Professional Documents
Culture Documents
New Product Development Format
New Product Development Format
New Product Development Format
: Date :
Format No. : FM??????? XYZ PVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL Sheet No. 01 of 05 A. PRODUCT INFORMATION
5. Vehicle Name & Model 6. Effect on existing model 7. Present Production volume 8. Future Production volume 9. Share of business assured (% / Nos. / Value) 10. Competitors
12. Date of prototype sample submission 13. Target date of productionising 14. Data collected 1. Customer Drawing 2. Customer Specification 3. Customer sample 4. Customer testing standards
Date :
ANNEXURE I
Sr No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Quality system requirements Part Submission Warrant Special/Critical Characteristics Process Flow chart Process FMEA Control Plan Attribute Chart SPC studies Gauge R & R Inspections Reports Raw Material Quality plan Raw material test certificates Inspection, Fixtures, Checking aids details Appearance approval reports Design engineering approval Calibration certificates Design FMEA Product Test Reports Advance shipment notification PPAP submission Quality system assessment audit by customer (if yes, please specify frequency of audit) In case of any other requirements, please specify below Required by Customer Yes No Remarks
Please Attach any specific format for the Quality System Requirements as per Sr no.1 to 17 if given by the Customer
21
DATE :
CUSTOMER REPRESENTATIVE
Format No. : FM???? XYZ PVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL Sheet No. 03 of 05 A. DESIGN & DEVELOPMENT 1. Lead time for concept and Product Design 2. Lead time for Design of prototype 3 Lead time for design finalisation a) Product Design b) Parts Design c) Release of BOM 4. Design & Testing expenditure ( If any ) PREPARED BY, NAME : SIGNATURE : _____________
Date :
1. Nos. & Estimated Cost of Jig & Fixtures 2. Nos. & Estimated Cost of Moulds 3. Nos. & Estimated Cost of Gauges 4. Nos. & Estimated Cost of Crates 5. Cost for other infrastructure, if required 6. Cost of Prototyping 7. Total Development cost 8. Lead time for tooling manufacturing 9. Additional Manpower required 1. Skilled :2. Unskilled :Nos / Days Nos / Days
Date
Format No. : FM????? XYZ PVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL Sheet No. 04 of 05 C. INFORMATION PERTAINING TO PRODUCTION ENGG.
1. New facility required 2. New production area required 3. New manpower required 4. Lead time for production 5. Assembly / sub- Assembly outsourcing required
Yes / No
Details enclosed :
Yes/ No
Date
1.
Format No. : FM/??? ??? XYZPVT. LTD. NEW PRODUCT DEVELOPMENT PROPOSAL Sheet No. 05 of 05
D. MANAGEMENT APPROVAL
RECOMENDATIONS Total lead time required for development : Total investment To be taken up for development w.e.f. To be taken for development after To be kept pending till Not to be developed CROSS FUNCTIONAL TEAM Project leader Team members Special Note : : : : : : : : Rs.
Date :
APPROVING AUTHORITY