TESTS ON TRANSFORMERS
1. IR Values
This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is to be disconnected. c) Line terminal of the megger is to be connected to one of the HV Bushings of Power transformer and Earth terminal of megger is to be connected to Power transformer Body Earth Point. IR Values are to be read on the megger by meggering the Power transformer i) The above Value is to be noted as HV to Body or Earth. ii) Then IR Value between LV terminal and body of Power transformer is to be measured & noted. ii) IR Values between HV & LV terminals are to be measured & noted. iv) The temperature of transformer oil at which the IR Values are measured is also to be noted. v) Particulars of megger is also to be noted. The maximum value shall be 60M at 600C temperature for transformer which are in service. For new transformer the value obtained shall be tallied with manufactures test results. Example: - HV E ---- 5000 Mega Ohm OR INFINITE LV E ---- 5000 Mega Ohm OR INFINITE HV LV ---- 5000 Mega Ohm OR INFINITE
2. Continuity test :Checking of continuity of HV windings and LV windings with megger or multimeter. To know the continuity of windings of the transformer. Example: - On HV side RY-YB-BR- Zero Megaohm or continuity On LV side ry-yb-br- Zero Megaohm or continuity
The values shall be compared with original test results which varies with the transformer ratings.
5.Voltage Ratio Test :When Turns Ratio meter is not available, Voltage Ratio Test is done at Various tap position by applying 3 phase LT (415V) supply on 33 KV side of Power transformer. At Various taps applied voltage and Resultant voltages LV side between various Phases and phases& neutral measured with precision voltmeter & noted. Example :- For any 33/11 KV power trf. Tap position VRY VYB VBR Vry Vyb Vbr Vrn Vyn Vbn 420 413 419 131 130 131 75 74 75 1 2(normal) 418 412 418 132 131 133 76 75 75 . . This test is done to check both the transformer voltage ratio and tap changer.
Example :- For any 33/11 KV power trf. Short circuit current = Rated primary current of the trf X applied voltage X100 Rated primary voltage of the trf percentage Imp of trf The Resultant HV & LV currents are as follows:HV side current in all Phases = Rated HV current of PTR X LT Voltage applied on 33 KV side of PTR X100 Rated primary voltage i-e 33000 X Percentage Impedance Volts LV side phase Current in all phases = Rated LV current of PTR XLT Voltage applied on 33 KV side of PTR X 100 Rated primary voltage i-e 33000 X Percentage Impedance Volts LV side neutral current shall be zero or less than 1.0 amp. For example in a 1.6 MVA trf. the results are:VRY VYB VBR IR IY IB Ir Iy Ib In
417 406 412 5.83 5.75 5.50 17.61 17.05 17.50 0.45
Short circuit current = 28 x 417 x100 = 5.75 A similarly for LT side On HT side 33000 x 6.25
-3-
Voltages between Rn; Yn; RY Voltages between Yb; Yy; Voltages between Bb; By; VRY VRn VYn VYb 414 78 334 300
Vyn 72
Vbn 73
-4-
or induced over
voltage test:This test is done to check the insulation strength between inter turn of coils or windings. In this test double the rate of voltage and double rate of frequency is applied to the secondary side of the trf. for one minute keeping HV open. For a 11/0.4 KV distribution trf. 866 volt and 100 HZ is applied on LV side of the trf. for 1 minute keeping HV open.. For a 33/11 KV power trf. 22 KV and 100 HZ is applied on LV side of all the three phases of the trf. through a auxiliary transformer for 1 minute keeping HV open.. Auxiliary trf. is a 11/0.4 KV trf. to whom 800 volt is applied on LT side so that 22 KV will come on HT side that 22 KV is applied to the LT side of power trf. and 100 HZ through a synchronous motor.
12. Phase sequence test :This test is done to check the proper phase sequence of trf. n with the help of phase sequence indicator. i-e R-Y-B and r-y-b-
Check that 1) Top & Bottom valves of radiators are in open position 2) All drain valves are in closed position with dummy plates in position duly fitted with bolts & nuts 3) All filler valves in closed position with dummy plates in position duly fitted with bolts & nuts 4) No oil leakages from radiators, valves, dummies, top cover, inspection covers, oil level gauges etc. 5) Silica gel breather is in position with silica gel filled & oil in oil cup 6) The air path of silica gel breather is free with out any seals to holes of the oil cup 7) Equalizing valve of the interconnecting pipe of vent pipe to conservator tank is in open position 8) Top oil filling point of conservator tank is in closed position with cover duly bolted. 9) The valves on either side of Bucholtz relay are in open position. 10) Thermometer pockets on main tank top cover are having oil inside & Thermometer sensing bulbs are in position duly nuts fixed properly. 11) The double earthing of neutral of Power transformer is done as per standards. 12) The double earthing of body of Power transformer is done as per standards. 13) The oil levels in conservator tank, OLTC Conservator tank. 14) The operation of main Bucholtz relay & OLTC Bucholtz relay ( Trips &alarms to be checked) 15) Operation of Transformer alarms. 16) The operation of PRV to trip the breakers or operation of alarms 17) The vent pipe diaphragm is intact. 18) The lock pieces are provided, duly welded to base channels, for the support wheels of transformers (If wheels are provided) 19) Tightness of all bolts, nuts, clamps, jumpers etc. 20) Testing of earth resistance by earth megger Generally earth resistance of a s/s is measured with the help of earth megger or earth tester. A earth megger is like a insulation megger. It has five point terminals i-e C1,P1,G,P2,C2 and three earth spikes with wires. First put the first spike inside the ground then connect the spike wire to the point C1 making C1 and P1 short in the megger. Again put another spike inside the ground at a distance of 12.5 mt from the first spike in a straight line and connect the wire to P2 similarly put another spike at a distance of 12.5 mt from the second spike in a straight line and connect it to point C2 in the megger. The move the handle of the megger to measure the earth resistance it should be in-between 1 to 3. (<1 is good) 21)Before charging the PTR air is to be released from air releasing points of main tank cover of PTR, OLTC top cover, Bucholtz relays, radiators, bushings, (All releasing bolts, screws, valves shall be kept in position fully tightened after releasing air from respective points).
Tests on Breakers
A) I) Status of Breaker Open Measure IR values between IN & Out terminals Each limb of breaker shall be more than 3000 M II) Status of Breaker Close Measure resistant of each limb by connecting IN & Out terminals to a precision Micro ohm meter it should be zero. The values shall tally with manufacturers test report. -6-
III) Status of Breaker Close Measure IR values between phase & Body ground terminal of breaker for all limbs the values shall be more than 3000 M B) Opening time & closing time tests to be done on all limbs. The values shall tally with test results of the Manufacturer. C) Test mechanical ON and OFF of VCB and indication of VCB and breaker. D) Similarly electrical ON and OFF of VCB and indication of VCB and breaker on both remote and local. E) As follows: a) IR values of current Transformers are to be measured. b) Polarity check on current transformers is to be made. c) Primary injection test on current transformer is to be done to check operation of relays functioning of meters and CT accuracy. Let CT ratio is 400-200-100/1-1 A then test the ct in different current ratings in all the three adopted ratios like 400/1 and 200/1 or 100/1 A by injecting currents like 25,50,100,150,200,250,300,400 etc. testing is done at different PSM. d) Secondary Injection test on relays is to be done. e) DC tests on breakers panel are to be done. f) Calibration of meters is to be done. g) D.C. interlock are to be tested. h) Check that all Jumpers, clamps etc. are in to CT i) Clean all the bushings. j) Ensure no leakages from the CTs. k) check proper earthing of CTs, Panel and breaker with flat separate earth. l) before wiring study carefully the Ckt. Diagram of VCB. Tests on Potential Transformers A) IR value are to be checked with megger. B) Ratio test is to be done. C) Polarity check is to be done. D) Check that there are no oil leakages E) Clamps & Jumpers properly tightened. Tests on CURRENT Transformers A) IR value are to be checked with megger. B) Ratio test is to be done through primary injection CT injection. C) Polarity check is to be done. D) Check that there are no oil leakages E) Clamps & Jumpers properly tightened Tests on protective relays A) Current injection of Relay through secondary injection kit. B) tripping time test through secondary injection kit..
a) IR value are to be checked. b) Jumper connection to be checked Other tests in a Sub Station a) b) c) d) Battery charger & Battery to be checked for proper operation Earth Resistance is to be measured & noted. Meggering of Bus Bars is to be done. Check the entire earthing system in the Sub Station is as per standards.
Or H.V. side line current =KVA/20 =100/20=5 A L.V. side line current =KVA + 1/3 rd of KVA= 100 + 33.33=133.33 A For 1000 KVA 33/11 KV power trf. H.V. side line current = Rating of trf. in KVA 3 X Voltage on HV side in KV L.V. side line current = Rating of trf. in KVA 3 X Voltage on LV side in KV L.V. side line current =KVA/20 =1000/20=50A H.V. side line current = L.V. side line current /3=17 A