Daily Site Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ASIAN PLANTATIONS MILLING SDN BHD DAILY SITE REPORT

Date: Day: WEATHER TRACKING LOG (TICK) Rain (work stopped) Fine Drizzling DETAILS OF RAIN AND WORK STOPPAGES Rain (Time) Work Stoppages No. of hours To No Yes

Time: 5.00-6.00 6.00-7.00 7.00-8.00 8.00-9.00 9.00-10.00 10.00-11.00 11.00-12.00 12.00-13.00 13.00-14.00 14.00-15.00 15.00-16.00 16.00-17.00 17.00-18.00 18.00-19.00 19.00-20.00 20.00-21.00 21.00-22.00 22.00-23.00 23.00-24.00 SITE REPORT & DESCRIPTION OF DAILY ACTIVITIES

From

Contractor Work Hours (Normal) Start of Work: End of Work:

Machinery Total # # Running # Breakdown Excavator Bulldozer Compactor Lorry Genset Skid tank Doble cab Single cab Water pump Backhoe Motorgrader Other contractor machinery or assets on site:

Manpower Site Manager Site Engineer Surveyor Supervisor Foreman Mechanic Security Welder Electrician General worker Other

Total #

CONFIRMED & AGREED BY: APM Site Representative ____________ Contractor Representative ____________ Terapan Dinamik (M) Sdn Bhd