Telecom Scheduling

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

S. No.

Activity Name Feasibility Study Data collection and market surveys Profitability analysis, growth projection Regulation Regulatory requirements and approvals Other statutory requirements Legal issues Finance Planning, negotiation and raising funds Network Planning and Design Topological Design Network Synthesis Network Realisation Selection of suppliers Selection of hardware(wireless eqiupment) vendors Vendor selection- Infrastructure Site Selection Field visits Negotiations Tower Erection Material Delivery Foundation Tower Installation Generator installation Other civil works- shelter, fence etc Electrical Installation Installation of Wireless Equipment Integration of tower and equipment Network Integration, Testing and Rollout Load testing Network checks On Air

Duration (Weeks) 1-8 8 6 2 7-12 6

3 4

6 4 4

9-12 9-12

4 4

11-14

4 1 1 6 1 1 1 1 4

13-16

17-22

23-26

4 Total Time- 26 weeks

You might also like