Professional Documents
Culture Documents
PT Calculation
PT Calculation
PT Calculation
PROJECT: 2x500 MW TUTICORIN POWER PROJECT PACKAGE: TA5 DESALINATON PLANT & WATER TREATMENT PLANT CLIENT: NLC-TAMIL NADU POWER LIMITED (NTPL) CONSULTANT: MECON LIMITED, BANGALORE DOCUMENT: SIZING CALCULATIONS FOR STILLING CHAMBER, FLASH MIXER, FLOCCULATOR TANK REV.0 DATE: 23.03.2011 DOCUMENT: NO: NTPL-TEC-TA5-P-271-039
1 2
Design flow rate to each pretreatment unit from the feed pump Stilling chamber Retention Time Volume Required Height Provided Area required Size Provided Area Provided Hence size provided is OK.
(Q)
= 1820 m3/h
Flash Mixer Retention Time Volume Required Height Provided Area required Size Provided Area Provided Hence size provided is OK.
Flocculator Retention Time Volume Required Height Provided Area required Size Provided Area Provided Hence size provided is OK.
= 15 Min = (1820 x 15) / 60 =455 m3 = 4.65 m = (455 / 4.65) = 97.85 m2 = 14m L x 7m W =98 m2
Prepared by
Checked by
Approved by