Suppliier Assy Part No Description Validity DRG No: Final Cost 53.21 Total 53.21 Settled Rate 54.00
Suppliier Assy Part No Description Validity DRG No: Final Cost 53.21 Total 53.21 Settled Rate 54.00
Assy Part No
Drg No
Description
Validity
30.39
Conversion cost=
14.08
Area
0.057024
2.14
ICC
1.00%
0.304
OH
10%
1.41
REJ
1%
0.44
10%
4.45
Painting
ROZC
Profit
Final Cost
Total=
Settled Rate
53.21
53.21
54.00
w\o toooling
validity
156
Raw Material Spec.
5 mm mm fe410
25.25
2500
1180
115.79
216
132
No of Blanks/sheet
90.00
Gross Weight
1.2865
32.48
Fin Wt (Kg)
1.1191
Scrap wt
0.17
2.09
30.39
CONVERSION COST
Operation and M/C
shearing
0.35/kg
Cross Shearing
Marking and drilling
8 holes
Marking and drilling 22.5 dia0.28/stroke
hole
2
Bending 250 T
4 stroke
Notching
By gas cutting and grinding
Deburring
0.45
0.13
6.00
stroke
1.00
4.00
2.00
0.50
TOTAL
14.08
##
27.25
50.55223129
w\o toooling
1
2394
103.56
5 mm mm fe410
28.26
25.25
124
5.00
11
88
124
18
90
12
124
1500
115.79
5
3341
90.00
57.80
1.2865
57.80
32.48
1.1191
fin wt=
1.119096
0.17
2.09
30.39
blank length=
blank width=
19
1250
Suppliier
Assy Part No
Drg No
Description
Validity
7.74
Conversion cost=
2.94
Area
0.025872
0.97
ICC
1.00%
0.077
OH
10%
0.29
REJ
1%
0.11
10%
1.07
Painting
ROZC
Profit
Final Cost
Total=
Settled Rate
13.20
13.20
13.20
w\o toooling
validity
3 mm Fe 410
25.25
2500
1180
69.47
132
98
No of Blanks/sheet
225.00
Gross Weight
0.3088
7.80
0.3046
Scrap wt
0.00
0.05
7.74
CONVERSION COST
Operation and M/C
shearing
0.35/kg
Cross Shearing
Notching 4 strokes
Marking drilling 4 holes 0.28/stroke
Deburring and inspection
0.11
0.10
0.48
2
stroke
2.00
0.25
TOTAL
2.94
##
27.25
12.53947739
w\o toooling
1
2394
103.56
3 mm Fe 410
28.26
25.25
124
3.00
18
12
216
124
25
200
12
50
1500
69.47
3
3341
225.00
57.80
0.3088
57.80
7.80
0.3046
fin wt=
0.304643
0.00
0.05
7.74
blank length=
blank width=
19
1250