Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Work Description 2011 7

27

Request Quotation
Request quotationReceiveCheck Spec.DrawingConfirm Spec.Make quotation Sales (CS) CAD/CAMCAD/CAMEngineering CS CS Sales Incharge ApproveSubmitSubmit

Request Tooling QuotationReceiveDetail quotationSubmit quotationSubmit Sales CS(Engineering) CSSales Incharge

Technical Engineering
Confirm spec. & process for new quotation request Sample making, prior checking for new model (investigate/study before mass pro Sample making, setup for mass pro including sampling improvement for problem/critical Improvement for items critical in quality Improvement of machine use (increase capability & improvement of trouble equipments) - Window person with contractor / maker Evaluation & approve of new material / change material - Window person with supplier / maker In process product/manufacturing confirmation & periodically parameter checking Improvement item requested from a process (production) acceptance, audit/inspection Responsible for confirmation of new equipments process flow Technical support to Sales Maintenance of spec. related items/ documents Production spec. changes/ modification Technical support to Production Conduct technical meeting Instruct order arrangement of Press Tooling & Checker Jig

Maintenance Engineering
Responsible for new equipment setup/ installation Window person with supplier / maker Responsible for new equipment layout (production line) Window person with supplier / maker Modification of equipment for improvement (Window person to request supplier/maker for improvement/modification coordinator) Repair/ improvement upon request from process (production)

Responsible for cost improvement item (increase process/ machine capability & productivity, sub material reduction) Equipment check during process maintenance (prevent equipment/ machine trouble)

You might also like