THIS SUBMISSION IS DECLARED TO BE STRICTLY IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT SIGNATURE :

QATAR TRANSMISSION SYSTEM EXPANSION PHASE IX CONTRACT No. GTC/240B/2008

ENERGOPROJEKT-ENTEL Qatar Branch Office TEL : (974) 4447 8571; 4447 7321 FAX : (974) 4447 8572
SUBSTATION NAME / CIRCUIT NAME PROJECT DRAWING NUMBER

132/66/11kV Khore South Substation

PH9-0B-14-12-R101

B A 1 0 REV. B B C STAT.

25-05-11 22-02-11 04-01-11 04-12-10 DATE

RE-ISSUE FOR CONSTRUCTION AS PER DTA-11-0719 ISSUE FOR CONSTRUCTION RE-ISSUED AS PER PH9-EPE-0B-DTA-10-0947 ISSUED FOR COMMENT MODIFICATION

S.K.C S.K.C S.K.C S.K.C DRAWN

D.I.K D.I.K D.I.K D.I.K CHECK.

H.M.L H.M.L H.M.L H.M.L APPRO.

CONTRACTOR NAME

450, Gongdeok-Dong, Mapo-Gu, Seoul, Korea 121-720


SUB CONTRACTOR : DRAWING/DOCUMENT TITLE

HYOSUNG
MANUFACTURE DRAWING NUMBER DATE DRAWN CHECK. APPRO. 02-12-10 02-12-10 03-12-10 NAME S.K.C D.I.K H.M.L SCALE NONE
SIGNATURE

132/66/11kV Khore South Substation 132kV Gas Insulated Switchgear(GIS) Factory Acceptance Test Report

A4
SIZE

SHEET

01

OF

537

SHEETS

B
REV.

(Incl. this cover page)

DOC NO.

PH9-0B-14-12-R101

TITLE

FAT REPORT

Rev.

TABLE OF CONTENTS Item 1. Factory Acceptance Test Report - Bay Name: Semaisma No.2 (C40) 2. Routine test report - Bay Name: Bus Section (C12) - Bay Name: Semiama No.1 (C30) - Bay Name: T1 (C11) - Bay Name: T2 (C21) - Bay Name: Umm Birka Super No.1 (C10) - Bay Name: Umm Birka Super No.1 (C20) 3. GIS Internal UHF Partial Discharge Sensor Test Report Description Page 3~109 3~109 110~473 110~169 170~232 233~290 291~348 349~411 412~474 475~537