Electrical Inspection Report 1) Shri Dilip Kumar 2) Shri B.K.Jha 3).Shri K.V.L.N.

Sastry 4) Shri Rahul Singh

Date:28-2-11

S.No. 1. 2. 3. 4. 5. 6. 7. 8. 9 10 11 12 13. CC:

Equipment F6/Finishing F7/Finishing F8/Finishing F9/Finishing F10/Finishing F11/Finishing F12/Finishing Roughing/12A (-8m) Roughing/VC18OD8 (-8m) Roughing/VC20OD10 (-8m) Roughing (-8m) Roughing/BO-139 (-8m) OD12D & OD12C 1) ED (W) 2) GM (M&U) 3) DGM (T) 4) HOD (HSM)

Observation NDE: None of the rings are rotating. DE: Could not be checked as no coupling guard is there NDE: Only one ring is there. Not rotating. Other ring is missing. DE: Could not be checked as no coupling guard is there. NDE: Only one ring is rotating. DE: None of the rings are rotating. NDE: Only one ring is rotating. DE: Only one ring is rotating. NDE: Only one ring is rotating. DE: Only one ring is rotating. NDE: None of the rings are rotating. DE: Only one ring is rotating. NDE: Only one ring is rotating. DE: Both are rotating. Crack observed on the duct at the top and Oil is leaking through the duct. Chamber is filled with full of water/Oil. Droplets of oil are falling on the motor. Cable is completely drenched in water. Heavy Oil Accumulation of oil observed in the Chamber. Wet Patches observed at R4 cable Chamber. Area filled with water. Oil Accumulation of oil observed.

Remark

You might also like