Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Six Sigma Business Excellence

07 Catapult DOE
2006 American Society for Quality. All Rights Reserved. Recognize Define Measure Analyze Improve Control

DOE: Catapult Exercise

Plan your strategy. Each team has 40 shots (not including the shoot-off) Create a Process Map for the Catapult Prepare and execute a Gage R&R Perform one or more DoEs to create a prediction equation Prepare a lessons learned presentation Compete with other teams to determine which team has developed the best catapult model.

Measure

Analyze

Improve

Control
Page 2

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

Catapult Optimization Exercise


The Army Corps of Engineers has designed a new catapult. Your team must demonstrate that you can accurately launch the projectile into a castle that could appear anywhere from 30 to 120 from the front of the catapult. The castle will be ~ 12X12X8 inches. The queens throne will be ~ 3 inches in diameter and be located within the castle. This is a competition between several teams for a prize!
Measure Analyze Improve Control
Page 3

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

Catapult Exercise: Setup


A Typical Catapult Set-up

Measure

Analyze

Improve

Control
Page 4

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

Catapult Shoot-off
Each team will take 9 shots at randomly generated distances. Three shots will be between 30 and 59 inches, three between 60 and 89 inches and three between 90 and 120 inches from the front of the catapult. Points will be awarded as follows: One point for hitting the castle on the fly Three points for going into the castle on the fly Five points for going in the queens throne

Measure

Analyze

Improve

Control
Page 5

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

Catapult Exercise: Deliverables


Be Prepared to Discuss Each of the Following: 1. Approach 2. Gage R&R 3. DoE strategy 4. Lessons learned

Measure

Analyze

Improve

Control
Page 6

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

Good Luck!

Measure

Analyze

Improve

Control
Page 7

Catapult DOE, Version 7.5

2006 American Society for Quality.


All Rights Reserved.

You might also like