This schedule outlines the key activities and timeline for expanding the facilities of Mandarin Bible Church from January to March. It includes designing drawings, obtaining contractor quotes, appointing a contractor, a 30 day construction period, utility connections, direct purchases, and moving in. The activities are broken down into 10 main items with sub-items assigned time periods and responsibilities.
This schedule outlines the key activities and timeline for expanding the facilities of Mandarin Bible Church from January to March. It includes designing drawings, obtaining contractor quotes, appointing a contractor, a 30 day construction period, utility connections, direct purchases, and moving in. The activities are broken down into 10 main items with sub-items assigned time periods and responsibilities.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This schedule outlines the key activities and timeline for expanding the facilities of Mandarin Bible Church from January to March. It includes designing drawings, obtaining contractor quotes, appointing a contractor, a 30 day construction period, utility connections, direct purchases, and moving in. The activities are broken down into 10 main items with sub-items assigned time periods and responsibilities.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
2.0 Obtain user perferences 7 days 3.0 Produce design drawings 3.1 Fitting out works 3 days 3.2 Ventilation and air conditioning 3 days 3.3 Fire services 3 days 3.4 Plumbing and drainage 3 days 3.5 Electrical power and lighting 3 days 3.6 Audio visual 3 days 3.7 Telephone and internet 3 days 4.0 Calling quotations 4.1 Obtain offers 7 days 4.2 Assess quotations 2 days 5.0 Appoint Contractor 5.1 Mobilisation 3 days 6.0 Execution of Works 6.1 Construction period 30 days 7.0 Take over Inspection of works 2 days 8.0 Apply utilities 8.1 Power supply from HKE 7 days 8.2 Phone lines from telephone company 7 days 8.3 Internet services form services provider 7 days 9.0 Direct purchase Furniture and applicances 7 days Phone system 10 days 10.0 Moving in March 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31