Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

ALI AMIN RAMADHAN TRADING CO.

LLC
PROJECT:EXTN. OF RADIOLOGY AND OPERATION THEATRE CONTRACT NO. : PD 02/12 (TENDER NO. 234/2010)

DAILY REPORT
To: The Resident Engineer Report No. 01/02/12 Date:13/02/2012 Ambient Temperature : Weather Bright Sun Raining Clear Sky xxxxx Dusty Over Cast Windy

Man Power
Management / Supervision Personnal and Staff 1 Project Manager 2 Project Engineer 3 Site Engineers 4 Supervisors 5 Fore men 6 Store Keeper 7 Office Boy 8 Operators/ Drivers 9 Quality Controller 10 Safety Officer 1 1 2 1 1 1 1 1 0 1 Construction Equipments And Vehicles 1 Wood Cutting Machine 2 Steel Cutting Machine 3 Steel Bending Machine 4 JCB / Showel 5 Roller Compactor 6 Vibrators 7 Pick up 8 Dumper 9 Theodolite 10 Dumpy level 11 Plate Compactor 12 Mixer Machine Total Material Delivered At Site 1 solid block work 2 18mm filim coated ply wood 3 4 5 6 7 2 2 0 0 0 3 1 1 1 1 1 1

Total Workers 1 2 3 4 5 6 7

10 No.s 2 19 8 5 0 0 2

13
Qty. 750 50

Charge Hands Carpenter Steel Fixer Masons Helpers Helpers (Omani) Electrician / plumber

Work In Progress 1 Block work for plinth proection 2 bitumeen paint for block of plith protewction 3 back filling for foundation excavated area. 4 Re-bar fixing work for column. 5 6 7 8 9 Delay / Disruption Waiting for details of service buiding and chiller compound

P.K.Kathiresan
Project Engineer / Project Manager ( AART)

RESIDENT ENGINEER (A MEC A

You might also like