Technical Parameters of Aerated معلومات تقنيه
Technical Parameters of Aerated معلومات تقنيه
Installation Power (kw) Production Cycle (mould/min) Workshop Area (m ) Plant Area (m3) Item Raw material mixing and pouring cycle Base body static curing time Static curing temperature: Strength after static curing Base body cutting cycle Vacuuming Autoclave pressure Rising pressure Working pressure Falling pressure Sand (or Fly Ash) Raw materials batching rate: Lime Cement Gypsum
2 3 3
HIM-AAC-20 200 6.01.20.6 1300 4.5 4000 30000 Description 8 minutes 1.5~3 hours 40 0.2~0.3Mpa 6 minutes
Technic Index and Autoclaved Requirements of Autoclaved Aerated Concrete Production Line
0-0.06 Mpa, 0.5hour 0-1.3 Mpa, 2hours 1.3 Mpa (temperature 1935) 7hours 1.3 -0 Mpa, 2hours 69% 20% 8% 3%
Aluminum powder 0.074% Note: The accurate raw material batching rate is adjustable according to local raw material