Assignment #2

Assignment is due on October 12 in the class


Question # 1: A manufacturing facility produces 10 components. Components 1,2,6,8 and 9 are
of equivalent size and weight. Components 3, 7 and 10 are five times bigger and heavier than
components 1,2,6,8 and 9, whereas components 4 and 5 are just half size of components 1,2,6,8
and 9. Facility includes departments A, B, C, D, E and F and the overall flow path is A-B-C-DE-F. The quantities to be produced and the routing for each component are given below. Develop
a From-To Chart for this facility while taking the factor of ease of handling into consideration.
Component Production
quantity
1
15
2
35
3
2
4
42
5
50
6
17
7
4
8
27
9
25
10
5

Routing
A-B-C-D-E-F
B-D-E-C-F
A-C-D-B-C-E
A-C-D-E-F
B-C-A-D-F
A-C-D-B-C-E
C-B-A-D-E-F
B-D-E
A-B-C-E-F
D-B-C-E-F

Question #2: Two layouts below have been recommended for a new facility. Evaluate them
based on adjacency-based scorings and decide which one corresponds better to the requirements
of the facility, given the Relationship Chart below.
a) Use these weights: A=64, E=16, I=4, O=1, U=0 and X=-1024
b) Use these weights: A=8, E=4, I=2, O=1, U=0 and X=8
Layout 1:
10

13

11

2 12

14

Layout 2:
10

13

12

11

14

Relationship Chart

D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14

D2

D3
A

D4 D5

D6 D7
I

I
I
I
I

D8 D9

O
A
I

D10 D11 D12 D13 D14

O
I

U
O

E
E
U
I

E
I
U
I

U
O

A
U

O
O

Question #3: Question 6-10 from the book. Use Method I when constructing the relationship
diagram. Indicate the sequence in which the departments are placed into the diagram.

Question #4: Question 6-13 from the book

Question #5: Question 6-21 from the book