The document provides information about lab equipment downtime hours calculation. It details that there were 28 total pieces of lab equipment including 2 servers, 20 clients, 2 printers, 2 switches, 2 UPS, and 0 stabilizers. The total available hours were 5040 and the total reported downtime hours were 15.75. It then provides an example calculation for how the total downtime hours were determined based on individual equipment downtimes from specific dates.
The document provides information about lab equipment downtime hours calculation. It details that there were 28 total pieces of lab equipment including 2 servers, 20 clients, 2 printers, 2 switches, 2 UPS, and 0 stabilizers. The total available hours were 5040 and the total reported downtime hours were 15.75. It then provides an example calculation for how the total downtime hours were determined based on individual equipment downtimes from specific dates.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
The document provides information about lab equipment downtime hours calculation. It details that there were 28 total pieces of lab equipment including 2 servers, 20 clients, 2 printers, 2 switches, 2 UPS, and 0 stabilizers. The total available hours were 5040 and the total reported downtime hours were 15.75. It then provides an example calculation for how the total downtime hours were determined based on individual equipment downtimes from specific dates.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Total Downtime hours 15.75 ←←← Average up time 99.69 Help for Total Downtime hours Calculation
1 For Example Complaint Date and time is 25/05/07 12:00
2 Then note down the service level and Resolution Level where the problem does lie 3 For example your problem lies in Service Level no 3 ie SL3 4 Now wait up to three working day 5 Last waiting Date and time was 27/05/07 12:00 6 HCL Engr comes on 30/05/07 9:00 am 7 from 27/05/07 on wards the downtime hours will be start
8 DATE DOWN TIME HOURS
27/05/07 2.25 28/05/07 6.25 29/05/07 6.25 30/05/07 1 Down Time Hours 15.75
9 Now multiply it with that equipment which is effected
10 For eg. 2 Computers were Effected 11 Multiply downtime hours with 2 and then its factor ie 1 12 answer will be 31.5 13 31.5 will be the TOTAL DOWN TIME HOURS up Time