Cover

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

UNIVERSITI TEKNOLOGI MARA BACKGROUND PROJECT FOR CADASTRAL SURVEY CADASTRAL SURVEY (SUBDIVISION TITLE) FIELD SCHEME 1 SUG

595

PROJECT NAME

SUBDIVISION FOR BOUNDARY LOT, PANTAI KLEBANG, MELAKA


PROJECT LOCATION

KLEBANG BESAR, MELAKA


GROUP MEMBER

Hazellary Tarang Muhammad Yasin Bin Moh Mohd Ali Karomi Bin Sholihin @ Salihin Suhaimi Bin Asbanni Noor Syafiqah Bt Che Omar Norhidayah Bt Mat Nasir Intan Fara Zila Bt Isa Nadzirah Bt Mansoor Noranizah Bt Thani @ Johny

2010414852 2010275722 2010666266 2009182221 2010841934 2010694652 2010693904 2010431268 2009979447

VERIFY BY:

PROF. MADYA SR. HJ.MOHAMED NASRI HJ.MD RANI PROF. SR. ABD RAHMAN BIN ABD LATIF
DURATION:

9 - 21st June 2011

th

TABLE OF CONTENT
Contents Abstract Acknowledgment Table of Content CHAPTER 1: INTRODUCTION Page

1.1 Introduction 1.2 Cadastral Surveying 1.3 Project Background 1.3.1 Title of the project 1.3.2 Aim 1.3.3 Objectives 1.3.4 Location 1.4 Overall methodology CHAPTER 2: LITERATURE REVIEW 2.1 Introduction 2.2 Field To Finish Concept 2.2.1 Total Station Survey System (TSSS) 2.2.2 District Survey Department Automation System (DSDAS) 2.2.3 Cadastral Data Management System (CDMS) 2.2.4 Modernization of JUPEM 2.2.5 Title Survey Module (TSM) 2.3 Requirement and permissible error 2.3.1 2.3.2 2.3.3 Maximum Misclosure Datum Baseline 2.3.3.1 2.3.3.2 Purpose Baseline Characteristics of Baseline

2.3.4 2.3.5 2.3.6 2.3.7 2.4.1

Third Mark 2.3.4.1 Correction Connection Line Check Angle Minimizing Error in Sun Observation Purpose Third Mark

2.4 Solar Observation 2.5 Instrument Calibration 2.5.1 2.5.2 2.5.3 2.6 Traverse 2.6.1 2.6.2 2.7.1 2.7.2 Closed Traverse Open Traverse Conditions for Approval Marking Boundary Mark 2.7.2.1 2.7.2.2 2.7.2.3 2.7.2.4 2.8 Certified Plan 2.8.1 Information needs to be shown in CP Method of Marking Boundary Mark Distance Between Boundary Mark Bearing and Angle Observation Distance Observation Differential Field Test Daily Check Calibration

2.7 Subdivision

CHAPTER 3 : METHODOLOGY

CHAPTER 4 : RESULT AND ANALYSIS 4.1 Introduction 4.2 Datum 4.3 Differential Field Test 4.4 Solar Observation

4.5 Traverse angular misclosure & c Correction


4.5.1 Linear misclosure

CHAPTER 5 : CONCLUSION 5.1 Introduction 5.2 Conclusion 5.3 Problem statement and Recommendation

REFERENCE INDIVIDUAL COMMENT

You might also like