QUAN LY CONG VIEC THAU PHU NSC/SC

15-Aug Hang muc chinh LMR Chi tiet cong viec


0 MC 1 KVN 2 HTE 3 12-Oct 30-Sep R 30-Sep 30-Sep 30-Sep 25-Sep 30-Sep x 1-Sep x 5-Oct 15-Oct 3-Oct x R07Oct x x x x x x x x x x x x x x x x x x P&S 4 SVN Cotec 5 6 IPC Qtan 7 8 HTE Lsc 9 NSC/SC LB VK 10 Life House 11 S.Do 12 Ser 13 Alu 14 Kro 15 M.A. 16

Cap nhat

9-Mar-12

Hafele 17

Ghi chu

Plinth for Pump at LMR Install Pump room LMR: 8

Install Pump room Basement: 2 E-deck, Piping all system at BSMT Basement, Infra, plant Piping for Sum Pit Pumps Piping inside Riser STP waste water inlet and discharge piping Piping obstruct ceiling: 4AB, 1AB, all PH Coupling Lock for Water Piping SW pool installation Fill Pipe shaft in Technical Riser, other locations Propose ceiling finally As built O&M Infra work

Dai Issue EI Tuan

87909122.xls.ms_office

1/4

Phat hanh EI Noi dung chinh So EI


0 MC 1 KVN 2 HTE 3 P&S 4 SVN Cotec 5 6 IPC

NSC/SC

192 193 194 195 196 197 198

NSC/SC Qtan 7 8 HTE Lsc 9 LB VK 10 Life House 11 S.Do 12

Ghi chu

None E None None None None None

Thau phu do Toan quan ly