0"
(SLOPING) "
4'-6 "
2'-0
28'-01/2"
A B C D E F G H J K L M
EQ Z
"
EQ
'-7
O.
25
" R.
1/2
" '-5
4'-6
PARTIAL DRAWINGS
46
"
3'-4
"
45.0° 1/4 1/2
27.4° '-7 '-6
11 52
"
"
"
N
'-8
2'-0
19
SECOND FLOOR OVERVIEW PLAN
SCALE: 1/16"=1'-0" 2 X
8"
3'-
A B C D E E.5 F F.4 G G.5 H H.5 I J K L M
495'-21/2"
71/4" 22'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 22'-0" 71/4"
LOADING
EXIT STAIR #3
#126
71/4"
71/4"
1 1
ELEVATOR
UP MACHINE
ROOM
SERVICE ELEV #2
#120
LIQUOR SWITCHGEAR
STORAGE ROOM
UP
#119 #121
UP
22'-0"
24'-0"
1'-1"
DN
PARTS
CORRIDOR #115
#118
5'-8"
2'-0"
WATER
HEATER
CLOSET
2 PURCHASING MAIN TEL.
48'-0"
#128
2.1 OFFICE #122 2.1
#116
UP
DRY
STORAGE
"
11
#117 CART EXIT STAIR #4
MAINTENANCE #127
#113
20'-6"
24'-0"
0"
8'-
45'-0"
OFFICE
2.8 #114
1'-
1"
3
22'-6"
22'-6"
4
45'-0"
4.2
#112 #111
22'-6"
( SLOPING )
2'-3" VARIES
45'-0"
4.8
2'-3"
22'-6"
2"
1/
10
"
BRIEFING #1
4 @ 4'-6'
22'-6"
11
8'-
#109
CORRIDOR/
ENTRANCE
BRIEFING #2 #102
2'-3"
#110
6
7'-
45'-0"
5"
6.2
2'-3"
1'-1" ELEVATOR
EQUIP MACHINE
#103 ROOM
#105
4"
22'-6"
#125
4 @ 4'-6"
5 1/
LAUNDRY
8'-
#104
48'-0"
2'-3"
LOCKER ROOM
"
'-6
#108
6.9
16
UP
U
P
2'-3"
8"
4"
7 3/
6'-
elev
0
1/
2"
WOMENS' MENS'
22'-0"
ROOM ROOM
4 @ 4'-6"
8'-
#107 #106
10
"
ENTRANCE LOBBY 2'-3"
15'-01/4" 21'-2"
STAIR #1 #101
71/4"
71/4"
UP
#124
8 8
10"
1'-9"
71/4"
±8"
8"
2'-11/4"
1'-10 3/4"
VARIES 2 @ 4'-3 3/4" 2'-21/2" 6 @ 4'-3 3/4" 2'-5" 18'-7 1/2" 3 @ 4'-3 3/4" 2'-21/2" 2'-11/4"
±8" 71/4" WATER EQUIPMENT ( SLOPING ) 2'-3" 9 @ 4'6" 2'-3" 2'-3" 4 @ 4'-6" 1'-9"
1'-9" #123
Z
22'-6" 22'-6" 24'-0" 21'-0"
26'-91/4"
22'-6"
"
'-7
C.9
25
15'-0"
19'-1 1/2"
I Y
"
'-8
19
N
Project Architect
JOHN LE | Architecture VKarting - Chantilly, VA
Envision Design, 2000
A B C D E F G H I J K L M
71/4" 22'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 22'-0"
71/4"
71/4"
1 1
4'-0"
SERVICE CORRIDOR 5'x9' STORAGE
1'-9"
DN
7'-10"
CAGE
#244 MANAGER
SERVICE ELEV #2 CORRIDOR ACCT.
BREAK OFFICE
#232
ROOM #258 #259
SIM #257
3 @ 4'-6"
ELEC.
22'-0"
ROOM EMPLOYEE
4"
5 3/
#243 BREAK ROOM
5'-0"
5'x9' SECURE
9'-
#238 CORRIDOR
COAT CONFERENCE STORAGE
CHECK #260
STORAGE CAGE W/ MKTG.
(SLOPING)
#242 SHELVES
VARIES
#239 #261
CONFERENCE
ROOM
#245 CONFERENCE CONFERENCE CONFERENCE
2 FZ ROOM ROOM ROOM A/V
ROOM
48'-0"
#247 #248 #249
#250 SERVER
CLOSET SALES
MAIN RESTAURANT #255 #254 #262
CONFERENCE 5'-1"
KITCHEN MANAGER
#230 CONFERENCE RESTROOM
#240
KITCHEN RECEPTION #256 EXIT STAIR #4
OFFICE #241 #127
#231
#265 SIM CONFERENCE
ROOM COPY
#246 #263
GREEN
ROOM
WOMENS' MENS' #252 RECEPTION
ROOM ROOM
45'-0"
#253
DN
#234 #235 SIM BREAK OUT
BAR
5'-5"
CORRIDOR
#264
TYP.
45'-0"
RESTAURANT
#227
161'-101/2"
161'-21/2"
45'-0"
5
LOUNGE
#226
OBSERVATION
4'-8"
31/2"
CORRIDOR
#225
6
RECEPTION
45'-0"
#201
DN
TECH
ROOM
#221 LASER TAG
RECEPTION
EXIT STAIR #2 #220
D
N
#125
SNACK BAR
5'-0" ARCADE #210
LASER BRIEFING
TAG ROOM MANAGER
222 #219 #216 SIM
48'-0"
CORRIDOR
5'-0"
7
9"
#211 CHANGING
5'-
8'-
JANITOR ROOM
4"
#209 #202
STORAGE
elev
#214
5'-0"
STORAGE ARCADE
WOMENS'
"
#223 #215 MENS'
'-6
VESTING
22'-0"
ROOM ROOM
10
ROOM
#213 #212
#218
STORAGE ELEC. STOCK ROOM RESTROOM
#217 ROOM #208
8"
#206
#266
3'-
EXECUTIVE
3'-5"
0
5'-0"
5/
SUITE TYP.
10"
71/4"
8"
DN PRO SHOP
#207 #204
CORRIDOR
8 8
71/4"
PRO
8"
9'-
SHOP OFFICE
8"
#203 #205
EXIT STAIR #1
#124
2'-3" 2'-3" 2'-3"
5'-
2'-3" 2'-3" 2'-3" 2'-3" 2'-3" I "
2 @ 4'-6" 4 @ 4'-6" 4 @ 4'-6" 4 @ 4'-6" VARIES 1'-0
0"
(SLOPING) "
4'-6 "
2'-0
28'-01/2"
A B C D E F G H J K L M
EQ Z
"
EQ
'-7
O.
25
" R.
1/2
" '-5
4'-6
PARTIAL DRAWINGS
46
"
3'-4
"
45.0° 1/4 1/2
27.4° '-7 '-6
11 52
"
"
"
N
'-8
2'-0
19
SECOND FLOOR OVERVIEW PLAN
SCALE: 1/16"=1'-0" 2 X
8"
3'-
A B C D E E.5 F F.4 G G.5 H H.5 I J K L M
495'-21/2"
71/4" 22'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 45'-0" 22'-0" 71/4"
LOADING
EXIT STAIR #3
#126
71/4"
71/4"
1 1
ELEVATOR
UP MACHINE
ROOM
SERVICE ELEV #2
#120
LIQUOR SWITCHGEAR
STORAGE ROOM
UP
#119 #121
UP
22'-0"
24'-0"
1'-1"
DN
PARTS
CORRIDOR #115
#118
5'-8"
2'-0"
WATER
HEATER
CLOSET
2 PURCHASING MAIN TEL.
48'-0"
#128
2.1 OFFICE #122 2.1
#116
UP
DRY
STORAGE
"
11
24'-0"
0"
8'-
45'-0"
OFFICE
Project Architect
2.8 #114
1'-
1"
22'-6"
4
Envision Design, 2000
45'-0"
4.2
#112 #111
22'-6"
( SLOPING )
2'-3" VARIES
45'-0"
4.8
2'-3"
SEE 3/A0.6 FOR CONTINUATION OF 7 9 4
DETAIL IN CORRIDOR A0.6 OPP A0.6 SIM ECOPHON FOCUS D 12" ECOPHON FOCUS L 41/2" A0.6 TYP @ CONF
2 ROOM #1106
3" MIN.
A0.6
+8'-10" +9'-4"
CEILING AS SCHEDULED UNDERSIDE UNDERSIDE
+9'-1" @ PERIMETER ROBERT E. TORRAY & CO. CEILING CEILING
OFFICES
+8'-10" @ ALL OTHER ECOPHON "FOCUS L-LINE" ECOPHON FOCUS D ACT
ROOMS
CURVED ACT IN SIDE CHANNEL,
+8'-10" MOUNTED TO BLOCKING TO HIDE 10 SCHEDULED COVE LIGHT FIXTURE
SM-21 COVE, PTD P-2 CHANNEL FROM VIEW - PROVIDE CLEARANCE PER
UNDERSIDE A0.6 SIM,
CEILING MANUFACTURER
10 BLOCKING AS REQUIRED OPP RECOMMENDATIONS
A0.6 SIM SM-21 COVE, PTD P-2 +8'-10 1/4"
5/4 STOCK PIECE 2" +8'-4"
ST-1 COUNTER
5/4 STOCK PIECE, PTD P-2 6
UNDERSIDE TOP OF CROWN MOULDING
4 ECOPHON4 'L' A0.6 TYP
A2.3 A2.3
BLOCKING
SM-21 COVE, PTD P-2
BLOCKING SM-21 COVE, PTD P-2
SM-84 COVE, PTD P-2 5/4 STOCK, PTD P-2
2"
5/4 STOCK, PTD P-2
TRIM PIECE SM-84
SM-84 COVE, PTD P-2 2" +8'-4"
1/4"
UNDERSIDE
3"
BULKHEAD
SM-56 PANEL MOULD, PTD P-2
+7'-0" CEILING AS SCHEDULED
UNDERSIDE PARTITION AS SCHEDULED
STOP
LWM - 953 BULLNOSE STOP , PTD
P-2 PARTITION AS SCHEDULED
SM-21 COVE, PTD P-2
ENTRY DOORS
SCALE: 3/8"=1'-0" 1 RECEPTION
SCALE: 3/8"=1'-0"
AREA / CONFERENCE ROOM PARTITION AS SCHEDULED
2"
3
A0.6
2 8 8
OPP 31/2"
A0.6 A0.6
A0.6
E. TORRAY
7501 Wisconsin Avenue
MD Avenue
CEILING TRIM @ NON-PERIMETER OFFICES CORRIDOR CEILING CONFERENCE ROOM #1106 CEILING
20817
Bethesda, MD 20817
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
Wisconsin
ECOPHON FOCUS D 12" ECOPHON FOCUS L GWB BULKHEAD SEE 3/A0.6 FOR CONTINUATION OF
DETAIL
EXTENT OF PARTITION
East Tower,
11
BEYOND - SEE PLAN
Bethesda,
A0.6 SIM 11 ECOPHON "FOCUS L-LINE"
1/8" GLAZING, TYPICAL ALL A0.6 CURVED ACT IN SIDE CHANNEL,
MOUNTED TO BLOCKING TO HIDE 6
WINDOWS AND SIDELIGHTS 6
PROVIDE SAFETY GLAZING WHERE BLOCKING CHANNEL FROM VIEW A0.6
6
ROBERT
REQUIRED BY CODE (I.E. A0.6 TYP
A0.6
7501
SIDELIGHTS , GLAZING ADJACENT PARTITION AS SCHEDULED +9'-4"
BLOCKING AS REQUIRED
TO DOORS) UNDERSIDE
ECOPHON 'D' +8'-4"
ECOPHON "FOCUS L-LINE" UNDERSIDE
SM-45, PTD P-2 CURVED ACT IN SIDE CHANNEL, CEILING
+8'-4"
3 EQUAL LITES
01001
SM-2012 OVOLO STICKING, PTD
2"
SM-89 PLINTH BEYOND A0.6
+7'-3"
1/4"
SM-21 COVE, PTD P-2 2" UNDERSIDE
WM-129 SHOE MOULD AT WOOD BULKHEAD
FLOORS, PTD P-2 2" 2"
5/4 STOCK, PTD P-2
SCHEDULED FINISHED FLOOR 10"
SM-84 COVE, PTD P-2
WM-110 STOP, PTD P-2
PILASTER BEYOND - SEE DETAIL
PARTITION AS SCHEDULED 12/A0.6
2"
SM-45 CHAIR RAIL CENTERED
CHAIRRAIL ACROSS FRONT OF
31/2"
TOP OF CHAIR RAIL BELOW WM-753 ALONG TOP EDGE OF BLOCKING AS REQUIRED
BLOCKING COUNTERTOP, PTD P-2
SM-70 STICKING
SCALE: 3/8"=1'-0"
BLOCKING MDF TRIM, PTD P-2
9 BLOCKING AS REQUIRED
TYPICAL SASH STOCK , PTD P-2 A0.6
FABRIC PANELS WITH 4 9
INTERIOR ELEVATIONS
8 8
2"
FUTURE PLASMA
RECESSED PULLS @ SIM A0.6 A2.3 MDF TRIM , PTDA0.6
P-2 OPP
3'-11/4"
2"
MDF TRIM, PTD P-2 2" 2"
SM-57 RAISED PANEL MOULD
2"
10"
BULKHEAD ABOVE - SEE DETAIL
41/2"
8/A0.6
TRIM DETAILS
31/2"
31/2"
10"
10
A0.6 SIM
2"
2"
6
6 10 A0.6 TYP
BLOCKING
2"
2"
A0.6 TYP A0.6
A0.6
INTERIOR
SCALE: 3"=1'-0"
WINDOW SECTION 9 PLAN SECTION @ WINDOW
SCALE: 3" = 1'-0" 10 PLAN SECTION @ RECEPTION CASED OPENING
SCALE: 3" = 1'-0" 11 PLAN SECTION @ PILASTER
SCALE: 3" = 1'-0" 12
A/V CABINET @ CONFERENCE ROOM 1106
SCALE: 3/8"=1'-0" 8 OFFICE 1113 (SHOWN FLATTENED)
SCALE: 3/8"=1'-0" 9 DOORS @ OFFICE 1115
SCALE: 3/8"=1'-0" 10 A2.1
copyright envision design PLLC 2001