Tour Diary

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

TOUR DAIRY OF JTO.

GSM/TRANS-RAHPAR OF MONTH AUGUST-2011 VAGHELA ALPESHKUMAR P ERP NO 07029200


Departure Station Station Hour Date Date Arrival Hour No. of Kilo Meter

Hrs.
6

perticulars of f 8

RPR Samakhyali RPR Manfara RPR Bhachau RPR Balasar RPR Dholavira RPR Bella RPR Dholavira RPR Jatavda RPR Jatavda RPR Bhuj RPR Balasar RPR Dholavira RPR Ramvav

3-Aug 8-Aug 9-Aug 17-Aug 18-Aug 19-Aug 20-Aug 23-Aug 24-Aug 25-Aug 26-Aug 29-Aug 30-Aug

09.00 18.00 09.00 17.00 09.00 22.30 10.00 17.15 10.30 16.30 09.30 17.00 09.00 17.30 09.00 15.00 09.50 18.00 11.00 23.00 10.30 19.30 10.00 17.00 09.30 18.45

Samakhyali RPR Manfara RPR Bhachau RPR Balasar RPR Dholavira RPR Bela RPR Dholavira RPR Jatavda RPR Jatavda RPR Bhuj RPR Balasar RPR Dholavira RPR Ramvav RPR

3-Aug 8-Aug 9-Aug 17-Aug 18-Aug 19-Aug 20-Aug 23-Aug 24-Aug 26-Aug 26-Aug 29-Aug 30-Aug

10.00 19.00 11.00 21.45 10.30 24.00 10.45 19.00 12.30 18.00 11.00 18.00 11.00 19.00 10.30 16.00 11.00 19.00 14.00 02.00 11.30 20.30 12.00 19.00 10.15 19.30

10.00 12.45 15.00 09.00 07.30 08.30 12.30 07.00 09.10 16.00 10.00 09.00 10.00

54 54 122 123 91 92 63 63 67 68 63 64 109 108 50 50 52 53 167 167 55 54 81 81 20 20

Samakhyali Jungi OFC brk at 1.31 Attended Manfara OFC ring Brk at Restored.

Bhavanipur BT JCB Utilised for Balasar OFC fault

Dholavira OFC fault at 16.640km fr Jatavda Site OFF due to Power su brk at 11.840km from Balasar resto Jatavda OFC brk in Exchg restored at 17.122km from Ratanpar Restor

Jatavda cable fault at USO site Pre

Jatavada Cable brk again at USO s

To attend OFC Transmission wing

Balasar Rapar OFC fault at 7.80km

Dholavira OFC fault at 28.473km fr

Rapar Manfara OFC ring brk at 12.

PAR OF MONTH AUGUST-2011 P ERP NO 07029200


Means of Conveyance

perticulars of fault attended 8 Samakhyali Jungi OFC brk at 1.31km from Samakhyali Exchg Attended Manfara OFC ring Brk at 4.120km from Manfara Exchg & Restored. Bhavanipur BTS Site Work JCB Utilised for Balasar OFC fault & restored

Hire.veh Hire.veh Hire.veh Hire.veh

Hire.veh Dholavira OFC fault at 16.640km from Balasar restored Jatavda Site OFF due to Power suppy Problems & Balla brk OFC Hire.veh brk at 11.840km from Balasar restored Jatavda OFC brk in Exchg restored & Ratanpar Dholavira OFC fault Hire.veh at 17.122km from Ratanpar Restored Jatavda cable fault at USO site Premises retored Jatavada Cable brk again at USO site premises restored To attend OFC Transmission wing At GMTD Bhuj Balasar Rapar OFC fault at 7.80km from Balasar restored Dholavira OFC fault at 28.473km from Balasar restored Rapar Manfara OFC ring brk at 12.319km from Rapar Restored Hire.veh Hire.veh Hire.veh Hire.veh Hire.veh Hire.veh