Costing Data Sheet 1
Costing Data Sheet 1
raw material
1 EN8 D (BRIGHT BAR)
dia
mm
length
mm
65
area
mm^2
volume
mm^3
92 3316.625 305129.5
70
95
mat.cost/kg
area
mm^2
volume
mm^3
volume in
m^3
Density of steel
kg/m^3
wastage of material
mass of steel(hollow piece)
7850
2.395266575
58 1931.885 177733.4
0.000177733
7850
1.395207347
1.000059228
7850
7850
3846.5 365417.5
0.000365418
7850
2.868527375
2461.76 233867.2
0.000233867
7850
1.83585752
1.032669855
43
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
65 MM DIAM
65 MM
42 MM
92MM
40 DIA COUPLER
( AFTER CONVERSION)
IF PUNCHING DONE
RATHER THAN
DRILLING
92 MM
25 DIA COUPLER
(AFTER CONVERSION)
IF PUNCHING DONE
RATHER THAN
DRILLING
26 MM
92 MM
14 DIA COUPLER
(AFTER CONVERSION)
THUS FROM SINGLE EN8D 65*92 PIECE WE CAN GET 3 COUPLERS , IF PUNCHING OPERATION CAN BE DONE RATHER THAN DRILLING, THUS WIN -WIN SITUATION
profit
per piece
0.00030513
IMPORTANT
NOTE:
Labour
kg
0
2 EN8 D (BLACK BAR)
volume in
m^3
Total
margin rs
179.93
37
37
4 164.3467