Subject: Continuous overloading of the unit-01 and-02.

It is observed that unit-01 and 02 are frequently being operated load more than 308 MW for longer duration of time like 3 to 4 hours in a day. This type of frequent continuous operation of overload is detrimental to reliability of operation and affect the life of machine. It is also observed that despite giving warnings to desk engineer about abnormal parameters, these warnings are ignored and machine load not reduced to 100% TMCR. Machines are designed to run at 300 MW on continuous basis. So it is requested to instruct the desk engineer to operate the units at 300MW on continuous basis.

Unit-01 tripping on 01.11.2008 Time 17:27 17:52 17:53 17:58 18:03 18:40 Guns taken in service Unit tripped on MFT [drum level low low] Unit light up with AB-1 and 3 guns taken in service. AB-2 and 4 guns taken in service. CD-1 and 3 guns taken in service. EF-2 and 4 guns taken in service. CD-2 gun taken in service.