Gas Heating Cost - Block Load at 85 DD
Gas Heating Cost - Block Load at 85 DD
Walls North Wall South Wall East Wall West Wall Doors North Wall - Solid North Wall - Glass South Wall- Solid South Wall- Glass East Wall - Solid East Wall - Glass West Wall - Solid West Wall - Glass Glass North Wall South Wall East Wall West Wall Roof Cathedral Ceiling Flat Ceiling Infiltration Perimeter Length (ft) TOTAL HEAT LOSS CCF (100 Cu. Ft.) Std Low High
Area 1165.3 1422.7 807.2 885.2 42.0 0.0 42.0 0.0 0.0 42.0 0.0 42.0 20.0 40.0 1007.0 400.0 3400.0 6127.0 364.0
Temp Diff. 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78
U factor 0.04 0.04 0.04 0.04 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.56 0.56 0.56 0.56 0.03 0.03 BTU / FT 40.00 14,560 3,636 4,439 2,518 2,762 2,621 0 2,621 0 0 2,621 0 2,621 874 1,747 43,986 17,472 7,956 14,337
BTU/ Hr
110,210 System Effency 0.8 0.95 $ / CCF 0.983 0.983 2,408 $2,367 $1,955
YMCA Camping Services (Camp Greenkill, Camp McAlister, Camp Talcott) Huguenot, New York
Camp Greenkill
BLOCK LOAD HEATING ESTIMATE - 9,246 sq. ft. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SUBTOTAL
#REF!
Camp McAlister
#REF! #REF! #REF! #REF!
SUBTOTAL
#REF!
Camp Talcott
#REF! #REF! #REF! #REF! #REF! #REF!
SUBTOTAL
#REF!