A progress review meeting was held on October 22, 2011 in Shopal to discuss electrical projects in Vidisha, India. During the meeting, the Chief Minister raised concerns that an S&T 173 x 83 meter pole and a P-beam 132 x 132 meter pole stacked for Vidisha did not meet technical specifications. A joint inspection on November 3, 2011 found that one flange of pole number 11, an S&T 173 x 83 pole in Cantt. Basoda, was below the required 83 mm minimum. Representatives from the utility, contractor and government attended the inspection.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
A progress review meeting was held on October 22, 2011 in Shopal to discuss electrical projects in Vidisha, India. During the meeting, the Chief Minister raised concerns that an S&T 173 x 83 meter pole and a P-beam 132 x 132 meter pole stacked for Vidisha did not meet technical specifications. A joint inspection on November 3, 2011 found that one flange of pole number 11, an S&T 173 x 83 pole in Cantt. Basoda, was below the required 83 mm minimum. Representatives from the utility, contractor and government attended the inspection.
A progress review meeting was held on October 22, 2011 in Shopal to discuss electrical projects in Vidisha, India. During the meeting, the Chief Minister raised concerns that an S&T 173 x 83 meter pole and a P-beam 132 x 132 meter pole stacked for Vidisha did not meet technical specifications. A joint inspection on November 3, 2011 found that one flange of pole number 11, an S&T 173 x 83 pole in Cantt. Basoda, was below the required 83 mm minimum. Representatives from the utility, contractor and government attended the inspection.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
A progress review meeting was held on October 22, 2011 in Shopal to discuss electrical projects in Vidisha, India. During the meeting, the Chief Minister raised concerns that an S&T 173 x 83 meter pole and a P-beam 132 x 132 meter pole stacked for Vidisha did not meet technical specifications. A joint inspection on November 3, 2011 found that one flange of pole number 11, an S&T 173 x 83 pole in Cantt. Basoda, was below the required 83 mm minimum. Representatives from the utility, contractor and government attended the inspection.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
8ef!olnL rogress revlew CMu meeLlng held on 22 CcL2011 aL 8hopal uurlng CMu meeLlng held on 22 CcL2011 aL 8hopal some polnLs have been ralsed by CM (8 Au8)ro[ecLs LhaL Lhe 8S! 173 x 8311 mLr and Pbeam 132 x 13213 mLr sLacked for vldlsha loLlll are noL upLo Lhe requlred Lechnlcal speclflcaLlons A [olnL lnspecLlon was carrled on 3 nov2011 by CM(8Au8)AML(voyanLs soluLlons vL LLd)A8L (voyanLs soluLlons vL LLd)nodal Cfflcer(8 Au8MMkvvCL)and Manager ro[ecLs(A2Z MLS LLdvldlsha)uurlng whlch lL was observed LhaL one of Lhe flances of 1 no 8S! pole 11 m173x 83 aL Can[ 8asoda ls below 83 mm