Professional Documents
Culture Documents
Project Location Boring No. Sample No. Depth of Sample TO Date of Testing Tested by
Project Location Boring No. Sample No. Depth of Sample TO Date of Testing Tested by
DD/MM/YYYY
SAMPLE Wt OF TOP DIAMETER SHEAR BOX Wt. OF WT SOIL + CAN Wt. OF DRY SOIL + CAN Wt. OF CAN Wt. OF WATER Wt. OF DRY SOIL WATER CONTENT AREA LOADING SPEED LRC (gram) (cm) (gram) (gram) (gram) (%) (cm) (cm) (cm2) (mm/mnt) (kg/div)
Load (kg)
Time
10
15
20
25
Stress (kg/cm2)
0 15 30 45 60 75 90 105 120 135 150 165 180 195 210 225 240 255 270 285 300 315 330 345 360 375 390 405 420 435 450 465 480 495 510 525 540 555 570 585
600
MAX
30
150
c
100
50
0 0 50 100
Normal Stress (kPa)
150
200
kPa
Soil Mechanics Laboratory Civil Engineering Department, Faculty of Engineering University of Indonesia
Depok 16424 Telp. +62 21 788 49102, Fax. +62 21 788 49102
UNCONFINED TEST
PROJECT LOCATION BOREHOLE NO. DEPTH OF SAMPLE DATE DD/MM/YYYY TESTED BY m
180
160
140
120
100
80
60
40
20
(c) ()
kPa