Sr.
No.
EQUIPMENT DESCRIPTION
EQUIPMENT
NUMBER
ELEV.
GRID
FOUNDATION FOUNDATIO
READY FOR N READY FOR
ERECTION
GROUNTING
CENTRIFUGE (CENTRIFUGAL
SEPARATOR)
125.S.437
0.0 M
18 TO 19
28/02/12
125.P.438
0.0 M
18 TO 19
28/02/12
125.P.524
0.0 M
19 TO 20
28/02/12
125.P.525
0.0 M
19 TO 20
28/02/12
3
4
105.P.516
0.0 M
6 TO 7
28/02/12
REJECT KK FILTER
125.F.435
10.0 M
17 TO 18
15/03/2012
REMARKS
EQUIPMENT DESCRIPTION
EQUIPMENT
NUMBER
ELEV.
GRID
FOUNDATION
READY FOR
ERECTION
FOUNDATION
READY FOR
GROUNTING
REMARKS
start mulai tgl 20/02/12
AGEING DRUM 7
110.A.527
0.0 M
8 TO 13
25.2.12
20-21/02/12
AGEING DRUM 8
110.A.528
0.0 M
8 TO 13
25.2.12
20-21/02/12
110.V.555
0.0 M
8 TO 13
28.2.12
110.V.556
0.0 M
8 TO 13
28.2.12
110.P.537
0.0 M
8 TO 13
110.P.538
0.0 M
8 TO 13
110.P.539
0.0 M
8 TO 13
110.P.540
0.0 M
8 TO 13
110.W.534
0.0 M
8 TO 13
28.2.12
10
110.W.535
0.0 M
8 TO 13
28.2.12
11
110.W.536
0.0 M
8 TO 13
28.2.12
12
110.V.531
0.0 M
8 TO 13
1.3.12
13
110.V.532
0.0 M
8 TO 13
1.3.12
14
110.V.533
0.0 M
8 TO 13
1.3.12
110.B.549
0.0 M
13 TO 15
25.2.12
110.P.550
0.0 M
13 TO 15
110.P.551
0.0 M
13 TO 15
belum pouring/2023/02/12
belum pouring/2023/02/12
At drawing Fc, no
foundation required
At drawing Fc, no
foundation required
At drawing Fc, no
foundation required
At drawing Fc, no
foundation required
belum pouring/2023/02/12
belum pouring/2023/02/12
belum pouring/2023/02/12
belum pouring/2024/02/12
belum pouring/2024/02/12
belum pouring/2024/02/12
110.P.552
0.0 M
13 TO 15
110.W.553
0.0 M
13 TO 15
25.2.12
22-23/02/12
110.W.554
0.0 M
13 TO 15
25.2.12
22-23/02/12
115.R.540
0.0 M
15 TO 16
26.3.12
20-22/02/12
115.R.541
0.0 M
15 TO 16
26.3.12
20-22/02/12
115.R.542
0.0 M
15 TO 16
26.3.12
20-22/02/12
24
120.R.541
0.0 M
16 TO 17
25.2.12
23-24/02/12
25
120.B.563
0.0 M
16 TO 17
25.2.12
23-24/02/12
26
120.R.501
0.0 M
16 TO 19
26.3.12
24-26/02/12
27
130.B.502
0.0 M
16 TO 17
26.3.12
24-26/02/12
28
120.R.533
0.0 M
16 TO 19
25.2.12
25-26/02/12
29
120.R.510
0.0 M
16 TO 19
25.2.12
26-27/02/12
30
120.R.502
0.0 M
16 TO 19
26.3.12
27-01/03/12
31
120.R.534
0.0 M
16 TO 19
26.3.12
27-01/03/12
32
120.R.535
0.0 M
16 TO 19
26.3.12
27-01/03/12
33
120.R.503
0.0 M
16 TO 19
26.3.12
27-01/03/12
34
125.B.526
0.0 M
16 TO 19
35
105.W.508
0.0 M
6 TO 7
15
16
17
18
19
20
21
22
23
20-21/02/12
Not Showing at EQP plan
drawing FC rev.13
Not Showing at EQP plan
drawing FC rev.13
Not Showing at EQP plan
drawing FC rev.13
36
105.B.505
0.0 M
6 TO 7
37
105.R.528
0.0 M
7 TO 8
26.3.12
28-01/03/12
38
105.R.529
0.0 M
7 TO 8
26.3.12
28-01/03/12
39
120.B.530
0.0 M
18 TO 19
26.3.12
28-01/03/12
40
105.P.530
0.0 M
7 TO 8
6.3.12
41
105.P.531
0.0 M
7 TO 8
6.3.12
42
105.P.532
0.0 M
7 TO 8
6.3.12
43
SPARE
0.0 M
7 TO 8
6.3.12
44
105.P.534
0.0 M
7 TO 8
6.3.12
45
105.P.535
0.0 M
7 TO 8
6.3.12
46
105.P.536
0.0 M
7 TO 8
6.3.12
47
SPARE
0.0 M
7 TO 8
6.3.12
48
105.P.506
0.0 M
5 TO 6
6.3.12
49
105.P.507
0.0 M
5 TO 6
15.3.12
52
120.P.544
0.0 M
16 TO 17
27.2.12
01-02/03/12
53
120.P.545
0.0 M
16 TO 17
27.2.12
01-02/03/12
54
120.F.542
0.0 M
16 TO 17
55
120.F.543
0.0 M
16 TO 17
56
130.P.507
0.0 M
16 TO 17
27.2.12
01-02/03/12
57
120.P.513
0.0 M
17 TO 18
7.3.12
02-03/03/12
58
120.P.514
0.0 M
17 TO 18
7.3.12
02-03/03/12
59
120.F.511
0.0 M
17 TO 18
60
120.F.512
0.0 M
17 TO 18
61
120.P.566
0.0 M
16 TO 17
6.3.12
03-04/03/12
62
120.P.567
0.0 M
16 TO 17
6.3.12
03-04/03/12
63
0.0 M
16 TO 17
64
0.0 M
16 TO 17
65
115.P.543
0.0 M
15 TO 16
25.2.12
04-07/03/12
66
115.P.544
0.0 M
15 TO 16
25.2.12
04-07/03/12
67
115.P.545
0.0 M
15 TO 16
25.2.12
04-07/03/12
68
115.P.546
0.0 M
15 TO 16
25.2.12
04-07/03/12
69
115.P.547
0.0 M
15 TO 16
25.2.12
04-07/03/12
70
115.P.548
0.0 M
15 TO 16
25.2.12
04-07/03/12
115.P.516
0.0 M
14 TO 15
25.2.12
06-08/02/12
115.P.517
0.0 M
14 TO 15
25.2.12
06-08/02/12
115.P.518
0.0 M
14 TO 15
25.2.12
06-08/02/12
115.P.519
0.0 M
14 TO 15
25.2.12
06-08/02/12
120.W.508
0.0 M
18 TO 19
25.2.12
20-24/02/12
74
75
76
77
78
120.F.564 /
120.F.565
120.F.564 /
120.F.565
79
120.W.509
0.0 M
18 TO 19
24.2.12
20-24/02/12
80
120.P.506
0.0 M
16 TO 18
24.2.12
25-27/02/12
81
120.P.507
0.0 M
16 TO 18
24.2.12
25-27/02/12
82
120.F.504
0.0 M
16 TO 18
83
120.F.505
0.0 M
16 TO 18
84
120.F.536
0.0 M
16 TO 18
85
120.F.537
0.0 M
16 TO 18
86
120.P.538
0.0 M
16 TO 18
24.2.12
25-28/02/12
87
120.P.539
0.0 M
16 TO 18
24.2.12
25-28/02/12
88
120.P.531
0.0 M
18 TO 19
24.2.12
28-02/03/12
89
120.P.532
0.0 M
18 TO 19
24.2.12
28-02/03/12
90
120.B.554
0.0 M
SPINNING
91
120.P.555
0.0 M
SPINNING
92
120.B.569
~ 8.0 M
SPINNING
93
125.P.527
0.0 M
18 TO 19
24.2.12
01-04/03/12
94
125.P.528
0.0 M
18 TO 19
24.2.12
01-04/03/12
95
125.F.516
0.0 M
18 TO 19
96
125.F.517
0.0 M
18 TO 19
97
130.P.503
0.0 M
16 TO 17
24.2.12
01-04/03/12
98
130.P.504
0.0 M
16 TO 17
24.2.12
01-04/03/12
130.P.514
0.0 M
16 TO 17
24.2.12
01-04/03/12
130.P.515
0.0 M
16 TO 17
24.2.12
04-05/03/12
120.W.568
0.0 M
18 TO 19
25.2.12
belum pouring
99
100
101
115.P.512
4.0 M
14 TO 15
26.2.12
05-09/03/12
115.P.513
4.0 M
14 TO 15
26.2.12
05-09/03/12
115.P.514
4.0 M
14 TO 15
26.2.12
05-09/03/12
115.P.515
4.0 M
14 TO 15
26.2.12
05-09/03/12
DRUM FILTER
105.F.511
10.0 M
6 TO 7
8.3.12
DRUM FILTER
105.F.512
10.0 M
6 TO 7
8.3.12
105.R.526
10.0 M
7 TO 8
8.3.12
105.R.527
10.0 M
7 TO 8
8.3.12
140.B.509
10.0 M
6 TO 7
8.3.12
105.B.541
10.0 M
8 TO 9
8.3.12
posisi L-4
105.P.542
10.0 M
8 TO 9
105.P.543
10.0 M
8 TO 9
110.A.501
10.0 M
9 TO 12
10
110.A.502
10.0 M
9 TO 12
10.3.12
11
110.A.503
10.0 M
9 TO 12
10.3.12
12
110.A.505
10.0 M
9 TO 12
10.3.12
13
110.A.506
10.0 M
9 TO 12
10.3.12
14
110.A.507
10.0 M
9 TO 12
10.3.12
110.H.525
10.0 M
9 TO 12
5.3.12
110.H.526
10.0 M
9 TO 12
5.3.12
115.A.506
10.0 M
14 TO 15
6.3.12
115.A.507
10.0 M
14 TO 15
6.3.12
115.A.508
10.0 M
14 TO 15
6.3.12
115.A.509
12.7 M
15 TO 16
6.3.12
115.A.510
12.7 M
15 TO 16
6.3.12
115.A.511
12.7 M
15 TO 16
6.3.12
15
16
17
18
19
20
21
22
23
115.P.531
10.0 M
15 TO 16
5.3.12
24
115.P.532
10.0 M
15 TO 16
5.3.12
25
115.P.533
10.0 M
15 TO 16
5.3.12
26
115.P.534
10.0 M
15 TO 16
5.3.12
27
115.P.535
10.0 M
15 TO 16
5.3.12
28
115.P.536
10.0 M
15 TO 16
5.3.12
29
115.P.537
10.0 M
15 TO 16
5.3.12
30
115.P.538
10.0 M
15 TO 16
5.3.12
31
115.P.539
10.0 M
15 TO 16
5.3.12
32
120.F.515
10.0 M
17 TO 19
23.2.12
05-08/03/12
33
120.F.516
10.0 M
17 TO 19
23.2.12
05-08/03/12
34
120.F.517
10.0 M
17 TO 19
23.2.12
05-08/03/12
35
120.F.518
10.0 M
17 TO 19
23.2.12
05-08/03/12
36
120.F.519
10.0 M
17 TO 19
23.2.12
05-08/03/12
37
120.F.520
10.0 M
17 TO 19
23.2.12
05-08/03/12
38
120.F.521
10.0 M
17 TO 19
23.2.12
05-08/03/12
39
120.F.522
10.0 M
17 TO 19
23.2.12
05-08/03/12
40
120.F.523
10.0 M
17 TO 19
23.2.12
05-08/03/12
41
120.F.524
10.0 M
17 TO 19
23.2.12
05-08/03/12
42
120.F.525
10.0 M
17 TO 19
23.2.12
05-08/03/12
43
120.F.546
10.0 M
17 TO 19
23.2.12
05-08/03/12
44
120.F.547
10.0 M
17 TO 19
23.2.12
05-08/03/12
45
120.F.548
10.0 M
17 TO 19
23.2.12
05-08/03/12
46
120.F.549
10.0 M
17 TO 19
23.2.12
05-08/03/12
47
120.F.550
10.0 M
17 TO 19
23.2.12
05-08/03/12
48
120.F.551
10.0 M
17 TO 19
23.2.12
05-08/03/12
49
120.R.528
13.0 M
16 TO 17
10.3.12
50
120.F.529
13.0 M
16 TO 17
10.3.12
51
13P.W.508
10.0 M
16 TO 17
10.3.12
52
140.P.506
10.0 M
17 TO 18
26.2.12
01-04/03/12
53
140.P.507
10.0 M
17 TO 18
26.2.12
01-04/03/12
54
140.P.508
10.0 M
17 TO 18
26.2.12
01-04/03/12
PULP FEEDER
105.X.524
18.0 M
6 TO 8
23.3.12
PULP FEEDER
105.X.525
18.0 M
6 TO 8
23.3.12
105.B.503
18.0 M
9 TO 10
23.3.12
105.V.544
18.0 M
9 TO 10
23.3.12
105.V.545
18.0 M
9 TO 10
23.3.12
18.0 M
14 TO 16
23.3.12
115.B.501 /
115.B.502
115.H.503
18.0 M
14 TO 16
23.3.12
115.H.504
18.0 M
14 TO 16
23.3.12
115.H.505
18.0 M
14 TO 16
23.3.12
10
115.B.549
18.0 M
13 TO 14
23.3.12
11
115.B.550
18.0 M
13 TO 14
23.3.12
12
115.B.551
18.0 M
13 TO 14
23.3.12
13
120.X.560
18.0 M
16 TO 17
8.3.12
14
120.X.561
18.0 M
16 TO 17
8.3.12
15
120.X.562
18.0 M
16 TO 17
8.3.12
16
BIG CONDENSER
120.B.557
18.0 M
16 TO 17
8.3.12
17
MIDDLE CONDENSER
120.B.558
18.0 M
16 TO 17
8.3.12
18
SMALL CONDENSER
120.B.559
18.0 M
16 TO 17
8.3.12
19
ABSORBER - 2 (K 2000-7)
130.B.506
18.0 M
16 TO 17
8.3.12
20
115.V.520
18.0 M
14 TO 15
8.3.12
21
115.V.521
18.0 M
14 TO 15
23.3.12
115.V.525
18.0 M
15 TO 17
23.3.12
115.V.526
18.0 M
15 TO 17
23.3.12
22
23
24
115.V.527
18.0 M
15 TO 17
23.3.12
25
115.V.528
18.0 M
15 TO 17
23.3.12
26
115.V.529
18.0 M
15 TO 17
23.3.12
27
115.V.530
18.0 M
15 TO 17
23.3.12
140.A.501 to
140.A.503
18.0 M
18 TO 19
23.3.12
28
29
140.F.504
18.0 M
18 TO 19
23.3.12
30
140.F.505
18.0 M
18 TO 19
23.3.12
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 24 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
120.B.540
24.0 M
16 TO 17
23.3.12
130.B.501
24.0 M
16 TO 17
23.3.12
130.V.512
24.0 M
16 TO 17
23.3.12
130.V.513
24.0 M
16 TO 17
23.3.12
130.B.501
24.0 M
16 TO 17
23.3.12
130.X.509
24.0 M
16 TO 17
23.3.12
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m
Awaiting demolition
schafolding elv. 31 m