1 2 3 4 5 Areas Total Built Up Area Manufacturing Area RM/PM Storage Lab Packing Section Measurement( sq mtr) 1694.55 182.65 780 105 417 Nos 2 2 1 2 1 1 Available Available Available Available Not Available 3 6 NA 20 5 Ton 5 of 5 Ton, 1 of 10 Ton 10KL Tank for Hot Water Akash-6, Uflex-14 Capacity 400kg/hr, 300 kg/hr 160 KVA 415 KVA 32 TR 100 cfm, 30 cfm 2KL/hr 26 KL/ Day
Utility
1 2 3 4 5 6 7 1 2 3 4 5 1 2 3 1
Boilers DG Set Load Sanction AHU Air Compressor Demineralization Plant ETP Water Consent Air Consent Hazardous Waste FDA License FPO License Mixers Storage Tanks CIP Systems LUP Machines
Legal
Manufacturing
Packing Hall
Parker Line
Conclusion Space Requirement Electrical Load Steam Requirement Air Requirement Hygiene Orientation Floor Condition False Roofing
Different Options can be explored. No issue Both the boilers need to run; there will not be any This situation will arise if all 20 LUPs will run simu Very Strong System. Epoxy Coating is required atleast in packing area. Can be discussed and finalized.
Floor is not epoxy coated;false roofing is not there. Remarks Only one boiler runs at a time, second boiler is used for sanitization, water temperature make up Silvasa power situation is remarkably good, rarely requires to run the DGs. Make-Kirloskar, 10 year old Present load is 200 KVA, another 100 KVA load can be added to be on safer side. Although no temperature display in packing area, verbally confirmed to be around 26-28 degree C ELGI Make,Not seen filters in the line,may be constraint. 80% Utilization. At present they are discharging around 18-20 KL per day.
SS 316 SS 316 No CIP Systems were available, manual cleaning with hot water with sanitizer as formalin being used. Machine speed varies from 480 to 560.
It includes Mfg Area, Packing Machine, Air Cooled Tunnel, One Day RM/ PM Requirement 10 tons/day No clear cut information; Approx Idea: Minimum-25CFM Max-40 CFM
s need to run; there will not be any standby.Can be done with proper preventive maintenance. will arise if all 20 LUPs will run simultaneouslly.