MINUTES OF MEETING

Minutes of meeting held between M/s Elsytec Engineers and Consultant Pvt Ltd and M/s Sun Flag Iron and Steel Co Ltd dated on 26/12/2011 at Bhandara, Maharastra

Members Present

M/s Elsytec
Mr. K.Dhandayuthabani Mr. V.Sathish Mr. K.Makesh Mr.T.Arun Kumar

M/s Sun Flag


Mr. Chandrakant Moharil (P Manager) Mr. Priyank

M/s Elsytec Engineers reached the site on 13/12/2011 with necessary testing equipment for pre-Commissioning testing on 33KV HT Panel, Transformer and Cable High voltage test List of tested accessory are given in Annexure I & II After completion the test M/s Elsytec Engineers Relieve the site on 27/12/2011 with the testing equipment

M/s Elsytec

M/s Sun Flag

Annexure I

LIST OF PRE-COMISSIONING TESTS ARE CONDUCTED: 1. Transformer: a. b. c. d. e. f. g. 2. VCB Panel a. b. c. d. e. f. g. 3. Cable a. b. IR Value test High Voltage test Scheme Check IR Value Test Relay Testing CT/PT Testing CB Timing Test Functional test Panel Bus bar testing Visual checks IR Test Ratio Test Magnetizing Current Winding Resistance Vector group test Magnetizing balance test

M/s Elsytec

M/s Sun Flag

ANEXURE II 1. Panels
a. b. c. d. e. f. g. 33 KV VCB Incomer from MRSS, Make Siemens 33 KV VCB O/G to 2 MVA TRF, Make Siemens 33KV VCB O/G to 4 MVA TRF, Make Siemens 33 KV VCB O/G to 4.5 MVA TRF, Make Siemens 33KV VCB O/G to Capacitor Bank, Make Siemens 33 KV Bus PT Panel, Make Siemens 33 KV SF6 Breaker Panel, Make ABB Qty 1 no 2nos 1no 1no 1no 1no 1no

2. Cable
a. 33 KV Single core cable b. 33 KV Three core cable 6 run 4 run

3. Transformer
a. 2 MVA Trf b. 4 MVA Trf c. 4.5 MVA Trf 2no 1no 1no