The S8 project will run from April 5, 2007 to May 2007. An interim review will be held in late April and final reports are due by the end of May. Internal batches must attend a minimum of 3 days per week, or 2 days with approval, while external batches must submit a complete attendance certificate. Students must provide weekly status reports and attendance records to their assigned guides, and individual contributions will be evaluated along with guide visits for external projects.
The S8 project will run from April 5, 2007 to May 2007. An interim review will be held in late April and final reports are due by the end of May. Internal batches must attend a minimum of 3 days per week, or 2 days with approval, while external batches must submit a complete attendance certificate. Students must provide weekly status reports and attendance records to their assigned guides, and individual contributions will be evaluated along with guide visits for external projects.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The S8 project will run from April 5, 2007 to May 2007. An interim review will be held in late April and final reports are due by the end of May. Internal batches must attend a minimum of 3 days per week, or 2 days with approval, while external batches must submit a complete attendance certificate. Students must provide weekly status reports and attendance records to their assigned guides, and individual contributions will be evaluated along with guide visits for external projects.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
1. S8 project Duration starts from 5th of April, 2007.
2. Interim Project Review will be in the last week of April and final evaluation , review and submission of reports towards the end of May. (Exact Dates to be announced later ) 3. Internal project batches should have a minimum attendance of 3 days per week.(Any further relaxation on the no of days will be strictly subject to the approval of the Guide, but will not be less than 2 Days/ week). External batches should produce the complete Attendance Certificate from their project firm on completion of the project. 4. Attendance should be given to their respective guides. 5. Weekly Status should be reported to their respective guides by all the batches (Both Internal & External). External batches may collect the email Ids and phone numbers of their respective guides before moving out for project. Project Marks are awarded on the basis of these evaluations also. 6. Individual Contribution of the students will be tested. 7. External projects will be visited by the respective guides either during the project duration or after completion at their project sites and the visits should be arranged by the respective batches.