RENCANA ANGGARAN BIAYA

Pekerjaan
Lokasi
Tahun Anggaran

:
:
:

Pembangunan Masjid Pondok Pesantren Sabilul Huda


Jalan Kaliurang Km 17 Sukunan RT.05/RW.22 Pakembinangun Sleman Yogyakarta
2010

No

JENIS PEKERJAAN

SATUAN

VOLUME

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

6 = (4 x5)

A.

PEKERJAAN PERSIAPAN
JUMLAH

B.

PEKERJAAN TANAH DAN PASIR


1.
2.
3.
4.

C.

Galian Tanah Pondasi foot plat


Urugan Tanah Kembali
Urugan Pasir dibawah pondasi footplat
Urugan Pasir dibawah Conblock
JUMLAH

m3
m3
m3
m3

33,600
9,510
2,040
15,400

21.040,00
7.672,00
106.840,00
106.840,00

706.944,00
72.960,72
217.953,60
1.645.336,00
2.020.410,32

m2
m2
m2
m'

136,50
220,000
1,8000
78,000

65.000,00
25.354,00
33.530,00
6.347,00

8.872.500,00
5.577.880,00
60.354,00
495.066,00
15.005.800,00

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

0,300
1,400
4,140
6,399
3,105
0,840
1,800
0,886
0,801
0,126
0,794
0,180
0,126
1,080
0,060
0,414

568.708,00
4.118.603,00
4.731.528,00
4.806.858,00
6.609.845,00
4.981.278,00
27.000,00
27.000,00
6.378.038,00
6.378.038,00
3.794.358,00
4.981.278,00
27.000,00
27.000,00
4.731.528,00
4.118.603,00

170.612,40
5.766.044,20
19.588.525,92
30.759.084,34
20.523.568,73
4.184.273,52
48.600,00
23.911,20
5.108.808,44
803.632,79
3.011.961,38
896.630,04
3.402,00
29.160,00
283.891,68
1.705.101,64
92.907.208,28

m3
m3

0,198
0,337

5.100.000,00
5.100.000,00

1.010.534,40
1.720.699,20

PEKERJAAN PASANGAN DAN PLESTERAN


1.
2.
3.
4.

D.

Pas. Dinding bata merah 1Pc : 3Ps


Plesteran Dinding bata merah 1Pc : 3Ps
Plesteran lisplank beton 1Pc : 2Ps
Sponengan 1Pc : 2Ps
JUMLAH
PEKERJAAN KONSTRUKSI BETON BERTULANG

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

E.

Lantai kerja 1Pc : 3Ps : 5 Kr t = 5 cm


Foot plate 1.00x1.50 1Pc : 2Ps : 3Kr
Sloof 20/30 1Pc : 2Ps : 3Kr
Kolom 30/50 1Pc : 2Ps : 3Kr
Ringbalk 15/30 1Pc : 2 Ps : 3 Kr
Balok lantai anak 20/30
Plat Dagg 1PC : 2Ps : 3 Kr t = 12 cm
Lisplank plat beton tbl 8 cm
Kolom 15/15 Ruangan lt 2 1Pc : 2Ps : 3Kr
Balok 15/15 Gunungan 1Pc : 2Ps : 3Kr
Balok 15/20 Gunungan 1Pc : 2Ps : 3Kr
Balok Tangga 20/30 1Pc : 2Ps : 3Kr
Plat Bordes tangga 1PC : 2Ps : 3 Kr t = 12 cm
Tangga 1Pc : 2Ps : 3Kr
Sloof Tangga 20/30 1Pc : 2Ps : 3Kr
Foot plate tangga 1Pc : 2Ps : 3Kr
JUMLAH
PEKERJAAN PINTU DAN JENDELA

1.
2.

Pasang kusen pintu P.1


Pasang kusen pintu P.J

1|Lampiran

3.
4.
5.
6.
7.
8.
9.

F.

Pasang kusen jendela J.1


Pasang kusen Kusen Boven KM/WC
Pasang kusen Kusen Boven atas
Pasang daun pintu panil P.1
Pasang daun pintu panil P.J
Pasang daun Jendela P.J r
Pasang boven jalusi kayu Bengkirai
JUMLAH

m3
m3
m3
m2
m2
m2
m2

0,749
0,077
0,077
2,800
4,800
2,400
2,640

5.100.000,00
5.100.000,00
5.100.000,00
392.232,00
392.232,00
328.116,00
461.298,00

3.820.348,80
393.638,40
393.638,40
1.098.249,60
1.882.713,60
787.478,40
1.217.826,72
12.325.127,52

m3
m3
m3
m'
m'
m2
m'

0,876
1,181
0,101
0,160
0,056
196,00
14,0000

6.761.725,00
6.287.887,50
6.287.887,50
42.007,84
42.007,84
44.955,00
44.955,00

5.920.025,47
7.424.737,56
633.819,06
6.721,25
2.352,44
8.811.180,00
629.370,00
23.428.205,79

PEKERJAAN RANGKA ATAP DAN ATAP


1.
2.
3.
4.
5.
6.
7.

G.

Kuda2 Kayu
Gording 6/12 kayu Kruing
Jurai 6/12 kayu Bangkirai
Listplank 2/20 kayu Kruing
Pasang Ruiter 2/20 kayu Kruing
Genteng
Bumbungan Genteng
JUMLAH
PEKERJAAN PLAFOND

1.

List Tepi langit-langit plepet eternit

m'

46,000

28.553,92

1.313.480,32

2.

Langit-langit eternit (1 x 1) m, tebal 3.5 mm, rangka kayu


Bengkirai datar

m2

108,000

104.259,60

11.260.036,80

JUMLAH
H.

12.573.517,12

PEKERJAAN LANTAI
1.
2.

Pasang keramik lantai 30 x 30


Pasang plint keramik lantai 10 x 30

m2
m'

260,00
82,0000

86.000,00
11.072,03

22.360.000,00
907.906,05
23.267.906,05

m2

273,000

32.880,50

8.976.376,50

m2
m2

36,799
108,00
0

29.535,00
18.000,00

1.086.858,47
1.944.000,00
12.007.234,97

m2

9,240

74.370,00

687.178,80
687.178,80

titik
bh
bh
bh
bh
bh

20,000
10,000
6,000
4,000
3,000
3,000

44.310,00
104.500,00
154.500,00
67.000,00
94.500,00
109.500,00

886.200,00
1.045.000,00
927.000,00
268.000,00
283.500,00
328.500,00

JUMLAH
I.

PEKERJAAN CAT DAN FINISHING


1.
2.
3.

J.

Cat & plamir dinding + kolom + list beton 3 kali kualitas


Dulux
Cat & meni kayu 3 kali kualitas EMCO
Pengecatan Plafond 3 kali
JUMLAH
PEKERJAAN KACA

1.

Kaca Bening 5 mm
JUMLAH

K.

PEKERJAAN LISTRIK
1.
2.
3.
4.
5.
6.

Titik lampu SPLN fitting ulir warna muda+jaringan


Lampu SL 18 Watt ex. PHILIPS
Lampu TL Ganda 40 watt ex PHILIPS
Lampu Pijar 15 watt ex PHILIPS
Saklar TUNGGAL SPLN warna muda ex. Broco + jaringan
Saklar DOUBLE SPLN warna muda ex. Broco + jaringan

2|Lampiran

7.
8.
9.

L.

STOP Kontak SPLN warna muda ex. Broco+jaringan


MCB+Box sekring
Biaya pasang listrik baru
JUMLAH

titik
bh
Ls

4,000
1,000
1,000

89.500,00
46.850,00
1.750.000,00

358.000,00
46.850,00
1.750.000,00
5.893.050,00

bh
bh
bh
bh
bh
bh
bh

10,000
26,000
6,000
7,000
54,000
54,000
27,000

18.370,00
30.370,00
134.760,00
25.870,00
30.370,00
15.370,00
17.220,00

183.700,00
789.620,00
808.560,00
181.090,00
1.639.980,00
829.980,00
464.940,00
4.897.870,00

PEKERJAAN PENGGANTUNG PENGUNCI


1.
2.
3.
4.
5.
6.
7.

Grendel Pintu
Engsel Pintu
Slot Tanam Pintu
Handle Pintu
Engsel jendela
Grendel Jendela
Handle jendela
JUMLAH

3|Lampiran

JUMLAH TOTAL

205.013.508,84

JUMLAH DIBULATKAN

205.010.000,00

RENCANA ANGGARAN BIAYA


Pekerjaan
Lokasi
Tahun Anggaran

:
:
:

Pembangunan Asrama Santri Pondok Pesantren Sabilul Huda


Jalan Kaliurang Km 17 Sukunan RT.05/RW.22 Pakembinangun Sleman Yogyakarta
2010

No

JENIS PEKERJAAN

SATUAN

A.

VOLUME
4

HARGA
SATUAN (Rp)

JUMLAH HARGA
(Rp)

6 = (4 x5)

PEKERJAAN PERSIAPAN
1.
2.

B.

Persiapan ( pembrshn & buangan-kond )


Uitzet/ Pengukuran kembali, pasang bouwplank
JUMLAH

m2
m1

154,000
50,000

4.120,00
22.356,00

634.480,00
1.117.800,00
1.752.280,00

m3
m3
m3
m3
m3
m3
m3
m3

33,600
13,280
2,250
9,510
2,040
3,320
0,450
15,400

12.352,00
5.231,00
5.231,00
4.210,00
5.231,00
5.231,00
5.231,00
5.231,00

415.027,20
69.467,68
11.769,75
40.037,10
10.671,24
17.366,92
2.353,95
80.557,40
647.251,24

m3
m1
m2
m2
m2
m2
m2
m'

1,080
83,000
226,90
380,000
72,0000

78,000

101.350,00
18.203,00
60.350,00
18.203,00
18.203,00
21.030,00
21.030,00
4.210,00

109.458,00
1.510.849,00
13.693.415,00
6.917.140,00
1.310.616,00
2.801.196,00
37.854,00
328.380,00
26.708.908,00

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

0,750
7,950
4,140
0,270
10,665
0,548
3,105
0,270
14,940
4,020
18,480
0,886

558.808,00
2.784.395,00
3.154.805,00
2.530.025,00
3.205.025,00
4.008.525,00
4.365.483,00
2.530.025,00
4.583.465,00
3.321.305,00
27.000,00
27.000,00

419.106,00
22.135.940,25
13.060.892,70
683.106,75
34.181.591,63
2.197.072,55
13.554.824,72
683.106,75
68.476.967,10
13.351.646,10
498.960,00
23.911,20

PEKERJAAN TANAH DAN PASIR


1.
2.
3.
4.
5.
6.
7.
8.

C.

Galian Tanah Pondasi foot plat


Galian Tanah pasangan rollag
Galian Tanah pondasi batu bata KM/WC
Urugan Tanah Kembali
Urugan Pasir dibawah pondasi footplat
Urugan Pasir dibawah rollag balok sloof
Urugan Pasir dibawah pondasi batu bata
Urugan Pasir dibawah Conblock
JUMLAH
PEKERJAAN PASANGAN DAN PLESTERAN

1.
2.
3.
4.
5.
6.
7.
8.

D.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Pas. Pondasi Batu Bata 1Pc : 2Ps


Pas. Bata rollag 1Pc : 3Ps
Pas. Dinding bata merah 1Pc : 3Ps
Plesteran Dinding bata merah 1Pc : 3Ps
Plesteran Dinding bata merah 1Pc : 2Ps
Plesteran kolom beton 1Pc : 2Ps
Plesteran lisplank beton 1Pc : 2Ps
Sponengan 1Pc : 2Ps
JUMLAH

133,20
1,8000

PEKERJAAN KONSTRUKSI BETON BERTULANG


Lantai kerja 1Pc : 3Ps : 5 Kr t = 5 cm
Foot plate 1.00x1.50 1Pc : 2Ps : 3Kr
Sloof 20/30 1Pc : 2Ps : 3Kr
Sloof 15/20 KM/WC 1Pc : 2Ps : 3Kr
Kolom 30/50 1Pc : 2Ps : 3Kr
Kolom 15/15 KM/WC 1Pc : 2Ps : 3Kr
Ringbalk 15/30 1Pc : 2 Ps : 3 Kr
Ringbalk 15/20 KM/WC 1PC : 2 Ps : 3 Kr
Balok latei induk 30/60
Balok latei anak 20/30
Plat Dagg 1PC : 2Ps : 3 Kr t = 12 cm
Lisplank plat beton tbl 8 cm

4|Lampiran

13.
14.
15.
16.
17.
18.
19.
20.
21.

E.

Kolom 15/15 Ruangan lt 2 1Pc : 2Ps : 3Kr


Balok 15/15 Gunungan 1Pc : 2Ps : 3Kr
Balok 15/20 Gunungan 1Pc : 2Ps : 3Kr
Balok Konsul 15/30 1Pc : 2Ps : 3Kr
Balok Tangga 20/30 1Pc : 2Ps : 3Kr
Plat Bordes tangga 1PC : 2Ps : 3 Kr t = 12 cm
Tangga 1Pc : 2Ps : 3Kr
Sloof Tangga 20/30 1Pc : 2Ps : 3Kr
Foot plate tangga 1Pc : 2Ps : 3Kr
JUMLAH

m3
m3
m3
m3
m3
m3
m3
m3
m3

0,801
0,126
0,794
1,206
0,180
0,126
1,080
0,060
0,414

4.008.525,00
4.008.525,00
2.530.025,00
4.365.483,00
3.321.305,00
27.000,00
27.000,00
3.154.805,00
2.784.395,00

3.210.828,53
505.074,15
2.008.333,85
5.264.772,50
597.834,90
3.402,00
29.160,00
189.288,30
1.152.739,53
182.228.559,49

m3
m3
m3
m3
m3
m2
m2
m2
m2

0,198
0,337
0,583
0,077
0,077
5,600
7,200
4,200
4,800

5.100.000,00
5.100.000,00
5.100.000,00
5.100.000,00
5.100.000,00
312.148,00
312.148,00
288.074,00
341.172,00

1.010.534,40
1.720.699,20
2.971.382,40
393.638,40
393.638,40
1.748.028,80
2.247.465,60
1.209.910,80
1.637.625,60
13.332.923,60

m3
m3
m3
m'
m'
m2
m'

0,876
1,181
0,101
0,160
0,056
196,00
14,0000

4.357.305,00
3.997.467,50
3.997.467,50
32.397,76
32.397,76
44.955,00
44.955,00

3.814.907,67
4.720.209,62
402.944,72
5.183,64
1.814,27
8.811.180,00
629.370,00
18.385.609,94

PEKERJAAN PINTU DAN JENDELA


1.
2.
3.
4.
5.
6.
7.
8.
9.

F.

Pasang kusen pintu P.1


Pasang kusen pintu P.J
Pasang kusen jendela J.1
Pasang kusen Kusen Boven KM/WC
Pasang kusen Kusen Boven atas
Pasang daun pintu panil P.1
Pasang daun pintu panil P.J
Pasang daun Jendela P.J
Pasang boven jalusi
JUMLAH
PEKERJAAN RANGKA ATAP DAN ATAP

1.
2.
3.
4.
5.
6.
7.

G.

Kuda2 Kayu
Gording 6/12 kayu Kruing
Jurai 6/12 kayu Bangkirai
Listplank 2/20 kayu Kruing
Pasang Ruiter 2/20 kayu Kruing
Asbes gelombang Besar
Bubungan Asbes Gelombang besar
JUMLAH
PEKERJAAN PLAFOND

1.

List Tepi langit-langit plepet eternit

m'

46,000

23.748,88

1.092.448,48

2.

Langit-langit eternit (1 x 1) m, tebal 3.5 mm, rangka kayu


Bengkirai datar

m2

108,000

80.234,40

8.665.315,20

JUMLAH
H.

9.757.763,68

PEKERJAAN LANTAI
1.
2.
3.
4.

I.

Pasang keramik lantai 30 x 30


Pasang plint keramik lantai 10 x 30
Pasang keramik lantai KM/WC 20 x 20
Pasang keramik dinding KM/WC 20 x 25 h = 1,5 m
JUMLAH

m2
m'
m2
m2

154,000
82,000
9,000
36,000

92.140,00
11.072,03
82.117,60
81.646,40

14.189.560,00
907.906,05
739.058,40
2.939.270,40
18.775.794,85

m2

585,200

18.235,00

10.671.122,00

PEKERJAAN CAT DAN FINISHING


1.

Cat & plamir dinding + kolom + list beton 3 kali kualitas


Dulux

5|Lampiran

2.
3.

J.

Cat & meni kayu 3 kali kualitas EMCO


Pengecatan Plafond 3 kali Kualitas Dulux
JUMLAH

m2
m2

36,799
108,000

25.412,00
26.214,00

935.136,19
2.831.112,00
14.437.370,19

m2

9,240

74.370,00

687.178,80
687.178,80

bh
bh
bh
bh
bh
m'
m'
bh
bh
ls
bh

1,000
1,000
1,000
1,000
4,000
20,000
10,000
1,000
4,000
1,000
4,000

1.250.000,00
1.300.000,00
600.000,00
600.000,00
145.385,00
52.902,50
5.001,75
1.250.000,00
432.448,00
1.500.000,00
348.823,00

1.250.000,00
1.300.000,00
600.000,00
600.000,00
581.540,00
1.058.050,00
50.017,50
1.250.000,00
1.729.792,00
1.500.000,00
1.395.292,00
11.314.691,50

titik
bh
bh
bh
bh
bh
titik
bh
Ls

20,000
10,000
6,000
4,000
3,000
3,000
4,000
1,000
1,000

44.310,00
100.000,00
150.000,00
62.500,00
90.000,00
105.000,00
85.000,00
46.850,00
1.750.000,00

886.200,00
1.000.000,00
900.000,00
250.000,00
270.000,00
315.000,00
340.000,00
46.850,00
1.750.000,00
5.758.050,00

bh
bh
bh
bh
bh
bh
bh

10,000
26,000
6,000
7,000
54,000
54,000
27,000

18.370,00
30.370,00
134.760,00
25.870,00
30.370,00
15.370,00
17.220,00

183.700,00
789.620,00
808.560,00
181.090,00
1.639.980,00
829.980,00
464.940,00
4.897.870,00

PEKERJAAN KACA
1.

Kaca Bening 5 mm
JUMLAH

K.

PEKERJAAN SANITASI DAN DRAINASI

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

L.

Sumur Air bersih


Sumur Resapan air kotor sedalam 8 m
Tandon air kap 500 ltr merk "PENGUIN'
Pompa air jet pump merk "NATIONAL" + instalasi
Kran air 3/4 ex san ei
Pipa PVC dia. 3" air bekas ex Wavin
Pipa PVC dia. 3/4" air bersih ex Wavin
Septictank
Closet jongkok ex KIA
Menara air h = 5 m
Bak kamar mandi
JUMLAH
PEKERJAAN LISTRIK

1.
2.
3.
4.
5.
6.
7.
8.
9.

M.

Titik lampu SPLN fitting ulir warna muda+jaringan


Lampu SL 18 Watt ex. PHILIPS
Lampu TL Ganda 40 watt ex PHILIPS
Lampu Pijar 15 watt ex PHILIPS
Saklar TUNGGAL SPLN warna muda ex. Broco + jaringan
Saklar DOUBLE SPLN warna muda ex. Broco + jaringan
STOP Kontak SPLN warna muda ex. Broco+jaringan
MCB+Box sekring
Biaya pasang listrik baru
JUMLAH
PEKERJAAN PENGGANTUNG PENGUNCI

1.
2.
3.
4.
5.
6.
7.

Grendel Pintu
Engsel Pintu
Slot Tanam Pintu
Handle Pintu
Engsel jendela
Grendel Jendela
Handle jendela
JUMLAH

6|Lampiran

JUMLAH TOTAL

308.684.251,29

JUMLAH DIBULATKAN

308.680.000,00