Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

CHECK SLIP TO ACCOMPANY THE ESTIMATE FOR CIVIL WORKS FOR TECHNICAL

SANCTION

1. Name of work : Improment works to 'A' Type Quarters From Quarter No:1
To 36 (i.e for 18 Blocks) and 'DEE'type Quarters 10Nos in
T.G.P Camp colony @ K.R.Dam.
2. Cost of work : Rs.,9,95,400/-
3. Provision in project estimate :

4. Whether the following enclosures are


sent:
a) Report in the form prescribed in : Yes
Govt. Memo No.1514/SE/ 79 dt.
21.4.1979
b) Abstract estimate as prescribed in : Yes
CE General Circular No.R1/70-
71/79 dt.1.11.1979
c) General Index Plan site plan and : Yes
typical drawing showing the
general features of works
5. Designation of higher officer who has : Superintending Engineer,
inspected and date of inspection SSLC &SB Circle, Nellore, Nellore. 21.04.07
a) Suitability of foundation : Good
b) Suitability of site : Good
c) Soils and materials qualification :
d) Soils classification of trail pits :

e) Abnormal dewatering : No
f) Land Acquisition : No
g) Forest clearance :
h) Availability of funds :
i) Any other vital charactorisation :
6. Whether the LS provision according :
with CE General Circular No.F4/70-71/
79-5 dt.10.11.1978.
7. Whether provision of LA and LI :
charges shown separately by lumpsum
as per G.O.Ms.No.1627 dt.29.11.1969.
8. Whether provision of PS and :
contingencies in accordance with
G.O.Ms.No.385 dt.25.10.1979.
9. Whether the rates of earthwork by :
machinery and gats hoist etc., are
bared on sub-estimate prepared
machinery organization.
a) Proposed date of commencement : 10/07
of work
b) Proposed date of complete of : 11/07
work

You might also like