Bill of Materials

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

SN ITEM PRICE

1 Cotton soil taking out – 2 weeks


2 Himming 1 water 35,000.00
MATERIALS REQUIRED
3 Hard stones – 9 x 9 = 5 lorries 41,000.00
4 Ballast 44 tons = 2 lorries 44,000.00
5 Sand 44 tons = 2 lorries 60,000.00
6 Cement 200 bags 126,000.00
7 Twister bars Y 10 = 36 12,600.00
8 Twister bars Y 8 = 30 8,700.00
9 Twister bars R 8 = 30 7,500.00
10 Twister bars R 6 = 30 5,400.00
11 Binding wire on roll 30 kg 2,400.00
12 Hard core = 10 lorries 40,000.00
13 6 lorries 6 x 9 for main walls 96,000.00
14 Iron sheets 3 meters 47 per 25,850.00
15 Iron sheets 2 meters 32 per 14,040.00
16 Roofing nails = 18 keg 5 2,160.00
17 Ordinary nails = 18 – 5 1,440.00
18 Ordinary nails = 18 – 4 1,440.00
19 Ordinary nails = 18 – 3 1,440.00
20 Ordinary nails = 10 – 2 800.00
21 Hard –boards 30 pieces 21,000.00
22 Soft – boards 30 pieces 21,000.00
23 Mukuwa one roll 25 kg 7,000.00
24 Lintel or Ring beam 8,000.00
25 Damp proof course one roll 5,000.00
26 Painters at 30,000.00
27 Doors 16 – 4 each hours 36,000.00
28 Windows 16 – 4 each hours 16,000.00
29 Timber 4 x 2 – 1600 feet 40,000.00
30 Timber 3 x 2 – 190 feet 4,320.00
31 Timber 6 x 1 – 200 feet 18 3,600.00
32 Ridge Board = 8 x 1 – 156 feet 3,900.00
33 Pipes & Water Tanks 40,000.00
34 Foundation to slab 80,000.00
35 Walls Building Up to Beam 70,000.00
36 Roofing and Plastering 70,000.00
37 Power 30,000.00
38 Plumbing

TOTAL 1,011,590.00

You might also like