Professional Documents
Culture Documents
Book 1
Book 1
Book 1
reboiler
compressor
item
CdiC
CR 2.1
CR 2.6
duty kW
1193
679.12
674.29
area m2
107.97
61.46
61.02
CW required ton/yr 632028.64
### 357201.31
Cost of WC ton/yr
37921.72 21585.65
214432
duty of R1 kW
1546.72
919.3
848.15
area of R1 kW
103.12
61.29
56.54
steam required ton/yr 20786.46 12354.6
11398.42
duty required kW
0
0
0
duty of R2 kW
0
0
0
cost of Steam $/yr 353369.81 210027.7 193773.11
duty Comp1 kW
0
98.51
130.25
duty Comp2 kW
0
0
0
cost of electricity $/yr
0 73456.7
97119.4
energy savings %
0.00% 21.46%
19.90%
energy cost $/yr
391291.5
### 312324.57
energy cost savings %
0.00% 22.04%
20.18%
8
area of internal HE m2
0
10.63
6.5
Payback Period
Years
Payback Time yr
TAC $/yr
7
6
5
4
3
2
1
CR0.07
2.1
0
###
1
CR 2.6
7.48
###
0.00%
6.75
813101.88
3.56%
item
steam
CR 3.1cooling water
int HIDiC1
int HIDiC 2
electricity
Scheme
7.12
813685.45
3.49%
Energy Savings
80.00%
60.00%
40.00%
20.00%
0.00%
CR 2.1
CR 2.6
CR 3.1
int HIDiC1
int
Compressor Duty
2
2.31
### 663250.79
24.98%
21.33%
250
200
###
Duty (kWh)
riod
CR 3.1
int HIDiC1int HIDiC 2
670.24
0
0
60.66
0
0
355056.93
0
0
21303.42
0
0
778.38
180.2
44.18
51.9
12.01
2.95
10460.77
2421.6
593.76
0
0
0
0
78.62
94.59
177833 41166.8 10093.85
160.72
130.25
214.47
0
10.15
0
119844.38
### 159924.27
18.50% 61.12%
55.54%
318980
### 170018.12
18.48% 62.73%
56.55%
5.13
6.5
4.8
value
$17/ton
$0.06/ton
int HIDiC1
int HIDiC 2
$0.084/kWh
150
100
50
CR 2.1
CR 2.6
CR 3.1
Duty (kWh)
Reboiler Duty
1600
1400
1200
1000
800
600
400
200
CdiC
CR 2.1
CR 2.6
CR 3.1
int HIDiC1
int HIDiC 2
int HIDiC1
int HIDiC
Duty
400
200
CdiC
CR 2.1
CR 2.6
CR 3.1
int HIDiC1
int HIDiC 2
gy Savings
CR 3.1
int HIDiC1
int HIDiC 2
ssor Duty
CR 3.1
int HIDiC1
int HIDiC 2