Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Production: Projected Visuals Length: 6.

00 seconds Location: Nottingham, Waverly Studios Account # 001 002 003 004 005 006 007 008 009 010 Category Travel Hotel & Lodging Food Camera Lighting Sound Locations Art Dept Petty Cash Editing Specifics

Budget Draft Date: Shooting Dates: 13/112011

2/1/2012

Sheet # 1 Page # 1

Kit, Crew, Expendables Kit, Crew, Expendables Kit, Crew, Accessories Fees & Permits Props, Wardrobe etc.

022 Final Post Online 023 Final Post Mix

Conform, Color Correction, etc. Sound mixing session

Cost w/Tax Budget 10.00 5.00 10.00 0.00 0.00 0.00 5.00 5.00 5.00 17.00 N/A 30.00 Free Free Free Free Free Free Free Free Free 10.00 50.00 5.00 5.00 5.00 0.00 0.00 0.00 PRODUCTION TOTAL: 100.00 0.00 0.00 0.00 10.00 POST PRODUCTION TOTAL: 75.00 GRAND TOTAL ESTIMATE: GRAND TOTAL BUDGET: ACTUAL GRAND TOTAL:

Actual Cost

Free Free Free

45.00 110.00

You might also like