The document provides guidelines for students to follow when writing a project synopsis for their final year project, requiring the synopsis to cover the title, objectives, category, hardware/software requirements, definition, scope, analysis, module structure with descriptions and data structures, implementation methodology, security mechanisms, future scope, bibliography, and is due by November 5th, 2011.
The document provides guidelines for students to follow when writing a project synopsis for their final year project, requiring the synopsis to cover the title, objectives, category, hardware/software requirements, definition, scope, analysis, module structure with descriptions and data structures, implementation methodology, security mechanisms, future scope, bibliography, and is due by November 5th, 2011.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The document provides guidelines for students to follow when writing a project synopsis for their final year project, requiring the synopsis to cover the title, objectives, category, hardware/software requirements, definition, scope, analysis, module structure with descriptions and data structures, implementation methodology, security mechanisms, future scope, bibliography, and is due by November 5th, 2011.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Project Synopsis should be covering the following aspects: 1. Title of the project. 2. Introduction and Objectives of the Project. 3. Project category. 4. Tools/Platform, Hardware and Software Requirements Specification. 5. Project Definition, Requirements Specification. 6. Scope of solution. 7. Analysis 8. A complete structure which includes: 1. Number of modules and their description to provide an estimation of the student`s effort on the project. 2. Data structures as per the project requirements of all the modules. 3. Implementation methodology. 4. List of reports that are likely to be generated. 9. Implementation of security mechanism at various levels. 10. Future scope and further enhancement of the Project. 11. Bibliography.
Last date of submission: 5 November,2011
Siddharth Lavania Mayank Kumar (Project Co-ordinators) FINAL YEAR