01 MaxL Without Complete

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Electrical Transient Analyzer Program


Load Flow Analysis
Loading Category (1):

Design

Generation Category (1):

Design

Load Diversity Factor:

None

Swing

V-Control

Load

Total

32

33

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

13

18

32

Number of Buses:

Number of Branches:

Method of Solution:

Newton-Raphson Method

Maximum No. of Iteration:

99

Precision of Solution:

0.0001000

System Frequency:

50 Hz

Unit System:

Metric

Project Filename:

LAFAFZARIN

Output Filename:

D:\Safaripour\pROj\LAfAfzAriN\eTaP\01-maxL-without.lfr

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Adjustments
Apply
Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Bus Input Data


Load
Bus
ID

Initial Voltage
kV

Sub-sys

% Mag.

Ang.

Constant kVA
MW

Mvar

Constant Z
MW

Constant I

Mvar

1.hospian bus

0.400

100.0

0.0

0.060

0.045

2.ran jakart bus

0.400

100.0

0.0

0.600

0.450

3.30 jazire bus

0.400

100.0

0.0

0.378

0.284

4.LAFAF ZARIN bus1

0.400

100.0

0.0

0.134

0.051

5.LAFAF ZARIN bus2

0.400

100.0

0.0

0.200

0.100

6.cheragh sazi bus

0.400

100.0

0.0

0.378

0.284

7.ravan zip bus

0.400

100.0

0.0

0.240

0.180

8.kamran bus

0.400

100.0

0.0

0.120

0.090

9.janbaz bus

0.400

100.0

0.0

0.120

0.090

10.nobogh bus

0.400

100.0

0.0

0.480

0.360

11.anbar frozan bus

0.400

100.0

0.0

0.188

0.141

12.gama khodroo bus

0.400

100.0

0.0

0.120

0.090

0.480

0.360

3.499

2.524

13.froozan bus

0.400

100.0

0.0

Bus5

0.400

100.0

0.0

Bus7

0.400

100.0

0.0

Bus10

0.400

100.0

0.0

LAFAF MAIN BUS

20.000

100.0

0.0

MANAVI

20.000

100.0

0.0

nd01

20.000

100.0

0.0

nd02

20.000

100.0

0.0

nd03

20.000

100.0

0.0

nd03_1

20.000

100.0

0.0

nd04

20.000

100.0

0.0

nd05

20.000

100.0

0.0

nd06

20.000

100.0

0.0

nd06_1

20.000

100.0

0.0

nd07

20.000

100.0

0.0

nd08

20.000

100.0

0.0

nd09

20.000

100.0

0.0

nd9_1

20.000

100.0

0.0

nd10

20.000

100.0

0.0

nd11

20.000

100.0

0.0

nd12

20.000

100.0

0.0

Total Number of Buses: 33

0.216

0.162

0.322

0.137

0.539

0.300

MW

0.000

Generic

Mvar

0.000

MW

0.000

Mvar

0.000

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Generation Bus
ID
MANAVI

kV
20.000

Voltage
Type

Swing

Sub-sys
1

Generation

% Mag.

Angle

100.0

0.0

MW

0.000

Mvar

0.000

Mvar Limits
% PF

Max

Min

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Line/Cable Input Data


Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)
Length

Line/Cable
ID

Library

Size

Adj. (m)

% Tol.

#/Phase

T (C)

c01

33MCUN1

185

937.0

0.0

75

0.280410

0.253000

c02

33MCUN1

185

145.0

0.0

75

0.280410

0.253000

0.0000660

c03

33MCUN1

185

160.0

0.0

75

0.280410

0.253000

0.0000660

c04

33MCUN1

185

196.0

0.0

75

0.280410

0.253000

0.0000660

c05

33MCUN1

185

20.0

0.0

75

0.280410

0.253000

0.0000660

c06

33MCUN1

185

75.0

0.0

75

0.280410

0.253000

0.0000660

c07

33MCUN1

185

75.0

0.0

75

0.280410

0.253000

0.0000660

c08

33MCUN1

185

150.0

0.0

75

0.280410

0.253000

0.0000660

c09

33MCUN1

185

50.0

0.0

75

0.280410

0.253000

0.0000660

c10

33MCUN1

185

50.0

0.0

75

0.280410

0.253000

0.0000660

c11

33MCUN3

185

50.0

0.0

75

0.280410

0.253000

0.0000682

c12

33MCUN3

185

50.0

0.0

75

0.280410

0.253000

0.0000682

Cable1

0.6NCUN1

240

50.0

0.0

75

0.092000

0.091100

Cable2

0.6NCUN1

300

50.0

0.0

75

0.074200

0.090600

i1

33MCUN3

185

20.0

0.0

75

0.122083

0.200000

0.0000682

i2

33MCUN1

185

60.0

0.0

75

0.122083

0.200000

0.0000660

i3

33MCUN3

185

50.0

0.0

75

0.122083

0.200000

0.0000682

i4

33MCUN1

185

180.0

0.0

75

0.122083

0.200000

0.0000660

Line / Cable resistances are listed at the specified temperatures.

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

2-Winding Transformer Input Data

Transformer
ID

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

% Tap Setting
Prim.

Sec.

Adjusted
%Z

Phase Shift

+ 5%

- 5%

% Tol.

30 jazire

0.630

0.400

20.000

4.00

3.96

5.0

4.2000

Std Pos. Seq.

Type

Angle
0.0

anbar frozan

0.315

0.400

20.000

4.00

3.09

5.0

4.2000

Std Pos. Seq.

0.0

cheragh sazi

0.630

0.400

20.000

4.00

3.96

5.0

4.2000

Std Pos. Seq.

0.0

froozan

0.800

0.400

20.000

5.00

5.79

5.0

5.2500

Std Pos. Seq.

0.0

gama khodroo

0.200

0.400

20.000

4.00

3.09

5.0

4.2000

Std Pos. Seq.

0.0

hospian Bus

0.100

0.400

20.000

4.00

2.47

5.0

4.2000

Std Pos. Seq.

0.0

iran jakart

1.000

0.400

20.000

5.00

5.79

5.0

5.2500

Std Pos. Seq.

0.0

janbaz

0.200

0.400

20.000

4.00

3.09

5.0

4.2000

Std Pos. Seq.

0.0

kamran

0.200

0.400

20.000

4.00

3.09

5.0

4.2000

Std Pos. Seq.

0.0

LAFAF 1

1.600

20.000

0.400

6.25

7.10

5.0

6.5625

Std Pos. Seq.

0.0

LAFAF 2

1.600

20.000

0.400

6.25

7.10

5.0

6.5625

Std Pos. Seq.

0.0

nobogh

0.800

20.000

0.400

5.00

5.79

5.0

5.2500

Std Pos. Seq.

0.0

ravan zip

0.400

0.400

20.000

4.00

3.09

5.0

4.2000

Std Pos. Seq.

0.0

2-Winding Transformer Load Tap Changer (LTC) Settings


Transformer Load Tap Changer Setting
Transformer
ID

Connected Buses ("*" LTC Side)


Primary Bus ID

Secondary Bus ID

% Min.
Tap

% Max.
Tap

% Step

Regulated Bus ID

%V

kV

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Branch Connections
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVA Base


To Bus

30 jazire

2W XFMR

3.30 jazire bus

nd03_1

163.23

646.38

666.67

anbar frozan

2W XFMR

11.anbar frozan bus

nd10

410.54

1268.56

1333.33

cheragh sazi

2W XFMR

6.cheragh sazi bus

nd05

163.23

646.38

666.67

froozan

2W XFMR

13.froozan bus

nd12

111.69

646.68

656.25

gama khodroo

2W XFMR

12.gama khodroo bus

nd11

646.59

1997.98

2100.00

hospian Bus

2W XFMR

1.hospian bus

nd01

1576.13

3893.05

4200.00

iran jakart

2W XFMR

2.ran jakart bus

nd02

89.35

517.34

525.00

janbaz

2W XFMR

9.janbaz bus

nd08

646.59

1997.98

2100.00

kamran

2W XFMR

8.kamran bus

nd07

646.59

1997.98

2100.00

LAFAF 1

2W XFMR

LAFAF MAIN BUS

4.LAFAF ZARIN bus1

57.22

406.15

410.16

LAFAF 2

2W XFMR

LAFAF MAIN BUS

Bus7

57.22

406.15

410.16

nobogh

2W XFMR

nd9_1

10.nobogh bus

111.69

646.68

656.25

ravan zip

2W XFMR

7.ravan zip bus

nd06_1

323.30

998.99

1050.00

c01

Cable

nd01

MANAVI

6.57

5.93

8.85

c02

Cable

nd01

nd02

1.02

0.92

1.37

0.0038280

c03

Cable

nd02

nd03

1.12

1.01

1.51

0.0042240

c04

Cable

nd03

nd04

1.37

1.24

1.85

0.0051744

c05

Cable

nd04

nd05

0.14

0.13

0.19

0.0005280

c06

Cable

nd05

nd06

0.53

0.47

0.71

0.0019800

c07

Cable

nd06

nd07

0.53

0.47

0.71

0.0019800

c08

Cable

nd07

nd08

1.05

0.95

1.42

0.0039600

c09

Cable

nd08

nd09

0.35

0.32

0.47

0.0013200

c10

Cable

nd09

nd10

0.35

0.32

0.47

0.0013200

c11

Cable

nd11

nd10

0.35

0.32

0.47

0.0013640

c12

Cable

nd12

nd11

0.35

0.32

0.47

0.0013640

Cable1

Cable

4.LAFAF ZARIN bus1

Bus5

143.75

142.34

202.30

Cable2

Cable

5.LAFAF ZARIN bus2

Bus10

115.94

141.56

182.98

i1

Cable

nd03_1

nd03

0.06

0.10

0.12

0.0005456

i2

Cable

LAFAF MAIN BUS

nd04

0.18

0.30

0.35

0.0015840

i3

Cable

nd06_1

nd06

0.15

0.25

0.29

0.0013640

i4

Cable

nd09

nd9_1

0.55

0.90

1.05

0.0047520

CB8

Tie Breakr

Bus7

5.LAFAF ZARIN bus2

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

LOAD FLOW REPORT

Bus
ID

Voltage
kV

% Mag.

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

MW

XFMR
Mvar

Amp

% PF

1.hospian bus

0.400

96.951

-0.9

0.056

0.042

nd01

-0.056

-0.042

105.0

80.0

2.ran jakart bus

0.400

96.711

-1.5

0.561

0.421

nd02

-0.561

-0.421

1046.9

80.0

3.30 jazire bus

0.400

97.056

-1.1

0.356

0.267

nd03_1

-0.356

-0.267

662.6

80.0

4.LAFAF ZARIN bus1

0.400

98.298

-0.8

0.130

0.049

Bus5

0.217

0.163

399.4

80.0

-0.347

-0.212

597.8

85.3

Bus10

0.324

0.139

518.5

91.9

Bus7

-0.516

-0.235

834.7

91.0

LAFAF MAIN BUS


5.LAFAF ZARIN bus2

0.400

98.091

-1.2

0.192

0.096

6.cheragh sazi bus

0.400

96.988

-1.1

0.356

0.267

nd05

-0.356

-0.267

662.2

80.0

7.ravan zip bus

0.400

96.861

-1.1

0.225

0.169

nd06_1

-0.225

-0.169

419.4

80.0

8.kamran bus

0.400

96.849

-1.1

0.113

0.084

nd07

-0.113

-0.084

209.7

80.0

9.janbaz bus

0.400

96.826

-1.1

0.113

0.084

nd08

-0.113

-0.084

209.6

80.0

10.nobogh bus

0.400

96.522

-1.5

0.447

0.335

nd9_1

-0.447

-0.335

835.9

80.0

11.anbar frozan bus

0.400

96.828

-1.1

0.176

0.132

nd10

-0.176

-0.132

328.4

80.0

12.gama khodroo bus

0.400

96.811

-1.1

0.112

0.084

nd11

-0.112

-0.084

209.6

80.0

13.froozan bus

0.400

96.517

-1.5

0.447

0.335

nd12

-0.447

-0.335

835.9

80.0

Bus5

0.400

97.744

-0.8

0.216

0.162

4.LAFAF ZARIN bus1

-0.216

-0.162

399.4

80.0

Bus7

0.400

98.091

-1.2

LAFAF MAIN BUS

-0.516

-0.235

834.7

91.0

5.LAFAF ZARIN bus2

0.516

0.235

834.7

91.0

5.LAFAF ZARIN bus2

-0.322

-0.137

518.5

92.0

nd04

-0.866

-0.468

28.6

88.0

4.LAFAF ZARIN bus1

0.348

0.219

12.0

84.6

Bus7

0.518

0.249

16.7

90.1

Bus10
LAFAF MAIN BUS

* MANAVI
nd01

nd02

nd03

nd03_1

0.400

97.508

-1.4

0.322

0.137

20.000

99.387

0.0

20.000

100.000

0.0

3.880

2.803

nd01

20.000

99.579

0.0

MANAVI

20.000

20.000

20.000

99.515

99.455

99.454

0.0

0.0

0.0

3.880

2.803

138.2

81.1

-3.865

-2.790

138.2

81.1

nd02

3.808

2.745

136.1

81.1

1.hospian bus

0.057

0.044

2.1

79.0

nd01

-3.806

-2.747

136.2

81.1

nd03

3.240

2.299

115.2

81.6

2.ran jakart bus

0.566

0.448

20.9

78.4

nd02

-3.238

-2.301

115.3

81.5

nd04

2.878

2.021

102.1

81.8

nd03_1

0.360

0.280

13.2

78.9

-0.360

-0.281

13.3

78.8

0.360

0.281

13.3

78.8

nd03

-2.876

-2.025

102.2

81.8

nd05

2.010

1.558

73.9

79.0

nd03
3.30 jazire bus

nd04

20.000

99.390

0.0

% Tap

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Bus
ID

Voltage
kV

% Mag.

20.000

99.385

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID
LAFAF MAIN BUS

nd05

0.0

nd06_1

20.000

20.000

99.370

99.369

0.0

0.0

20.000

99.357

0.0

nd09

20.000

20.000

99.334

99.327

0.0

0.0

nd9_1

20.000

99.321

0.0

nd10

20.000

99.322

0.0

0.467

28.6

88.0

-1.558

73.9

79.0

nd06

1.651

1.278

60.6

79.1

nd05

nd12

20.000

20.000

99.319

99.316

0.0

0.0

# Indicates a bus with a load mismatch of more than 0.1 MVA

0.281

13.2

78.8

-1.279

60.7

79.0

1.422

1.103

52.3

79.0

nd06_1

0.228

0.176

8.4

79.2

-0.228

-0.177

8.4

78.9

0.228

0.177

8.4

78.9

nd06

-1.422

-1.105

52.3

79.0

nd08

1.308

1.017

48.1

79.0

nd06

nd07

0.114

0.089

4.2

78.9

-1.308

-1.020

48.2

78.9

nd09

1.194

0.932

44.0

78.8

9.janbaz bus

0.114

0.089

4.2

78.9

nd08

-1.194

-0.933

44.0

78.8

nd10

0.743

0.580

27.4

78.8

nd9_1

0.451

0.352

16.6

78.8

nd09

-0.451

-0.357

16.7

78.4

0.451

0.357

16.7

78.4

nd09

-0.743

-0.582

27.4

78.7

nd11

0.565

0.443

20.9

78.7

11.anbar frozan bus

0.178

0.139

6.6

78.9

nd10

-0.565

-0.444

20.9

78.6

nd12

0.451

0.356

16.7

78.5

12.gama khodroo bus

0.114

0.089

4.2

78.9

-0.451

-0.357

16.7

78.4

0.451

0.357

16.7

78.4

nd11
13.froozan bus

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

0.359
-1.650

nd07

10.nobogh bus

nd11

% PF

0.866

8.kamran bus
nd08

Amp

-2.010

7.ravan zip bus


nd07

XFMR
Mvar

nd04

6.cheragh sazi bus


nd06

MW

% Tap

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

10

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Bus Loading Summary Report

Directly Connected Load


Constant kVA

Bus
ID

kV

Rated Amp

MW

Constant Z

Mvar

MW

Total Bus Load

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

MVA

% PF

Amp

1.hospian bus

0.400

0.056

0.042

0.070

80.0

105.0

2.ran jakart bus

0.400

0.561

0.421

0.701

80.0

1046.9

3.30 jazire bus

0.400

0.356

0.267

0.446

80.0

662.6

4.LAFAF ZARIN bus1

0.400

0.130

0.049

0.434

80.0

637.7

5.LAFAF ZARIN bus2

0.400

0.192

0.096

0.589

87.6

866.5

6.cheragh sazi bus

0.400

0.356

0.267

0.445

80.0

662.2

7.ravan zip bus

0.400

0.225

0.169

0.281

80.0

419.4

8.kamran bus

0.400

0.113

0.084

0.141

80.0

209.7

9.janbaz bus

0.400

0.113

0.084

0.141

80.0

209.6

10.nobogh bus

0.400

0.447

0.335

0.559

80.0

835.9

11.anbar frozan bus

0.400

0.176

0.132

0.220

80.0

328.4

12.gama khodroo bus

0.400

0.112

0.084

0.141

80.0

209.6

13.froozan bus

0.400

0.447

0.335

0.559

80.0

835.9

Bus5

0.400

0.216

0.162

0.270

80.0

399.4

Bus7

0.400

0.567

91.0

834.7
518.5

Bus10

0.400

0.322

0.137

0.350

92.0

LAFAF MAIN BUS

20.000

0.985

88.0

28.6

MANAVI

20.000

4.787

81.1

138.2

nd01

20.000

4.767

81.1

138.2

nd02

20.000

4.694

81.1

136.2

nd03

20.000

3.973

81.5

115.3

nd03_1

20.000

0.457

78.8

13.3

nd04

20.000

3.518

81.8

102.2

nd05

20.000

2.543

79.0

73.9

nd06

20.000

2.088

79.0

60.7

nd06_1

20.000

0.289

78.9

8.4

nd07

20.000

1.801

79.0

52.3

nd08

20.000

1.659

78.9

48.2

nd09

20.000

1.515

78.8

44.0

nd9_1

20.000

0.575

78.4

16.7

nd10

20.000

0.944

78.7

27.4

nd11

20.000

0.719

78.6

20.9

nd12

20.000

0.575

78.4

16.7

Percent
Loading

Project:

Lafaf Zarin

ETAP
6.0.0

Page:

11

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

12

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Branch Loading Summary Report

Transformer
CKT / Branch
ID

Cable & Reactor


Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)

MVA

30 jazire

Transformer

0.630

0.457

72.5

0.446

70.7

anbar frozan

Transformer

0.315

0.226

71.7

0.220

69.9

cheragh sazi

Transformer

0.630

0.456

72.4

0.445

70.6

froozan

Transformer

0.800

0.575

71.9

0.559

69.9

gama khodroo

Transformer

0.200

0.144

72.1

0.141

70.3

hospian Bus

Transformer

0.100

0.072

72.4

0.070

70.5

iran jakart

Transformer

1.000

0.722

72.2

0.701

70.1

janbaz

Transformer

0.200

0.144

72.1

0.141

70.3

kamran

Transformer

0.200

0.144

72.2

0.141

70.3

LAFAF 1

Transformer

1.600

0.412

25.7

0.407

25.4

LAFAF 2

Transformer

1.600

0.575

35.9

0.567

35.5

nobogh

Transformer

0.800

0.575

71.9

0.559

69.9

ravan zip

Transformer

0.400

0.289

72.2

0.281

70.4

* Indicates a branch with operating load exceeding the branch capability.

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

13

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Branch Losses Summary Report

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
kvar

From

To

Vd
% Drop
in Vmag

hospian Bus

-0.056

-0.042

0.057

0.044

0.8

2.1

97.0

99.6

2.63

iran jakart

-0.561

-0.421

0.566

0.448

4.7

27.2

96.7

99.5

2.80

30 jazire

-0.356

-0.267

0.360

0.281

3.4

13.6

97.1

99.5

2.40

Cable1

0.217

0.163

-0.216

-0.162

1.1

1.1

98.3

97.7

0.55

-0.347

-0.212

0.348

0.219

1.0

7.0

98.3

99.4

1.09

0.324

0.139

-0.322

-0.137

1.5

1.8

98.1

97.5

0.58

cheragh sazi

-0.356

-0.267

0.359

0.281

3.4

13.6

97.0

99.4

2.40

ravan zip

-0.225

-0.169

0.228

0.177

2.7

8.4

96.9

99.4

2.51

kamran

-0.113

-0.084

0.114

0.089

1.4

4.2

96.8

99.4

2.51

janbaz

-0.113

-0.084

0.114

0.089

1.4

4.2

96.8

99.3

2.51

nobogh

-0.447

-0.335

0.451

0.357

3.7

21.7

96.5

99.3

2.80

anbar frozan

-0.176

-0.132

0.178

0.139

2.1

6.6

96.8

99.3

2.49

gama khodroo

-0.112

-0.084

0.114

0.089

1.4

4.2

96.8

99.3

2.51

froozan

-0.447

-0.335

0.451

0.357

3.7

21.7

96.5

99.3

2.80

LAFAF 2

-0.516

-0.235

0.518

0.249

1.9

13.6

98.1

99.4

1.30

i2

LAFAF 1
Cable2

-0.866

-0.468

0.866

0.467

0.0

-1.5

99.4

99.4

0.00

c01

3.880

2.803

-3.865

-2.790

15.1

13.6

100.0

99.6

0.42

c02

3.808

2.745

-3.806

-2.747

2.3

-1.8

99.6

99.5

0.06

c03

3.240

2.299

-3.238

-2.301

1.8

-2.6

99.5

99.5

0.06

c04

2.878

2.021

-2.876

-2.025

1.7

-3.6

99.5

99.4

0.06

i1

0.360

0.280

-0.360

-0.281

0.0

-0.5

99.5

99.5

0.00

c05

2.010

1.558

-2.010

-1.558

0.1

-0.4

99.4

99.4

0.00

c06

1.651

1.278

-1.650

-1.279

0.2

-1.7

99.4

99.4

0.01

c07

1.422

1.103

-1.422

-1.105

0.2

-1.8

99.4

99.4

0.01

i3

0.228

0.176

-0.228

-0.177

0.0

-1.3

99.4

99.4

0.00

c08

1.308

1.017

-1.308

-1.020

0.3

-3.6

99.4

99.3

0.02

c09

1.194

0.932

-1.194

-0.933

0.1

-1.2

99.3

99.3

0.01

c10

0.743

0.580

-0.743

-0.582

0.0

-1.3

99.3

99.3

0.00

i4

0.451

0.352

-0.451

-0.357

0.0

-4.7

99.3

99.3

0.01

c11

0.565

0.443

-0.565

-0.444

0.0

-1.3

99.3

99.3

0.00

c12

0.451

0.356

-0.451

-0.357

0.0

-1.3

99.3

99.3

0.00

56.1

135.8

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

14

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

Alert Summary Report


% Alert Settings
Critical
Loading
Bus

0.0

Cable

0.0

Reactor

0.0

Line
Transformer
Panel

100.0
0.0
100.0

Protective Device

0.0

Generator

0.0

Bus Voltage
OverVoltage

105.0

UnderVoltage

95.0

Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)

0.0
100.0

Project:

ETAP

Lafaf Zarin

6.0.0

Page:

15

Date:

30-07-2011

Location:

Tehran

Contract:

01

SN:

12345678

Engineer:

Ahmad Safaripour

Revision:

MaxLoad

Filename:

LAFAFZARIN

Config.:

Normal

Study Case: LF

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Source (Swing Buses):

3.880

2.803

4.787

Source (Non-Swing Buses):

0.000

0.000

0.000

Total Demand:

3.880

2.803

4.787

81.06 Lagging

Total Motor Load:

0.539

0.300

0.616

87.39 Lagging

Total Static Load:

3.286

2.368

4.050

81.13 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.056

0.136

System Mismatch:

0.000

0.000

Number of Iterations: 2

81.06 Lagging

You might also like