PH9-0B-14-12-R101 - Rev.B Part.1
PH9-0B-14-12-R101 - Rev.B Part.1
ENERGOPROJEKT-ENTEL Qatar Branch Office TEL : (974) 4447 8571; 4447 7321 FAX : (974) 4447 8572
SUBSTATION NAME / CIRCUIT NAME PROJECT DRAWING NUMBER
PH9-0B-14-12-R101
B A 1 0 REV. B B C STAT.
RE-ISSUE FOR CONSTRUCTION AS PER DTA-11-0719 ISSUE FOR CONSTRUCTION RE-ISSUED AS PER PH9-EPE-0B-DTA-10-0947 ISSUED FOR COMMENT MODIFICATION
CONTRACTOR NAME
HYOSUNG
MANUFACTURE DRAWING NUMBER DATE DRAWN CHECK. APPRO. 02-12-10 02-12-10 03-12-10 NAME S.K.C D.I.K H.M.L SCALE NONE
SIGNATURE
132/66/11kV Khore South Substation 132kV Gas Insulated Switchgear(GIS) Factory Acceptance Test Report
A4
SIZE
SHEET
01
OF
537
SHEETS
B
REV.
DOC NO.
PH9-0B-14-12-R101
TITLE
FAT REPORT
Rev.
TABLE OF CONTENTS Item 1. Factory Acceptance Test Report - Bay Name: Semaisma No.2 (C40) 2. Routine test report - Bay Name: Bus Section (C12) - Bay Name: Semiama No.1 (C30) - Bay Name: T1 (C11) - Bay Name: T2 (C21) - Bay Name: Umm Birka Super No.1 (C10) - Bay Name: Umm Birka Super No.1 (C20) 3. GIS Internal UHF Partial Discharge Sensor Test Report Description Page 3~109 3~109 110~473 110~169 170~232 233~290 291~348 349~411 412~474 475~537
PAGE 2