BAB IV

PENGUMPULAN DAN PENGOLAHAN DATA

MESIN

NO

Mesin Bor

TABEL DATA KERUSAKAN MESIN

1
2
3
4
5
6
7
8
9
10
11
12
13

KOMPONEN
Base (Dudukan )
Column (Tiang)
Table (Meja)
Drill (Mata Bor)
Spindle
Spindle head
Drill Feed Handle
Kabel power
Kabel penghubung
Fuse / sekring
Lampu indicator
Saklar on / off
Saklar pengatur kecepatan

1
1
0
1
3
1
0
0
2
1
1
1
0
2

2
0
0
0
4
0
0
0
1
3
2
0
1
1

3
0
0
0
4
0
1
0
0
1
3
2
2
2

4
0
1
0
4
1
0
1
1
1
2
1
3
2

5
0
1
1
5
0
1
0
0
0
1
2
3
2

PERIODE
6
7
1
0
0
2
1
0
3
2
0
1
1
0
0
0
2
1
2
1
3
2
1
1
1
1
1
1

8
0
1
0
3
1
0
1
0
2
2
0
2
2

9
1
0
0
1
0
1
0
0
2
1
1
1
3

10
1
0
0
4
0
0
0
1
1
1
1
1
1

11
0
1
1
2
1
0
0
0
0
2
2
2
2

12
0
1
0
2
0
0
1
2
0
1
1
2
1

TOTAL
4
7
4
37
5
4
3
10
14
21
13
19
20

MESIN

NO

Mesin Bor

TABEL DATA KERUSAKAN MESIN

1
2
3
4
5
6
7
8
9
10
11
12
13

KOMPONEN
Drill (Mata Bor)
Fuse / sekring
Saklar pengatur kecepatan
Saklar on / off
Kabel penghubung
Lampu indicator
Kabel power
Column (Tiang)
Spindle
Base (Dudukan )
Table (Meja)
Spindle head
Drill Feed Handle

1
3
1
2
0
1
1
2
0
1
1
1
0
0

2
4
2
1
1
3
0
1
0
0
0
0
0
0

285

120

235

100

185

80

135

60

85

40

35

20

3
4
3
2
2
1
2
0
0
0
0
0
1
0

4
4
2
2
3
1
1
1
1
1
0
0
0
1

PERSENTASE
% Kum.

-15

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 0

5
5
1
2
3
0
2
0
1
0
0
1
1
0

PERIODE
6
7
3
2
3
2
1
1
1
1
2
1
1
1
2
1
0
2
0
1
1
0
1
0
1
0
0
0

8
3
2
2
2
2
0
0
1
1
0
0
0
1

9
1
1
3
1
2
1
0
0
0
1
0
1
0

10
4
1
1
1
1
1
1
0
0
1
0
0
0

11
2
2
2
2
0
2
0
1
1
0
1
0
0

12
2
1
1
2
0
1
2
1
0
0
0
0
1

TOTAL

PERSENTASE

% Kum.

37
21
20
19
14
13
10
7
5
4
4
4
3
161

22.98%
13.04%
12.42%
11.80%
8.70%
8.07%
6.21%
4.35%
3.11%
2.48%
2.48%
2.48%
1.86%
100%

22.98%
36.02%
48.45%
60.25%
68.94%
77.02%
83.23%
87.58%
90.68%
93.17%
95.65%
98.14%
100.00%

Tabel Data Waktu Operasi


No

Tanggal Operasional

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

10 Des 11 - 11 Des 11
11 Des 11 - 19 Des 11
19 Des 11 - 11 jan 12
11 jan 12 - 17 Jan 12
17 Jan 12 - 21 Jan 12
21 Jan 12 - 13 Feb 12
13 Feb 12 - 27 Feb 12
27 Feb 12 - 12 Mar 12
12 Mar 12 - 15 Mar 12
15 Mar 12 - 17 Mar 12
17 Mar 12 - 1 Apr 12
1 Apr 12 - 8 Apr 12
8 Apr 12 - 12 Apr 12
12 Apr 12 - 26 Apr 12
26 Apr 12 - 16 Mei 12
16 Mei 12 - 19 Mei 12
19 Mei 12 - 22 Mei 12
22 Mei 12 - 30 Mei 12
30 Mei 12 - 21 Jun 12
21 Jun 12 - 30 Jun 12
30 Jun 12 - 13 Jul 12
13 Jul 12 - 25 Jul 12
25 Jul 12 - 1 Agust 12
1 Agust 12 - 6 Agust 12
6 Agust 12 - 21 Agust 12
21 Agust 12 - 31 Agust 12
31 Agust 12 - 3 Sep 12
3 Sep 12 - 25 Sep 12
25 Sep 12 - 30 Sep 12
30 Sep 12 - 5 Okt 12
5 Okt 12 - 8 Okt 12
8 Okt 12 - 12 Okt 12
12 Okt 12 - 27 Okt 12
27 Okt 12 - 12 Nov 12
12 Nov 12 - 21 Nov 12
21 Nov 12 - 25 Nov 12
25 Nov 12 - 28 Nov 12
28 Nov 12 - 4 Des 12
4 Des 12 - 6 Des 12
6 Des 12 -10 Des 12

Jam Operasional
7:00
13:20
19:14
6:12
12:35
18:01
21:30
0:15
11:00
2:20
12:11
16:00
19:10
1:45
6:47
14:36
3:57
8:59
21:00
7:46
12:14
1:20
13:44
22:14
12:00
18:01
4:45
10:47
18:14
9:42
17:11
5:44
14:23
18:24
0:01
6:00
15:14
21:36
3:00
12:36

12:30
17:30
23:55
12:00
16:45
21:22
23:59
10:17
23:30
11:25
15:47
18:00
23:46
5:47
10:10
22:55
7:56
20:00
23:00
10:45
22:41
14:56
19:17
23:55
16:47
21:56
9:48
16:44
23:41
16:12
23:23
11:45
16:49
23:01
5:02
12:00
20:03
23:41
11:35
18:23

Waktu Operasional (
jam )
29.50
196.17
556.68
149.80
100.17
555.35
338.48
346.03
84.50
57.08
363.60
170.00
100.60
340.03
483.38
80.32
75.98
203.02
530.00
218.98
322.45
301.60
173.55
121.68
364.78
243.92
77.05
533.95
125.45
126.50
78.20
102.02
362.43
388.62
221.02
102.00
76.82
146.08
56.58
101.78

Tabel Data Waktu Reparasi Dan Operasional


( Kerusakan-kerusakan Besar )
No

Tanggal Reparasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

30 Jun 12 - 13 Jul 12
25 Jul 12 - 1 Agust 12
31 Agust 12 - 3 Sep 12
25 Nov 12 - 28 Nov 12
6 Des 12 -10 Des 12
1 Apr 12 - 8 Apr 12
26 Apr 12 - 16 Mei 12
4 Des 12 - 6 Des 12
12 Nov 12 - 21 Nov 12
5 Okt 12 - 8 Okt 12
30 Mei 12 - 21 Jun 12
12 Okt 12 - 27 Okt 12
13 Jul 12 - 25 Jul 12
11 Des 11 - 19 Des 11
6 Agust 12 - 21 Agust 12
10 Des 11 - 11 Des 11
17 Jan 12 - 21 Jan 12
11 jan 12 - 17 Jan 12
13 Feb 12 - 27 Feb 12
25 Sep 12 - 30 Sep 12
22 Mei 12 - 30 Mei 12
8 Apr 12 - 12 Apr 12
27 Feb 12 - 12 Mar 12
8 Okt 12 - 12 Okt 12
19 Des 11 - 11 jan 12
15 Mar 12 - 17 Mar 12
21 Jun 12 - 30 Jun 12
30 Sep 12 - 5 Okt 12
3 Sep 12 - 25 Sep 12
28 Nov 12 - 4 Des 12
21 Agust 12 - 31 Agust 12
1 Agust 12 - 6 Agust 12
16 Mei 12 - 19 Mei 12
21 Jan 12 - 13 Feb 12
27 Okt 12 - 12 Nov 12

Jam Kerusakan
22:42
19:18
9:49
20:04
18:24
18:01
10:11
11:36
5:03
23:24
23:01
16:50
14:57
17:31
16:48
12:31
16:46
12:01
0:00
23:42
20:01
23:47
10:18
11:46
23:56
11:26
10:46
16:13
16:45
23:42
21:57
23:56
22:56
21:23
23:02

23:12
20:03
10:44
21:00
19:23
19:08
11:24
12:49
6:17
0:35
0:23
18:13
16:21
19:04
18:22
14:06
18:25
13:46
1:47
1:29
21:50
1:43
12:24
13:58
2:11
13:41
13:08
18:35
19:09
2:06
0:33
2:42
1:43
0:18
1:57

Waktu Reparasi
( jam )

0.50
0.75
0.92
0.93
0.98
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

Reparasi Dan Operasional


n-kerusakan Besar )
Waktu
Operasional
( jam )
322.45
173.55
77.05
76.82
101.78
170.00
483.38
56.58
221.02
78.20
530.00
362.43
301.60
196.17
364.78
29.50
100.17
149.80
338.48
125.45
203.02
100.60
346.03
102.02
556.68
57.08
218.98
126.50
533.95
146.08
243.92
121.68
80.32
555.35
388.62

Tabel Data Waktu Reparasi


( Kerusakan-Kerusakan Besar )
No

Tanggal Reparasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

11 Des 11
19 Des 11
11-Jan-12
17-Jan-12
21-Jan-12
13-Feb-12
27-Feb-12
12-Mar-12
15-Mar-12
17-Mar-12
1-Apr-12
8-Apr-12
12-Apr-12
26-Apr-12
16 Mei 12
19 Mei 12
22 Mei 12
30 Mei 12
21-Jun-12
30-Jun-12
13-Jul-12
25-Jul-12
1 Agust 12
6 Agust 12
21 Agust 12
31 Agust 12
3 Sep 12
25-Sep-12
30-Sep-12
5 Okt 12
8 Okt 12
12 Okt 12
27 Okt 12
12-Nov-12
21-Nov-12
25-Nov-12
28-Nov-12
4 Des 12
6 Des 12
10 Des 12

Jam Kerusakan
12:31
17:31
23:56
12:01
16:46
21:23
0:00
10:18
23:31
11:26
15:48
18:01
23:47
5:48
10:11
22:56
7:57
20:01
23:01
10:46
22:42
14:57
19:18
23:56
16:48
21:57
9:49
16:45
23:42
16:13
23:24
11:46
16:50
23:02
5:03
12:01
20:04
23:42
11:36
18:24

14:06
19:04
2:11
13:46
18:25
0:18
1:47
12:24
2:34
13:41
19:34
19:08
1:43
9:01
11:24
1:43
11:22
21:50
0:23
13:08
23:12
16:21
20:03
2:42
18:22
0:33
10:44
19:09
1:29
18:35
0:35
13:58
18:13
1:57
6:17
15:13
21:00
2:06
12:49
19:23

Waktu Reparasi
( jam )

1.58
1.55
2.25
1.75
1.65
2.92
1.78
2.10
3.05
2.25
3.77
1.12
1.93
3.22
1.22
2.78
3.42
1.82
1.37
2.37
0.50
1.40
0.75
2.77
1.57
2.60
0.92
2.40
1.78
2.37
1.27
2.20
1.38
2.92
1.23
3.20
0.93
2.40
1.22
0.98

Tabel Data Waktu Reparasi Dan Operasional


( Kerusakan-kerusakan Besar )
No

Tanggal Reparasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

11 Des 11
19 Des 11
11-Jan-12
17-Jan-12
21-Jan-12
13-Feb-12
27-Feb-12
12-Mar-12
15-Mar-12
17-Mar-12
1-Apr-12
8-Apr-12
12-Apr-12
26-Apr-12
16 Mei 12
19 Mei 12
22 Mei 12
30 Mei 12
21-Jun-12
30-Jun-12
13-Jul-12
25-Jul-12
1 Agust 12
6 Agust 12
21 Agust 12
31 Agust 12
3 Sep 12
25-Sep-12
30-Sep-12
5 Okt 12
8 Okt 12
12 Okt 12
27 Okt 12
12-Nov-12
21-Nov-12
25-Nov-12
28-Nov-12
4 Des 12
6 Des 12
10 Des 12

Jam Kerusakan
12:31
17:31
23:56
12:01
16:46
21:23
0:00
10:18
23:31
11:26
15:48
18:01
23:47
5:48
10:11
22:56
7:57
20:01
23:01
10:46
22:42
14:57
19:18
23:56
16:48
21:57
9:49
16:45
23:42
16:13
23:24
11:46
16:50
23:02
5:03
12:01
20:04
23:42
11:36
18:24

14:06
19:04
2:11
13:46
18:25
0:18
1:47
12:24
2:34
13:41
19:34
19:08
1:43
9:01
11:24
1:43
11:22
21:50
0:23
13:08
23:12
16:21
20:03
2:42
18:22
0:33
10:44
19:09
1:29
18:35
0:35
13:58
18:13
1:57
6:17
15:13
21:00
2:06
12:49
19:23

Waktu Reparasi
( jam )

1.58
1.55
2.25
1.75
1.65
2.92
1.78
2.10
3.05
2.25
3.77
1.12
1.93
3.22
1.22
2.78
3.42
1.82
1.37
2.37
0.50
1.40
0.75
2.77
1.57
2.60
0.92
2.40
1.78
2.37
1.27
2.20
1.38
2.92
1.23
3.20
0.93
2.40
1.22
0.98

Waktu Reparasi Dan Operasional


rusakan-kerusakan Besar )
Waktu Operasional
( jam )
29.50
196.17
556.68
149.80
100.17
555.35
338.48
346.03
84.50
57.08
363.60
170.00
100.60
340.03
483.38
80.32
75.98
203.02
530.00
218.98
322.45
301.60
173.55
121.68
364.78
243.92
77.05
533.95
125.45
126.50
78.20
102.02
362.43
388.62
221.02
102.00
76.82
146.08
56.58
101.78

29.50
56.58
57.08
76.82
77.05
78.20
80.32
100.17
100.60
101.78
102.02
121.68
125.45
126.50
146.08
149.80
170.00
173.55
196.17
203.02
218.98
221.02
243.92
301.60
322.45
338.48
346.03
362.43
364.78
388.62
483.38
530.00
533.95
555.35
556.68

4.1 Iterasi 1
4.1.1 Waktu Operasional
A. Perhitungan Distribusi Weibull Untuk Waktu Operasional
No. Rank Umur (ti) Xi = Ln ti
1
29.50
3.38
2
56.58
4.04
3
57.08
4.04
4
76.82
4.34
5
77.05
4.34
6
78.20
4.36
7
80.32
4.39
8
100.17
4.61
9
100.60
4.61
10
101.78
4.62
11
102.02
4.63
12
121.68
4.80
13
125.45
4.83
14
126.50
4.84
15
146.08
4.98
16
149.80
5.01
17
170.00
5.14
18
173.55
5.16
19
196.17
5.28
20
203.02
5.31
21
218.98
5.39
22
221.02
5.40
23
243.92
5.50
24
301.60
5.71
25
322.45
5.78
26
338.48
5.82
27
346.03
5.85
28
362.43
5.89
29
364.78
5.90
30
388.62
5.96
31
483.38
6.18
32
530.00
6.27
33
533.95
6.28
34
555.35
6.32
35
556.68
6.32
Total

Zi

Mi

-4.26
-3.14
-2.62
-2.27
-2.00
-1.78
-1.60
-1.44
-1.30
-1.17
-1.05
-0.94
-0.83
-0.74
-0.64
-0.56
-0.47
-0.39
-0.31
-0.23
-0.15
-0.07
0.00
0.08
0.16
0.24
0.32
0.40
0.48
0.58
0.67
0.78
0.90
1.06
1.27

1.11
0.53
0.35
0.27
0.22
0.18
0.16
0.14
0.13
0.12
0.11
0.10
0.10
0.09
0.09
0.09
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.09
0.09
0.10
0.11
0.12
0.15
0.22
0.00

Ln (ti+1) - Ln (ti) (Ln (ti+1) - Ln (ti))/Mi


0.65
0.01
0.30
0.00
0.01
0.03
0.22
0.00
0.01
0.00
0.18
0.03
0.01
0.14
0.03
0.13
0.02
0.12
0.03
0.08
0.01
0.10
0.21
0.07
0.05
0.02
0.05
0.01
0.06
0.22
0.09
0.01
0.04
0.00
0.00

0.59
0.02
0.84
0.01
0.07
0.15
1.38
0.03
0.09
0.02
1.60
0.30
0.09
1.55
0.28
1.48
0.25
1.52
0.43
0.97
0.12
1.29
2.77
0.87
0.62
0.28
0.56
0.08
0.70
2.24
0.85
0.06
0.26
0.01
0.00

5.53

2.94

22.35

B. Pengujian Kecocokan Distribusi / Pengujian Mann's Test


r 1

K1

r
35

2
2

K1
17.5

r 1
34

17
2
2

r
K1

K2
M

35
17.5
17
#REF!

ln t i 1 ln t i
Mi

ln t i 1 ln t i
Mi

i r / 2 1
r 1

k2
i 1

(17 . 5 * 13 . 61 )

(17 * 22 .35 )

0.63

r
K1

K2
M

2 * K 2 2 * 17

Numerator
Denominator

2 * K 1 2 * 17 . 5

34
35

Syarat :
Hi = Komponen Berdistribusi Weibull
Ho = Kompenen Tidak Berdistribusi Weibull
Jika M < F, maka terima Ho dan tolak Hi ; Maka Komponen Berdistribusi Weibull
Jika M > F, maka tolak Ho dan terima Hi ; Maka Komponen Tidak Berdistribusi Weibull

F ; K1 ; K 2 F0.05;17.5;17

=
=

0.63
1.76

Kesimpulan : F (1.76) > M (0.63), terima Ho dan Tolak Hi, sehingga dapat disimpulkan
bahwa komponen berdistribusi Weibull
C. Perhitungan Plot Weibull Waktu Operasional
i
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

ti
B

Xi = Ln ti
C

F (ti)
D

1 / {1-F(ti)}
E

Ln (E)
F

Yi = ln (F)
G

29.50
56.58
57.08
76.82
77.05
78.20
80.32
100.17
100.60
101.78
102.02
121.68
125.45
126.50
146.08
149.80
170.00
173.55
196.17
203.02
218.98
221.02
243.92
301.60
322.45
338.48
346.03
362.43
364.78
388.62
483.38
530.00
533.95
555.35
556.68

3.38
4.04
4.04
4.34
4.34
4.36
4.39
4.61
4.61
4.62
4.63
4.80
4.83
4.84
4.98
5.01
5.14
5.16
5.28
5.31
5.39
5.40
5.50
5.71
5.78
5.82
5.85
5.89
5.90
5.96
6.18
6.27
6.28
6.32
6.32

0.02
0.05
0.08
0.10
0.13
0.16
0.19
0.22
0.25
0.27
0.30
0.33
0.36
0.39
0.42
0.44
0.47
0.50
0.53
0.56
0.58
0.61
0.64
0.67
0.70
0.73
0.75
0.78
0.81
0.84
0.87
0.90
0.92
0.95
0.98

1.02
1.05
1.08
1.12
1.15
1.19
1.23
1.28
1.33
1.38
1.43
1.49
1.56
1.63
1.71
1.80
1.89
2.00
2.12
2.25
2.41
2.58
2.79
3.03
3.31
3.65
4.07
4.60
5.28
6.21
7.53
9.57
13.11
20.82
50.57

0.02
0.05
0.08
0.11
0.14
0.18
0.21
0.25
0.28
0.32
0.36
0.40
0.44
0.49
0.54
0.59
0.64
0.69
0.75
0.81
0.88
0.95
1.03
1.11
1.20
1.29
1.40
1.53
1.66
1.83
2.02
2.26
2.57
3.04
3.92

-3.91
-3.01
-2.53
-2.20
-1.95
-1.74
-1.56
-1.41
-1.27
-1.14
-1.02
-0.91
-0.81
-0.71
-0.62
-0.53
-0.45
-0.37
-0.29
-0.21
-0.13
-0.05
0.02
0.10
0.18
0.26
0.34
0.42
0.51
0.60
0.70
0.81
0.95
1.11
1.37

Plot Weibull

Plot Weibull
2.00
1.00
0.00
0

10

15

20

25

30

-1.00
-2.00
-3.00
-4.00
-5.00

Xi

D. Tabel Parameter Weibull dari Waktu Operasional Komponen


i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Xi
3.38
4.04
4.04
4.34
4.34
4.36
4.39
4.61
4.61
4.62
4.63
4.80
4.83
4.84
4.98
5.01
5.14
5.16
5.28
5.31
5.39
5.40
5.50
5.71
5.78
5.82
5.85
5.89
5.90
5.96
6.18
6.27
6.28
6.32
6.32
181.28

Yi
-3.91
-3.01
-2.53
-2.20
-1.95
-1.74
-1.56
-1.41
-1.27
-1.14
-1.02
-0.91
-0.81
-0.71
-0.62
-0.53
-0.45
-0.37
-0.29
-0.21
-0.13
-0.05
0.02
0.10
0.18
0.26
0.34
0.42
0.51
0.60
0.70
0.81
0.95
1.11
1.37
-19.45

Xi*Yi
-13.24
-12.15
-10.25
-9.57
-8.47
-7.58
-6.85
-6.47
-5.84
-5.26
-4.73
-4.38
-3.92
-3.46
-3.10
-2.68
-2.31
-1.89
-1.51
-1.10
-0.70
-0.28
0.14
0.58
1.04
1.50
1.98
2.49
3.01
3.59
4.34
5.11
5.94
7.02
8.64
-70.36

Xi
11.45
16.29
16.36
18.85
18.87
19.00
19.24
21.22
21.26
21.37
21.39
23.05
23.35
23.43
24.84
25.09
26.38
26.59
27.87
28.23
29.04
29.14
30.22
32.59
33.36
33.92
34.18
34.73
34.80
35.55
38.20
39.35
39.44
39.94
39.97
958.58

35

40

n X t Y X t Yi

n X t2 X t

Exp
b

(35* (70.36)) (181.28* 19.45))


1.55
(35* 958.58) (181.282 )
19.45
181.28
1.55 *

35
35

8 . 58
Exp

1 . 55

-8.58

254.21
1.55

1
MTTF
1
254 .21 * 0.63

1
1
1 1 1.6452
1.55

Berdasarkan Tabel

160.97 Jam

0.63

E. Tabel Hasil Perhitungan Fungsi Distribusi Kumulatif,


Fungsi Kepadatan Kemungkinan, Fungsi Keandalan dan Fungsi Laju
Kerusakan Pada Waktu Reparasi Pada Mata Bor
t
29.50
56.58
57.08
76.82
77.05
78.20
80.32
100.17
100.60
101.78
102.02
121.68
125.45
126.50
146.08
149.80
170.00
173.55
196.17
203.02
218.98
221.02
243.92
301.60
322.45
338.48
346.03
362.43
364.78
388.62
483.38
530.00
533.95
555.35
556.68

R (t)
0.97
0.91
0.91
0.86
0.85
0.85
0.85
0.79
0.79
0.78
0.78
0.73
0.72
0.71
0.65
0.64
0.59
0.57
0.51
0.49
0.45
0.45
0.39
0.27
0.24
0.21
0.20
0.18
0.17
0.15
0.07
0.04
0.04
0.03
0.03

F (t)
0.03
0.09
0.09
0.14
0.15
0.15
0.15
0.21
0.21
0.22
0.22
0.27
0.28
0.29
0.35
0.36
0.41
0.43
0.49
0.51
0.55
0.55
0.61
0.73
0.76
0.79
0.80
0.82
0.83
0.85
0.93
0.96
0.96
0.97
0.97

h(t).R(t)
0.002
0.002
0.002
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000

Fungsi Distribusi Kumulatif Waktu Operasional :


t
F t 1 Exp

Fungsi Kepadatan Kemungkinan Waktu Operasional :


f t

t
Exp

Fungsi Keandalan Waktu Operasional :


t
Rt Exp

Fungsi Laju Kerusakan :

ht

h (t)
0.002
0.003
0.003
0.003
0.003
0.003
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.006
0.006
0.006
0.007
0.007
0.007
0.007
0.007
0.007
0.008
0.009
0.009
0.009
0.009
0.009

R (t)=
F (t)=
h (t)=

Grafik

Kurva Fungsi Keandalan Waktu Operasional


1.20
1.00
R (t)

0.80
0.60

0.40
0.20
0.00

t (jam)

Kurva Distribusi Kumulatif Waktu Operasional


1.20
1.00
F (t)

0.80
0.60
0.40
0.20
0.00

t (jam)

f (t)

Kurva Fungsi Kemungkinan Kepadatan Waktu Operasional


0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000

t (jam)

h (t)

Kurva Fungsi Laju Kerusakan Waktu Operasional


0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0.000

t (jam)

F. Interval Penggantian Komponen Mata Bor Pada Mesin No.4


Diket :
Tf = MTTR
Tp = MTTR

MTTF
D(tp) min
Replacement Age
Availability (tp)

tp (jam)
1
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650

=
=
=
=
=
=
=
=

1.23
1.23
1.55
254.21
160.97 Jam
0.0075539
150
99.24%

R(tp)
1.000
0.923
0.790
0.643
0.502
0.377
0.275
0.194
0.133
0.089
0.058
0.037
0.023
0.014
0.008
0.005
0.003
0.002
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Age Replacement
F(tp)
M(tp)
1 - R(tp)
0.000
859463.54
0.077
2082.44
0.210
767.08
0.357
450.98
0.498
323.11
0.623
258.55
0.725
221.89
0.806
199.64
0.867
185.63
0.911
176.63
0.942
170.83
0.963
167.09
0.977
164.72
0.986
163.22
0.992
162.30
0.995
161.74
0.997
161.41
0.998
161.22
0.999
161.11
1.000
161.04
1.000
161.01
1.000
160.99
1.000
160.98
1.000
160.98
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97
1.000
160.97

D(tp)
0.00753356390
0.00753794290
0.00754548200
0.00755386570
0.00756193490
0.00756905490
0.00757495170
0.00757959360
0.00758309330
0.00758563390
0.00758741640
0.00758862850
0.00758942930
0.00758994420
0.00759026690
0.00759046430
0.00759058220
0.00759065120
0.00759069060
0.00759071270
0.00759072490
0.00759073140
0.00759073490
0.00759073670
0.00759073760
0.00759073800
0.00759073830
0.00759073840
0.00759073840
0.00759073840
0.00759073850
0.00759073850
0.00759073850
0.00759073850

1700
1750
1800
1850
1900
1950
2000
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
3000
3050
3100
3150
3200
3250
3300
3350
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
4700
4750
4800
4850
4900
4950
5000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97
160.97

0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850
0.00759073850

G. Availability ( Ketersediaan )

Avialibity

Uptime
Uptime Downtime

=
=

160 .97
1 .23 160 .97
99.24%

H. Perhitungan Umur Desain

tR ln R
254.212
1.000
1.000* ( - ( 1 / 1.55 ))
-0.645
R
R=

= 254.212 ( - ln R ) ^ (1 / 1.55)
= ( - ln R ) ^ (1 / 1.55)
= - ln R
= - ln R
= Exp (-0.645)
0.52452

52.45%

Untuk mengetahui umur desain dari keandalan Mesin Nomor 4, maka dilakukan perhitungan
keandalan dengan tingkat keandalan 90%, 80% dan 70%
Perhitungan keandalan dengan tingkat keandalan 90% adalah :

t R ln R

t90%

= 254.21 ( - ln 90% ) ^ (1 / 1.55)


= 254.21 (0.1054 ) ^ (1 / 1.55)
=26.7838 ^ (1 / 1.55)
=
8.34

Jam

Perhitungan keandalan dengan tingkat keandalan 80% adalah :

t R ln R
t80% = 254.21 ( - ln 80% ) ^ (1 / 1.55)
1

= 254.21 (0.2231 ) ^ (1 / 1.55)


=56.7248 ^ (1 / 1.55)
=
13.54

Jam

Perhitungan keandalan dengan tingkat keandalan 70% adalah :

t R ln R
t70% = 254.21 ( - ln 70% ) ^ (1 / 1.55)
1

= 254.21 (0.3567 ) ^ (1 / 1.55)


= 90.6773 ^ (1 / 1.55)
=
18.32

Jam

I. Interval Waktu Pemeriksaan Mesin Untuk Periode Waktu 3 Bulan


MTTF =

160.972 Jam
(6 hari 17 jam 37 menit)
=
1.55
=
254.21

Tanggal
11
17
23
29
4
10
16
22
28
3
9
15
21
27
4
10
16
22
28

Bulan
Desember
Desember
Desember
Desember
Januari
Januari
Januari
Januari
Januari
Februari
Februari
Februari
Februari
Februari
Maret
Maret
Maret
Maret
Maret

Tahun
2011
2011
2011
2011
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012

17:37:00

Jam
00:00:00
17:37:00
11:14:00
04:51:00
22:28:00
16:05:00
09:42:00
03:19:00
20:56:00
14:33:00
08:10:00
01:47:00
19:24:00
13:01:00
06:38:00
00:15:00
17:52:00
11:29:00
05:06:00

Rumus mencari nilai :


Zi = LN(-LN(1-((A6-0.5)/(37+0.5))))

13.61

Rumus mencari nilai :


F (ti) = (A80-0.3)/(37+0.4)

1.645268155
0.633220776

Rumus mencari nilai :


EXP(-((B198/$F$183)^$F$185))
1-R(t)
($F$185/$F$183)*((B198/$F$183)^($F$185-1))

-0.105360516
26.783886180

-0.223143551
56.72482073

-0.356674944
90.67734854

6.707174677
144
16.972

134.4333333

4.1.2 Waktu Reparasi


A. Perhitungan Distribusi Weibull Untuk Waktu Reparasi
No. Rank Umur (ti) Xi = Ln ti
1
0.50
-0.69
2
0.75
-0.29
3
0.92
-0.09
4
0.93
-0.07
5
0.98
-0.02
6
1.12
0.11
7
1.22
0.20
8
1.22
0.20
9
1.23
0.21
10
1.27
0.24
11
1.37
0.31
12
1.38
0.32
13
1.40
0.34
14
1.55
0.44
15
1.57
0.45
16
1.58
0.46
17
1.65
0.50
18
1.75
0.56
19
1.78
0.58
20
1.78
0.58
21
1.82
0.60
22
1.93
0.66
23
2.10
0.74
24
2.20
0.79
25
2.25
0.81
26
2.25
0.81
27
2.37
0.86
28
2.37
0.86
29
2.40
0.88
30
2.40
0.88
31
2.60
0.96
32
2.77
1.02
33
2.78
1.02
34
2.92
1.07
35
2.92
1.07
Total

Zi
-4.26
-3.14
-2.62
-2.27
-2.00
-1.78
-1.60
-1.44
-1.30
-1.17
-1.05
-0.94
-0.83
-0.74
-0.64
-0.56
-0.47
-0.39
-0.31
-0.23
-0.15
-0.07
0.00
0.08
0.16
0.24
0.32
0.40
0.48
0.58
0.67
0.78
0.90
1.06
1.27

Mi
1.11
0.53
0.35
0.27
0.22
0.18
0.16
0.14
0.13
0.12
0.11
0.10
0.10
0.09
0.09
0.09
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.09
0.09
0.10
0.11
0.12
0.15
0.22
0.00
5.53

Ln (ti+1) - Ln (ti)
0.41
0.20
0.02
0.05
0.13
0.09
0.00
0.01
0.03
0.08
0.01
0.01
0.10
0.01
0.01
0.04
0.06
0.02
0.00
0.02
0.06
0.08
0.05
0.02
0.00
0.05
0.00
0.01
0.00
0.08
0.06
0.01
0.05
0.00
0.00
1.76

(Ln (ti+1) - Ln (ti))/Mi


0.36
0.38
0.05
0.20
0.59
0.47
0.00
0.10
0.21
0.64
0.11
0.12
1.04
0.12
0.12
0.48
0.71
0.23
0.00
0.24
0.81
1.08
0.61
0.29
0.00
0.63
0.00
0.16
0.00
0.82
0.58
0.05
0.31
0.00
0.00
11.49

B. Pengujian Kecocokan Distribusi / Pengujian Mann's Test


r 1

k1

r
35
K1

2
2

17.5

k2

i 1

r 1 34
K2

2
2
r

K1

K2
M

ln t i 1 ln t i
Mi
ln t i 1 ln t i
Mi

i r / 2 1
r 1

17 .5 * 5 .80
17 * 11 .49

17
35
17.5
17
0.52

2 * K 2 2 * 17
Numerator
Denominator 2 * K 1 2 * 17 . 5

34
35

Syarat :
Hi = Komponen Berdistribusi Weibull
Ho = Kompenen Tidak Berdistribusi Weibull
Jika M < F, maka terima Ho dan tolak Hi ; Maka Komponen Berdistribusi Weibull
Jika M > F, maka tolak Ho dan terima Hi ; Maka Komponen Tidak Berdistribusi Weibull
M

;K

;K

F 0 . 05

=
; 34 ; 35

0.52
1.76

Kesimpulan : F (1.76) > M (0.52), terima Ho dan Tolak Hi, sehingga dapat disimpulkan
bahwa komponen berdistribusi Weibull
C. Perhitungan Plot Weibull Waktu Operasional
i
A
1
2
3
4
5
6
7
8
9
10

ti
B
0.50
0.75
0.92
0.93
0.98
1.12
1.22
1.22
1.23
1.27

Xi = Ln ti
C
-0.69
-0.29
-0.09
-0.07
-0.02
0.11
0.20
0.20
0.21
0.24

F (ti)
D
0.02
0.05
0.08
0.10
0.13
0.16
0.19
0.22
0.25
0.27

1 / {1-F(ti)}
E
1.02
1.05
1.08
1.12
1.15
1.19
1.23
1.28
1.33
1.38

Ln (E)
F
0.02
0.05
0.08
0.11
0.14
0.18
0.21
0.25
0.28
0.32

Yi = ln (F)
G
-3.91
-3.01
-2.53
-2.20
-1.95
-1.74
-1.56
-1.41
-1.27
-1.14

0.52

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

0.31
0.32
0.34
0.44
0.45
0.46
0.50
0.56
0.58
0.58
0.60
0.66
0.74
0.79
0.81
0.81
0.86
0.86
0.88
0.88
0.96
1.02
1.02
1.07
1.07

0.30
0.33
0.36
0.39
0.42
0.44
0.47
0.50
0.53
0.56
0.58
0.61
0.64
0.67
0.70
0.73
0.75
0.78
0.81
0.84
0.87
0.90
0.92
0.95
0.98

1.43
1.49
1.56
1.63
1.71
1.80
1.89
2.00
2.12
2.25
2.41
2.58
2.79
3.03
3.31
3.65
4.07
4.60
5.28
6.21
7.53
9.57
13.11
20.82
50.57

0.36
0.40
0.44
0.49
0.54
0.59
0.64
0.69
0.75
0.81
0.88
0.95
1.03
1.11
1.20
1.29
1.40
1.53
1.66
1.83
2.02
2.26
2.57
3.04
3.92

-1.02
-0.91
-0.81
-0.71
-0.62
-0.53
-0.45
-0.37
-0.29
-0.21
-0.13
-0.05
0.02
0.10
0.18
0.26
0.34
0.42
0.51
0.60
0.70
0.81
0.95
1.11
1.37

Grafik Plot Weibull

Plot Weibull
2.00
1.00
0.00
0

10

15

20

Yi

-1.00
-2.00
-3.00
-4.00

-5.00

25

30

35

40

D. Tabel Parameter Weibull dari Waktu Operasional Komponen


i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Xi
-0.69
-0.29
-0.09
-0.07
-0.02
0.11
0.20
0.20
0.21
0.24
0.31
0.32
0.34
0.44
0.45
0.46
0.50
0.56
0.58
0.58
0.60
0.66
0.74
0.79
0.81
0.81
0.86
0.86
0.88
0.88
0.96
1.02
1.02
1.07
1.07
17.35

Yi
-3.91
-3.01
-2.53
-2.20
-1.95
-1.74
-1.56
-1.41
-1.27
-1.14
-1.02
-0.91
-0.81
-0.71
-0.62
-0.53
-0.45
-0.37
-0.29
-0.21
-0.13
-0.05
0.02
0.10
0.18
0.26
0.34
0.42
0.51
0.60
0.70
0.81
0.95
1.11
1.37
-19.45

n X iYi X i Yi

n X i X i
2

ii

X
n

Xi
0.48
0.08
0.01
0.00
0.00
0.01
0.04
0.04
0.04
0.06
0.10
0.11
0.11
0.19
0.20
0.21
0.25
0.31
0.33
0.33
0.36
0.43
0.55
0.62
0.66
0.66
0.74
0.74
0.77
0.77
0.91
1.04
1.05
1.15
1.15
14.50

35* 7.33 17.35* 19.45


35*14.50 17.352

2.88

19.45
17.35
2.88*

35
35

-1.98

Xi*Yi
2.71
0.87
0.22
0.15
0.03
-0.19
-0.31
-0.28
-0.27
-0.27
-0.32
-0.30
-0.27
-0.31
-0.28
-0.25
-0.22
-0.21
-0.17
-0.12
-0.08
-0.03
0.02
0.08
0.15
0.21
0.29
0.36
0.45
0.53
0.67
0.83
0.97
1.19
1.46
7.33

a
0.94
Exp
Exp

b
1.41

1.99

2.88

1
MTTR 1 1.99 * 0.62

1.23 Jam

1
1

1 1
1.3476 Berdasarkan Tabel
2.88

0.6182

E. Tabel Hasil Perhitungan Fungsi Distribusi Kumulatif,


Fungsi Kepadatan Kemungkinan, Fungsi Keandalan dan Fungsi Laju
Kerusakan Pada Waktu Reparasi Pada Mata Bor
t
0.50
0.75
0.92
0.93
0.98
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

R (t)
0.98
0.94
0.90
0.89
0.88
0.83
0.78
0.78
0.78
0.76
0.71
0.70
0.70
0.62
0.61
0.60
0.56
0.50
0.48
0.48
0.46
0.40
0.31
0.26
0.24
0.24
0.19
0.19
0.18
0.18
0.12
0.08
0.07
0.05
0.05

F (t)
0.02
0.06
0.10
0.11
0.12
0.17
0.22
0.22
0.22
0.24
0.29
0.30
0.30
0.38
0.39
0.40
0.44
0.50
0.52
0.52
0.54
0.60
0.69
0.74
0.76
0.76
0.81
0.81
0.82
0.82
0.88
0.92
0.93
0.95
0.95

f (t)
0.11
0.22
0.30
0.31
0.34
0.40
0.45
0.45
0.46
0.47
0.51
0.51
0.52
0.55
0.56
0.56
0.57
0.57
0.57
0.57
0.56
0.55
0.50
0.46
0.44
0.44
0.39
0.39
0.37
0.37
0.28
0.20
0.20
0.15
0.15

h (t)
0.11
0.23
0.34
0.35
0.38
0.49
0.57
0.57
0.59
0.62
0.71
0.73
0.75
0.90
0.92
0.94
1.01
1.13
1.17
1.17
1.22
1.37
1.60
1.74
1.82
1.82
2.00
2.00
2.05
2.05
2.38
2.68
2.71
2.95
2.95

Fungsi Distribusi Kumulatif Waktu Reparasi :


t
F t 1 Exp

Fungsi Kepadatan Kemungkinan Waktu Reparasi :


f t

t
Exp

Fungsi Keandalan Waktu Reparasi :


t
Rt Exp

Fungsi Laju Kerusakan :

ht

Grafik

Kurva Fungsi Keandalan Waktu Reparasi


1.20
1.00
R (t)

0.80

0.60
0.40
0.20
0.00
0.50 0.92 0.98 1.22 1.23 1.37 1.40 1.57 1.65 1.78 1.82 2.10 2.25 2.37 2.40 2.60 2.78 2.92
t (jam)

F (t)

Kurva Fungsi Distribusi Kumulatif


1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0.50 0.92 0.98 1.22 1.23 1.37 1.40 1.57 1.65 1.78 1.82 2.10 2.25 2.37 2.40 2.60 2.78 2.92

t (jam)

Kurva Fungsi Kemungkinan Kepadatan Waktu Reparasi


0.60
0.50
f (t)

0.40
0.30
0.20
0.10
0.00
0.50 0.92 0.98 1.22 1.23 1.37 1.40 1.57 1.65 1.78 1.82 2.10 2.25 2.37 2.40 2.60 2.78 2.92
t (jam)

Kurva Fungsi Laju Kerusakan


3.50

3.00

h (t)

2.50

2.00
1.50
1.00
0.50
0.00
0.50 0.92 0.98 1.22 1.23 1.37 1.40 1.57 1.65 1.78 1.82 2.10 2.25 2.37 2.40 2.60 2.78 2.92

5.80

1.3476445
0.62

No

Tanggal Reparasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

30 Jun 12 - 13 Jul 12
25 Jul 12 - 1 Agust 12
31 Agust 12 - 3 Sep 12
25 Nov 12 - 28 Nov 12
6 Des 12 -10 Des 12
1 Apr 12 - 8 Apr 12
26 Apr 12 - 16 Mei 12
4 Des 12 - 6 Des 12
12 Nov 12 - 21 Nov 12
5 Okt 12 - 8 Okt 12
30 Mei 12 - 21 Jun 12
12 Okt 12 - 27 Okt 12
13 Jul 12 - 25 Jul 12
11 Des 11 - 19 Des 11
6 Agust 12 - 21 Agust 12
10 Des 11 - 11 Des 11
17 Jan 12 - 21 Jan 12
11 jan 12 - 17 Jan 12
13 Feb 12 - 27 Feb 12
25 Sep 12 - 30 Sep 12
22 Mei 12 - 30 Mei 12
8 Apr 12 - 12 Apr 12
27 Feb 12 - 12 Mar 12
8 Okt 12 - 12 Okt 12
19 Des 11 - 11 jan 12
15 Mar 12 - 17 Mar 12
21 Jun 12 - 30 Jun 12
30 Sep 12 - 5 Okt 12
3 Sep 12 - 25 Sep 12
28 Nov 12 - 4 Des 12
21 Agust 12 - 31 Agust 12
1 Agust 12 - 6 Agust 12
16 Mei 12 - 19 Mei 12
21 Jan 12 - 13 Feb 12
27 Okt 12 - 12 Nov 12

Jam Kerusakan
22:42
19:18
9:49
20:04
18:24
18:01
10:11
11:36
5:03
23:24
23:01
16:50
14:57
17:31
16:48
12:31
16:46
12:01
0:00
23:42
20:01
23:47
10:18
11:46
23:56
11:26
10:46
16:13
16:45
23:42
21:57
23:56
22:56
21:23
23:02

23:12
20:03
10:44
21:00
19:23
19:08
11:24
12:49
6:17
0:35
0:23
18:13
16:21
19:04
18:22
14:06
18:25
13:46
1:47
1:29
21:50
1:43
12:24
13:58
2:11
13:41
13:08
18:35
19:09
2:06
0:33
2:42
1:43
0:18
1:57

Waktu Reparasi Waktu Operasional


(Jam)
(Jam)
0.50
0.75
0.92
0.93
0.98
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

322.45
173.55
77.05
76.82
101.78
170.00
483.38
56.58
221.02
78.20
530.00
362.43
301.60
196.17
364.78
29.50
100.17
149.80
338.48
125.45
203.02
100.60
346.03
102.02
556.68
57.08
218.98
126.50
533.95
146.08
243.92
121.68
80.32
555.35
388.62

No

Tanggal Reparasi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

1 Apr 12 - 8 Apr 12
26 Apr 12 - 16 Mei 12
4 Des 12 - 6 Des 12
12 Nov 12 - 21 Nov 12
5 Okt 12 - 8 Okt 12
30 Mei 12 - 21 Jun 12
12 Okt 12 - 27 Okt 12
13 Jul 12 - 25 Jul 12
11 Des 11 - 19 Des 11
6 Agust 12 - 21 Agust 12
10 Des 11 - 11 Des 11
17 Jan 12 - 21 Jan 12
11 jan 12 - 17 Jan 12
13 Feb 12 - 27 Feb 12
25 Sep 12 - 30 Sep 12
22 Mei 12 - 30 Mei 12
8 Apr 12 - 12 Apr 12
27 Feb 12 - 12 Mar 12
8 Okt 12 - 12 Okt 12
19 Des 11 - 11 jan 12
15 Mar 12 - 17 Mar 12
21 Jun 12 - 30 Jun 12
30 Sep 12 - 5 Okt 12
3 Sep 12 - 25 Sep 12
28 Nov 12 - 4 Des 12
21 Agust 12 - 31 Agust 12
1 Agust 12 - 6 Agust 12
16 Mei 12 - 19 Mei 12
21 Jan 12 - 13 Feb 12
27 Okt 12 - 12 Nov 12

Jam Kerusakan
18:01
10:11
11:36
5:03
23:24
23:01
16:50
14:57
17:31
16:48
12:31
16:46
12:01
0:00
23:42
20:01
23:47
10:18
11:46
23:56
11:26
10:46
16:13
16:45
23:42
21:57
23:56
22:56
21:23
23:02

19:08
11:24
12:49
6:17
0:35
0:23
18:13
16:21
19:04
18:22
14:06
18:25
13:46
1:47
1:29
21:50
1:43
12:24
13:58
2:11
13:41
13:08
18:35
19:09
2:06
0:33
2:42
1:43
0:18
1:57

Waktu
Reparasi (Jam)
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

Waktu
Operasional
(Jam)
170.00
483.38
56.58
221.02
78.20
530.00
362.43
301.60
196.17
364.78
29.50
100.17
149.80
338.48
125.45
203.02
100.60
346.03
102.02
556.68
57.08
218.98
126.50
533.95
146.08
243.92
121.68
80.32
555.35
388.62

4.2 Iterasi 2
4.2.1 Waktu Operasional
A. Perhitungan Distribusi Weibull Untuk Waktu Operasional
No. Rank Umur (ti) Xi = Ln ti
3.38
1
29.50
4.04
2
56.58
4.04
3
57.08
4.36
4
78.20
4.39
5
80.32
4.61
6
100.17
4.61
7
100.60
4.63
8
102.02
4.80
9
121.68
4.83
10
125.45
4.84
11
126.50
4.98
12
146.08
5.01
13
149.80
5.14
14
170.00
5.28
15
196.17
5.31
16
203.02
5.39
17
218.98
5.40
18
221.02
5.50
19
243.92
5.71
20
301.60
5.82
21
338.48
5.85
22
346.03
5.89
23
362.43
5.90
24
364.78
5.96
25
388.62
6.18
26
483.38
6.27
27
530.00
6.28
28
533.95
6.32
29
555.35
6.32
30
556.68
Total

Zi
-4.10
-2.99
-2.46
-2.10
-1.83
-1.62
-1.43
-1.27
-1.12
-0.99
-0.86
-0.75
-0.64
-0.54
-0.44
-0.34
-0.25
-0.16
-0.07
0.02
0.11
0.20
0.29
0.39
0.49
0.59
0.71
0.84
1.00
1.23

Mi
1.12
0.53
0.35
0.27
0.22
0.19
0.16
0.15
0.13
0.12
0.11
0.11
0.10
0.10
0.10
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.10
0.10
0.11
0.12
0.13
0.16
0.23
0.00
5.33

Ln (ti+1) - Ln (ti)
0.65
0.01
0.31
0.03
0.22
0.00
0.01
0.18
0.03
0.01
0.14
0.03
0.13
0.14
0.03
0.08
0.01
0.10
0.21
0.12
0.02
0.05
0.01
0.06
0.22
0.09
0.01
0.04
0.00
0.00
2.94

(Ln (ti+1) - Ln (ti))/Mi


0.58
0.02
0.89
0.10
1.01
0.02
0.09
1.21
0.23
0.07
1.25
0.23
1.23
1.45
0.36
0.82
0.10
1.10
2.38
1.29
0.24
0.50
0.07
0.64
2.05
0.79
0.06
0.24
0.01
0.00
19.02

B. Pengujian Kecocokan Distribusi / Pengujian Mann's Test

r
30

2
2
r 1
29

2
2

r
K1

K2
M

30
15
14.5
0.58

r 1

15
14.5

k1
M

ln t i 1 ln t i
Mi
ln t i 1 ln t i
Mi

i r / 2 1
r 1

k2

i 1

(15 * 10 .65 )

(14 .5 * 19 .02 )

0.58

Numerator
= 2 * K2 = 2 * 14.5 =
Denominator = 2 * K1 = 2 * 15 =

29
30

Syarat :
Hi = Komponen Berdistribusi Weibull
Ho = Kompenen Tidak Berdistribusi Weibull
Jika M < F, maka terima Ho dan tolak Hi ; Maka Komponen Berdistribusi Weibull
Jika M > F, maka tolak Ho dan terima Hi ; Maka Komponen Tidak Berdistribusi Weibull

M
F a ; K

1 ;K 2

F0 , 05 ;15 ;14 , 5

=
=

0.58
2.46

Kesimpulan : F (2.46) > M (0.58), terima Ho dan Tolak Hi, sehingga dapat disimpulkan
bahwa komponen berdistribusi Weibull

C. Perhitungan Plot Weibull Waktu Operasional


i
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

ti
B
29.50
56.58
57.08
78.20
80.32
100.17
100.60
102.02
121.68
125.45
126.50
146.08
149.80
170.00
196.17
203.02
218.98
221.02
243.92
301.60
338.48
346.03
362.43
364.78
388.62
483.38
530.00
533.95
555.35
556.68

Xi = Ln ti
C
3.38
4.04
4.04
4.36
4.39
4.61
4.61
4.63
4.80
4.83
4.84
4.98
5.01
5.14
5.28
5.31
5.39
5.40
5.50
5.71
5.82
5.85
5.89
5.90
5.96
6.18
6.27
6.28
6.32
6.32

F (ti)
D
0.02
0.06
0.09
0.12
0.15
0.19
0.22
0.25
0.29
0.32
0.35
0.38
0.42
0.45
0.48
0.52
0.55
0.58
0.62
0.65
0.68
0.71
0.75
0.78
0.81
0.85
0.88
0.91
0.94
0.98

1 / {1-F(ti)}
E
1.02
1.06
1.10
1.14
1.18
1.23
1.28
1.34
1.40
1.47
1.54
1.63
1.72
1.82
1.94
2.07
2.22
2.39
2.60
2.84
3.13
3.49
3.95
4.54
5.33
6.47
8.22
11.26
17.88
43.43

Ln (E)
F
0.02
0.06
0.09
0.13
0.17
0.21
0.25
0.29
0.34
0.38
0.43
0.49
0.54
0.60
0.66
0.73
0.80
0.87
0.95
1.04
1.14
1.25
1.37
1.51
1.67
1.87
2.11
2.42
2.88
3.77

Yi = ln (F)
G
-3.76
-2.86
-2.38
-2.04
-1.78
-1.57
-1.39
-1.23
-1.09
-0.96
-0.84
-0.72
-0.61
-0.51
-0.41
-0.32
-0.23
-0.14
-0.05
0.04
0.13
0.22
0.32
0.41
0.52
0.62
0.74
0.88
1.06
1.33

Plot Weibull
Plot Weibull
2.00

Yi

1.00
0.00
-1.00 0

10

15

20

25

30

-2.00
-3.00
-4.00
-5.00
Xi

D. Tabel Parameter Weibull dari Waktu Operasional Komponen


i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Xi
3.38
4.04
4.04
4.36
4.39
4.61
4.61
4.63
4.80
4.83
4.84
4.98
5.01
5.14
5.28
5.31
5.39
5.40
5.50
5.71
5.82
5.85
5.89
5.90
5.96
6.18
6.27
6.28
6.32
6.32
157.04

Yi
-3.76
-2.86
-2.38
-2.04
-1.78
-1.57
-1.39
-1.23
-1.09
-0.96
-0.84
-0.72
-0.61
-0.51
-0.41
-0.32
-0.23
-0.14
-0.05
0.04
0.13
0.22
0.32
0.41
0.52
0.62
0.74
0.88
1.06
1.33
-16.59

Xi*Yi
-12.72
-11.52
-9.61
-8.90
-7.82
-7.24
-6.41
-5.69
-5.22
-4.62
-4.04
-3.60
-3.08
-2.63
-2.19
-1.70
-1.22
-0.73
-0.25
0.25
0.77
1.31
1.87
2.44
3.07
3.86
4.67
5.55
6.69
8.39
-60.33

Xi
11.45
16.29
16.36
19.00
19.24
21.22
21.26
21.39
23.05
23.35
23.43
24.84
25.09
26.38
27.87
28.23
29.04
29.14
30.22
32.59
33.92
34.18
34.73
34.80
35.55
38.20
39.35
39.44
39.94
39.97
839.53

35

n X i Yi X i Yi

(30 * (60.33)) (157.04 * 16.59))


(30 * 839.53) (157.042 )

16.59
157.04
1.52 *

30
30

Exp

8 . 51
Exp

1 . 52

n X i X i

Berdasarkan Tabel

1.52

-8.51

270.04

1.52

1
MTTF 1 270.04 * 0.63

1
1

1
1


1 . 52

171.131

Jam

1.66
0.63371

E. Tabel Hasil Perhitungan Fungsi Distribusi Kumulatif, Fungsi Kepadatan Kemungkinan,


Fungsi Keandalan dan Fungsi Laju Kerusakan Pada Waktu Operasional Pada Mata Pisau
t
29.50
56.58
57.08
78.20
80.32
100.17
100.60
102.02
121.68
125.45
126.50
146.08
149.80
170.00
196.17
203.02
218.98
221.02
243.92
301.60
338.48
346.03
362.43
364.78
388.62
483.38
530.00
533.95
555.35
556.68

R (t)
0.97
0.91
0.91
0.86
0.85
0.80
0.80
0.80
0.74
0.73
0.73
0.68
0.66
0.61
0.54
0.52
0.48
0.48
0.42
0.31
0.24
0.23
0.21
0.21
0.18
0.09
0.06
0.06
0.05
0.05

F (t)
0.03
0.09
0.09
0.14
0.15
0.20
0.20
0.20
0.26
0.27
0.27
0.32
0.34
0.39
0.46
0.48
0.52
0.52
0.58
0.69
0.76
0.77
0.79
0.79
0.82
0.91
0.94
0.94
0.95
0.95

f (t)
0.002
0.002
0.002
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.003
0.002
0.002
0.002
0.002
0.002
0.001
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000

h (t)
0.002
0.002
0.003
0.003
0.003
0.003
0.003
0.003
0.004
0.004
0.004
0.004
0.004
0.004
0.005
0.005
0.005
0.005
0.005
0.006
0.006
0.006
0.007
0.007
0.007
0.008
0.008
0.008
0.008
0.008

Fungsi Distribusi Kumulatif Waktu Operasional :

t
F t 1 Exp

Fungsi Kepadatan Kemungkinan Waktu Operasional :
f t

t
Exp

Fungsi Keandalan Waktu Operasional :


t
Rt Exp

Fungsi Laju Kerusakan :

ht

Grafik

t (jam)

555.35

530.00

388.62

362.43

338.48

243.92

218.98

196.17

149.80

126.50

121.68

80.32

100.60

57.08

1.20
1.00
0.80
0.60
0.40
0.20
0.00
29.50

R (t)

Kurva Fungsi Keandalan Waktu Operasional

t (jam)

F (t)

Kurva Fungsi Distribusi Kumulatif Waktu Operasional

1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00

t (jam)

h (t)

Kurva Fungsi Laju Kerusakan Waktu Operasional


0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0.000

t (jam)

555.35

530.00

388.62

362.43

338.48

243.92

218.98

196.17

149.80

126.50

121.68

100.60

80.32

57.08

0.003
0.003
0.002
0.002
0.001
0.001
0.000
29.50

f (t)

Kurva Fungsi Kepadatan Kemungkinan Waktu OPerasional

F. Interval Penggantian Komponen Mata Bor Pada Mesin No.4


Diket :
Tf = MTTR
Tp = MTTR

MTTF
D(tp) min
Replacement Age
Availability (tp)

tp (jam)
1
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350

=
=

1.30
1.30
= 1.52
=
270.04
= 171.131 Jam
= 0.004796
=
150
= 99.24%
Age Replacement
R(tp)
F(tp)
M(tp)
1 - R(tp)
1.00
0.00
850399.68
0.93
0.07
2309.03
0.80
0.20
863.51
0.66
0.34
509.69
0.53
0.47
364.67
0.41
0.59
290.50
0.31
0.69
247.77
0.23
0.77
221.35
0.16
0.84
204.33
0.11
0.89
193.10
0.08
0.92
185.61
0.05
0.95
180.60
0.03
0.97
177.25
0.02
0.98
175.04
0.01
0.99
173.60
0.01
0.99
172.66
0.01
0.99
172.07
0.00
1.00
171.70
0.00
1.00
171.47
0.00
1.00
171.33
0.00
1.00
171.24
0.00
1.00
171.20
0.00
1.00
171.17
0.00
1.00
171.15
0.00
1.00
171.14
0.00
1.00
171.14
0.00
1.00
171.13
0.00
1.00
171.13

D(tp)
0.007523
0.005965
0.005165
0.004796
0.004684
0.004742
0.004920
0.005181
0.005496
0.005835
0.006171
0.006483
0.006755
0.006979
0.007155
0.007286
0.007380
0.007446
0.007490
0.007519
0.007538
0.007550
0.007557
0.007561
0.007564
0.007565
0.007566
0.007566

1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
3000
3050
3100
3150
3200
3250
3300
3350

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13

0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567

3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
4700
4750
4800
4850
4900
4950
5000

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13
171.13

0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567
0.007567

Grafik D (tp)
D(tp)
0.009000
0.008000
0.007000
0.006000
0.005000
0.004000
0.003000
0.002000
0.001000
0.000000
4800

4400

4000

3600

3200

2800

2400

2000

1600

800

1200

400

D(tp)

G. Availability ( Ketersediaan )
Avialibity

Uptime
Uptime Downtime

=
=

171 .131
1 .30 171 .131
99.24%

H. Perhitungan Umur Desain

tR ln R
270.04
1.000
1.000 ^ ( - ( 1 / 1.52))
-0.658
R
R=

= 270.04 ( - ln R ) ^ (1 / 1.52)
= ( - ln R ) ^ (1 / 1.52)
= - ln R
= - ln R
= Exp (-0.658)
0.518

51.79%

Untuk mengetahui umur desain dari keandalan Mesin Nomor 4, maka dilakukan perhitungan
keandalan dengan tingkat keandalan 90%, 80% dan 70%
Perhitungan keandalan dengan tingkat keandalan 90% adalah :

tR ln R

t90%

= 270.04( - ln 90% ) ^ (1 / 1.52)


= 270.04(0.1054 ) ^ (1 / 1.52)
=28.4519 ^ (1 / 1.52)
=
9.05 Jam

Perhitungan keandalan dengan tingkat keandalan 80% adalah :

tR ln R

t80% = 270.04 ( - ln 80% ) ^ (1 / 1.52)


= 270.04 (0.2231 ) ^ (1 / 1.52)
=60.2585 ^ (1 / 1.52)
=
14.83 Jam
Perhitungan keandalan dengan tingkat keandalan 70% adalah :

tR ln R

t70% = 270.04 ( - ln 70% ) ^ (1 /1.52)


= 270.4 (0.3567 ) ^ (1 / 1.52)
= 96.3178 ^ (1 / 1.52)
=
20.19 Jam

I. Interval Waktu Pemeriksaan Mesin Untuk Periode Waktu 3 Bulan


MTTF =

171.131 Jam
(7 hari 3 jam 13 menit)
= 1.52
=
270.04

Tanggal
11
18
25
1
8
15
22
29
5
12

Bulan
Desember
Desember
Desember
Januari
Januari
Januari
Januari
Januari
Februari
Februari

Tahun
2011
2011
2011
2012
2012
2012
2012
2012
2012
2012

03:13:00

Jam
00:00:00
03:13:00
06:26:00
09:39:00
12:52:00
16:05:00
19:18:00
22:31:00
01:44:00
04:57:00

19
26
4
11
18
25
1
8
15

Februari
Februari
Maret
Maret
Maret
Maret
April
Maret
Maret

2012
2012
2012
2012
2012
2012
2012
2012
2012

08:10:00
11:23:00
14:36:00
17:49:00
21:02:00
00:15:00
03:28:00
06:41:00
09:54:00

Zi
Mi

=LN(-LN(1-((ki-0.5)/(N+0.5))))
ZK+1 - ZK

10.65

F(ti)

(i-0.3)/(N+0.4)

tp (jam)
1
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350

D(tp)
0.008013
0.006469
0.005762
0.005404
0.005226
0.005153
0.005147
0.005187
0.005259
0.005354
0.005465
0.005587
0.005717
0.005851
0.005988
0.006124
0.006258
0.006390
0.006517
0.006639
0.006755
0.006865
0.006969
0.007066
0.007156
0.007240
0.007318
0.007389

1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
3000
3050
3100
3150
3200
3250
3300
3350

0.007455
0.007515
0.007570
0.007619
0.007665
0.007706
0.007743
0.007776
0.007806
0.007834
0.007858
0.007880
0.007900
0.007917
0.007933
0.007947
0.007960
0.007971
0.007981
0.007990
0.007998
0.008005
0.008012
0.008018
0.008023
0.008027
0.008031
0.008035
0.008038
0.008041
0.008043
0.008046
0.008048
0.008049
0.008051
0.008052
0.008054
0.008055
0.008056
0.008057

3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
4700
4750
4800
4850
4900
4950
5000

0.008057
0.008058
0.008059
0.008059
0.008060
0.008060
0.008060
0.008061
0.008061
0.008061
0.008062
0.008062
0.008062
0.008062
0.008062
0.008062
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063
0.008063

0.10536
0.10536

28.4519

0.22314
60.2585

0.35667
96.3178

7.130441
168
3.13

4.2.2 Waktu Reparasi


A. Perhitungan Distribusi Weibull Untuk Waktu Reparasi
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Rank Umur (ti) Xi = Ln ti


1.12
0.11
1.22
0.20
1.22
0.20
1.23
0.21
1.27
0.24
1.37
0.31
1.38
0.32
1.40
0.34
1.55
0.44
1.57
0.45
1.58
0.46
1.65
0.50
1.75
0.56
1.78
0.58
1.78
0.58
1.82
0.60
1.93
0.66
2.10
0.74
2.20
0.79
2.25
0.81
2.25
0.81
2.37
0.86
2.37
0.86
2.40
0.88
2.40
0.88
2.60
0.96
2.77
1.02
2.78
1.02
2.92
1.07
2.92
1.07
Total

Zi
-4.10
-2.99
-2.46
-2.10
-1.83
-1.62
-1.43
-1.27
-1.12
-0.99
-0.86
-0.75
-0.64
-0.54
-0.44
-0.34
-0.25
-0.16
-0.07
0.02
0.11
0.20
0.29
0.39
0.49
0.59
0.71
0.84
1.00
1.23

Mi
1.12
0.53
0.35
0.27
0.22
0.19
0.16
0.15
0.13
0.12
0.11
0.11
0.10
0.10
0.10
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.10
0.10
0.11
0.12
0.13
0.16
0.23
0.00
5.33

Ln (ti+1) - Ln (ti) (Ln (ti+1) - Ln (ti))/Mi


0.09
0.08
0.00
0.00
0.01
0.04
0.03
0.10
0.08
0.35
0.01
0.06
0.01
0.07
0.10
0.70
0.01
0.08
0.01
0.09
0.04
0.36
0.06
0.54
0.02
0.18
0.00
0.00
0.02
0.19
0.06
0.67
0.08
0.91
0.05
0.52
0.02
0.25
0.00
0.00
0.05
0.56
0.00
0.00
0.01
0.15
0.00
0.00
0.08
0.75
0.06
0.53
0.01
0.05
0.05
0.29
0.00
0.00
0.00
0.00
0.96
7.52

B. Pengujian Kecocokan Distribusi / Pengujian Mann's Test

K
K

r
30

2
2
r 1
29

2
2

r
K1

K2
M

r 1

15

k1
M

14.5

ln t i 1 ln t i
Mi
ln t i 1 ln t i
Mi

k2

i 1

( 15 * 4 . 88 )

( 14 . 5 * 7 . 52 )

30
15
14.5
0.67

Numerator = 2 * K2 = 2 * 14.5 =
Denominator = 2 * K1 = 2 * 15 =

i r / 2 1
r 1

29
30

Syarat :
Hi = Komponen Berdistribusi Weibull
Ho = Kompenen Tidak Berdistribusi Weibull
Jika M < F, maka terima Ho dan tolak Hi ; Maka Komponen Berdistribusi Weibull
Jika M > F, maka tolak Ho dan terima Hi ; Maka Komponen Tidak Berdistribusi Weibull

0.67

=
=

F ; K1 ; K 2 F0.05;15.;14.5

0.67
2.46

Kesimpulan : F (2.46) > M (0.67), terima Ho dan Tolak Hi, sehingga dapat disimpulkan
bahwa komponen berdistribusi Weibull
C. Perhitungan Plot Weibull Waktu Operasional
i
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

ti
B
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

Xi = Ln ti
C
0.11
0.20
0.20
0.21
0.24
0.31
0.32
0.34
0.44
0.45
0.46
0.50
0.56
0.58
0.58
0.60
0.66
0.74
0.79
0.81
0.81
0.86
0.86
0.88
0.88
0.96
1.02
1.02
1.07
1.07

F (ti)
D
0.02
0.06
0.09
0.12
0.15
0.19
0.22
0.25
0.29
0.32
0.35
0.38
0.42
0.45
0.48
0.52
0.55
0.58
0.62
0.65
0.68
0.71
0.75
0.78
0.81
0.85
0.88
0.91
0.94
0.98

1 / {1-F(ti)}
E
1.02
1.06
1.10
1.14
1.18
1.23
1.28
1.34
1.40
1.47
1.54
1.63
1.72
1.82
1.94
2.07
2.22
2.39
2.60
2.84
3.13
3.49
3.95
4.54
5.33
6.47
8.22
11.26
17.88
43.43

Ln (E)
F
0.02
0.06
0.09
0.13
0.17
0.21
0.25
0.29
0.34
0.38
0.43
0.49
0.54
0.60
0.66
0.73
0.80
0.87
0.95
1.04
1.14
1.25
1.37
1.51
1.67
1.87
2.11
2.42
2.88
3.77

Plot Weibull
Plot Weibull
2.00
1.00

Yi

0.00
-1.00 0

10

15

20

-2.00
-3.00
-4.00
-5.00
Xi

25

30

35

Yi = ln (F)
G
-3.76
-2.86
-2.38
-2.04
-1.78
-1.57
-1.39
-1.23
-1.09
-0.96
-0.84
-0.72
-0.61
-0.51
-0.41
-0.32
-0.23
-0.14
-0.05
0.04
0.13
0.22
0.32
0.41
0.52
0.62
0.74
0.88
1.06
1.33

D. Tabel Parameter Weibull dari Waktu Operasional Komponen


i
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Xi
0.11
0.20
0.20
0.21
0.24
0.31
0.32
0.34
0.44
0.45
0.46
0.50
0.56
0.58
0.58
0.60
0.66
0.74
0.79
0.81
0.81
0.86
0.86
0.88
0.88
0.96
1.02
1.02
1.07
1.07
18.51

Yi
-3.76
-2.86
-2.38
-2.04
-1.78
-1.57
-1.39
-1.23
-1.09
-0.96
-0.84
-0.72
-0.61
-0.51
-0.41
-0.32
-0.23
-0.14
-0.05
0.04
0.13
0.22
0.32
0.41
0.52
0.62
0.74
0.88
1.06
1.33
-16.59

n X i Yi X i Yi
n X i X i

=
=

exp( a / b)

MTTR =

Xi
0.01
0.04
0.04
0.04
0.06
0.10
0.11
0.11
0.19
0.20
0.21
0.25
0.31
0.33
0.33
0.36
0.43
0.55
0.62
0.66
0.66
0.74
0.74
0.77
0.77
0.91
1.04
1.05
1.15
1.15
13.93

(30 * (-0.42)) - (18.51 * (-16.59))


(30 * 13.93) - (18.51 ^2)
3.91

=
=

((-16.59) / 30) - (3.91 * (18.51 / 30 ))


-2.96

=
=

Exp ( -( -2.96)/3.91 )
2.13

Xi*Yi
-0.41
-0.56
-0.47
-0.43
-0.42
-0.49
-0.45
-0.41
-0.48
-0.43
-0.38
-0.36
-0.34
-0.30
-0.24
-0.19
-0.15
-0.10
-0.04
0.04
0.11
0.19
0.27
0.36
0.45
0.60
0.76
0.91
1.13
1.42
-0.42

=
=

( 1 + (1 / ) = ( 1 + ( 1 / 3.91 )) =
Berdasarkan Tabel
= 0.611241

3.91
2.13 * 0.6112
1.30
Jam
1.26

E. Tabel Hasil Perhitungan Fungsi Distribusi Kumulatif,


Fungsi Kepadatan Kemungkinan, Fungsi Keandalan dan Fungsi Laju
Kerusakan Pada Waktu Reparasi Pada Mata Bor
t
1.12
1.22
1.22
1.23
1.27
1.37
1.38
1.40
1.55
1.57
1.58
1.65
1.75
1.78
1.78
1.82
1.93
2.10
2.20
2.25
2.25
2.37
2.37
2.40
2.40
2.60
2.77
2.78
2.92
2.92

R (t)
0.92
0.89
0.89
0.89
0.88
0.84
0.83
0.83
0.75
0.74
0.73
0.69
0.63
0.61
0.61
0.59
0.51
0.39
0.32
0.29
0.29
0.22
0.22
0.21
0.21
0.12
0.06
0.06
0.03
0.03

F (t)
0.08
0.11
0.11
0.11
0.12
0.16
0.17
0.17
0.25
0.26
0.27
0.31
0.37
0.39
0.39
0.41
0.49
0.61
0.68
0.71
0.71
0.78
0.78
0.79
0.79
0.88
0.94
0.94
0.97
0.97

f (t)
0.257
0.319
0.319
0.330
0.352
0.420
0.431
0.443
0.542
0.552
0.563
0.601
0.649
0.662
0.662
0.673
0.696
0.684
0.649
0.625
0.625
0.554
0.554
0.530
0.530
0.374
0.247
0.236
0.153
0.153

Fungsi Distribusi Kumulatif Waktu Reparasi :

t
F t 1 Exp

Fungsi Kepadatan Kemungkinan Waktu Reparasi :
f t

t
Exp

Fungsi Keandalan Waktu Reparasi :


t
Rt Exp

Fungsi Laju Kerusakan :

ht

h (t)
0.278
0.357
0.357
0.371
0.401
0.500
0.518
0.537
0.722
0.744
0.768
0.866
1.027
1.085
1.085
1.145
1.373
1.746
1.999
2.134
2.134
2.473
2.473
2.575
2.575
3.251
3.895
3.964
4.542
4.542

ht

Grafik

R (t)

Kurva Fungsi Keandalan Waktu Reparasi


1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00

t (jam)

f (t)

Kurva Fungsi Kepadatan Kemungkinan Waktu Reparasi

0.800
0.700
0.600
0.500
0.400
0.300
0.200
0.100
0.000

t (jam)

Kurva Fungsi Distribusi Kumulatif Waktu Reparasi


1.20
1.00
F (t)

0.80
0.60
0.40

0.20
0.00

t (jam)

h (t)

Kurva Laju Kerusakan Waktu Reparasi


5.000
4.500
4.000
3.500
3.000
2.500
2.000
1.500
1.000
0.500
0.000

h (t)

t (jam)

4.88

F(ti)