GANG LEADER / MAISTRY & GANGS / FITTERS VERY LITTLE OR NO EDUCATION NO FORMAL TRAINING LEARNT THE JOB ONLY BY OBSERVATION & EXPERIENCE FOLLOW TRADITIONAL WORK METHODS IGNORANT OF CONSEQUENCES RESISTANCE TO USE SAFETY BELTS /HELMETS PRODUCTIVITY AT THE COST OF SAFETY
NON-USE OF PPEs
INADEQUATE / IMPROPER GUYING ARRANGEMENT
ii.
iii.
iv.
v.
vi.
ALL THE WORKERS INSIDE THE PIT SHOUD WEAR SAFETY HELMETS
BLASTING
WITH
ADEQUATE
ONLY LICENSED BLASTER TO BE ENGAGED PUBLIC / LIVE STOCK TO BE MOVED TO SAFE DISTANCE CONTROLLED BLASTING TO BE DONE NEAR RESIDENTIAL AREAS / INSTALLATIONS
THE CONCRETING SHOULD BE COMPLETED, AS FAR AS POSSIBLE, WITHIN 48 HOURS OF EXCAVATION, AS THE STABILITY OF THE PIT DECREASES WITH INCREASE IN TIME.
SAFETY PRECAUTIONS DURING STUB-SETTING / CONCRETING MACHINES LIKE CONCRETE MIXER, VIBRATOR, ETC, SHOULD BE PLACED SUFFICIENTLY AWAY FROM THE PIT TO AVOID COLLAPSE OF THE PIT DUE TO VIBRATIONS PRODUCED BY THESE MACHINES.
ALL LADDERS BEING USED SHOULD BE OF SOUND CONSTRUCTION, FREE FROM ANY DEFECTS AND SHALL EXTEND AT LEAST ONE METRE ABOVE THE GROUND LEVEL.
SAFETY PRECAUTIONS DURING STUB-SETTING / CONCRETING ALL THE WORKERS WORKING INSIDE THE PIT MUST WEAR SAFETY HELMETS. THOSE COMING IN CONTACT WITH CONCRETE MUST WEAR BOOTS / GUMBOOTS.
JACKS USED FOR POSITIONING THE TEMPLATE SHALL BE PROPERLY PLACED AND AWAY FROM THE EDGE OF THE PIT
SAFETY PRECAUTIONS DURING TOWER ERECTION CHECK ALL THE T&P BEFORE COMMENCEMENT OF WORK.
ENSURE ALL TOWER MEMBERS HAVE BEEN RECEIVED AT ERECTION SITE BEFORE COMMENCEMENT OF TOWER ERECTION MISSING MEMBERS SHALL BROUGHT FROM THE STORE BE IMMEDITELY
PROGRESSIVE TOWER ERECTION WITHOUT FIXING THE REQUIRED MEMBERS WILL REDUCE THE STABILITY & LEAD TO UNBALANCED LOADING
SAFETY PRECAUTIONS DURING TOWER ERECTION ALL THE PERSONS CLIMBING UP THE TOWER SHOULD BE PROVIDED WITH GOOD QUALITY SAFETY BELTS. THEY SHOULD ANCHOR THE LIFE LINE OF THE BELT TO A STRONG ANCHORAGE POINT IMMEDIATELY ON REACHING THEIR WORKING POINT.
SHUTDOWN OF STATE EB POWER LINES, WHEREVER REQUIRED, SHOULD BE TAKEN, AND NO SHORT CUT METHODS USED AND CHANCES TAKEN.
SAFETY PRECAUTIONS DURING TOWER ERECTION Possibility of falling while climbing up / coming down
SAFETY PRECAUTIONS DURING TOWER ERECTION Possibility of falling while fixing of members
PROPER FIXING OF COTTER PINS AND THEIR VERIFICATION BEFORE HOISTING THE INSULATOR STRING.
ADEQUATE NUMBER OF BACK STAYS ARE PROVIDED FOR ALL THE CROSS ARMS, AND PROPERLY FIXED TO THE DEADMENT BEFORE TAKING UP TENSIONING.
LOAD BEARING LINKS SUCH AS D-SHACKLES, COME-ALONG CLAMPS, STEEL ROPES, PULLEYS, ETC., ARE DOUBLY CHECKED FOR THEIR SOUNDNESS.
SAFETY PRECAUTIONS DURING STRINGING SHUTDOWN OF POWER LINES, WHEREVER REQUIRED, ARE TAKEN, AND NO SHORT CUT METHODS USED AND CHANCES TAKEN. ADEQUATE CAPACITY LOCAL EARTHS ARE USED ON BOTH SIDES OF THE WORK AREA TO PREVENT ANY ELECTRIC SHOCK DUE TO INDUCTION, WHILE WORKING NEAR CHARGED EB LINES. THESE EARTHS ARE PROPERLY FIXED TO ENSURE PROPER CONTACT WITH THE CONDUCTORS.
PROPER SCAFFOLDING ARRANGEMENTS ARE MADE DURING STRINGING OF CONDUCTOR AT ROAD CROSSINGS AND RAILWAY CROSSINGS.
THE STRINGING MACHINE / TENSIONER / PULLER ARE PROPERLY ANCHORED & PROPERLY EARTHED WHEN STRINGING ACTIVITY IS CARRIED OUT TO PREVENT ANY ELECTRIC SHOCK DUE TO INDUCTION / LIGHTNING TO THE OPERATORS.
SAFETY PRECAUTIONS DURING STRINGING FINAL SAGGING SHALL BE DONE USING MACHINE ONLY WINCH
SAFETY BELTS ARE ANCHORED WHILE THE COMING DOWN THE STRING TO REACH THE CONDUCTOR.
SAFETY BELTS ARE PROPERLY ANCHORED / LOOPED WHILE THE PERSON IS MOVING ALONG THE INSULATOR STRING / CONDUCTOR.
FLAG MEN ARE POSTED AT ALL THE INTERMEDIATE TOWERS WITH PROPER SIGNALING FLAGS AND COMMUNICATION GADGETS LIKE WALKIE TALKIE AND THEY ARE KEEPING WATCH OVER THE MOVEMENT OF GENERAL PUBLIC / CHILDREN AND WARNING THEM WHEN THEY COME CLOSE.
GENERAL SAFETY REQUIREMENTS AVAILABILITY OF DETAILED WORK PROCEDURES / CHECK LIST / INSTRUCTIONS AT SITES, IN THE LANGUAGE UDERSTOOD BY THE WORKERS. AVAILABILITY OF QUALIFIED & EXPERIENCED SUPERVISIORY STAFF FOR SITE ACTIVITIES. ADEQUATE SITE BRIEFINGS & SAFETY AWARENESS MEASURES. POSTING OF EXCLUSIVE SAFETY COORDINATOR AT SITE BY THE CONTRACTING AGENCY . AVAILABILITY OF FIRST AID BOXES WITH ALL CONTENTS WITH EVERY GANG. AVAILABILITY OF ATLEAST ONE VEHICLE AT WORK SITES FOR USE IN CASE OF EMERGENCIES. ADEQUATE PROTECTIONS / WARNINGS PROVIDED TO AVOID INJURY TO GENERAL PUBLIC AND LIVE STOCK. GENERAL PUBLIC, ESPECIALLY CHILDREN NOT BEING PERMITTED NEAR THE WORK AREA.
EXCAVATION / CONCRETING
TOWER ERECTION
STRINGING
THANK YOU
Demarking of safe working areas / unsafe charged areas Issue of work permit to only authorized persons Entry of Authorized persons only and maintenance of proper records Movement of workmen inside the work area, especially during lunch hours Movement of long poles / ladders / cranes Blasting shall be strictly avoided